DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project Update – January 2011 New Travel Choices Ahead.
Advertisements

Some things cant wait for traffic Capital Beltway HOT Lanes Project Fairfax County TAC Update – August 16, 2011 New Travel Choices Ahead.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Capital Beltway HOT Lanes Project Project Update March 2009.
Capital Beltway HOT Lanes Project Project Update April 2009.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Aledo Trail Traffic Control December 19, 2013 P HASE 1 SWITCH TO PHASE 2.
What is the S-48 Corridor? Study Area What’s Happened So Far? Previous Tasks  Project InitiationJune 2005  Existing ConditionsOct  Planning.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
NC 73 Small Project Scoping Process Update June 24, 2014.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
Field Trip Presentation Bethany McGrath EFC II 4 th Hour.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Independence Blvd. (Hwy 74 West) Toward downtown Charlotte Prepare to exit right (exit 243) Charlottetowne Ave.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Region 1 Traveler Information on 2010 Construction Route 7 over I-87 (Exit 6) Bridge Replacement Town of Colonie.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
SR A1A / SR 200 Reconstruction Project
Module 5 Displaced Left Turn (DLT) Intersections
Third & Fourth Streets Traffic Calming Study Presentation to Transportation Commission May 14, 2015.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
The Roads Ahead Leroy D. Alloway, Director Community Development.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Lexington Town Center Streetscape Project Page 1 Battle Green Improvements Project Intersection of Bedford Hancock Street / Harrington Road Board.
Current Construction Projects Major Projects Pinellas County.
South Parkway Refinement Plan F Context of the plan F Goals of the plan F Major issues F Parkway/Third Street alternatives F City of Bend, ODOT assess.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Module 5 Destination Drive Passing Freeway Driving Multilane Intersections Ramp Meters.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
Community Development Department Construction Phase BULLDOG DRIVE.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Route 55: Lauer Rd –TSP & Access Management. Agenda  Welcome and Introductions  Workshop Purpose  Project Introduction & Background  Citizen Advisory.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
September 15, 2011 Presented by: Clay Harris, PMP - City of Austin Federico Mendoza, PE, PTOE – Brown & Gay Engineers, Inc. Todd Lane Alternative Geometric.
Safety Is Everyone’s Responsibility May Today’s Agenda Central Corridor Light Rail Overview Safety Outreach Program –Do’s and Don’ts –Safety video.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Visit Our Website at: Click to edit Master title style.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
2009 Sales Tax Extension Project Status Update. 2 Background Sales Tax was extended via August 26, 2008 referendum. Sales Tax was extended for an additional.
Integrity - Competence - Service Hogan Road/Exit 187 Proposed Improvements Public Informational Meeting June 9, 2016.
Secor Road Reconstruction Project Public Meeting #2
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Double Crossover Diamond Interchange
Contract 60X10 Informational Meeting Weber I-55
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Harbour Island Force Main Replacement
Metropolitan District | mndot.gov
Presentation transcript:

DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014

Program Background and History DDI Roadway Design and Benefits Traffic Pattern Changes During Remaining Construction Q & A

Background and History Exit 28 – Cornelius’ sole interchange – One of two primary east-west connectors – Daily Vehicular Trips I-77 – 92,000 per day West Catawba Ave. – 27,000 per day Catawba Ave. – 26,000 b/w I-77 and Hwy. 21; 15,000 east of Hwy. 21 Growth – Cornelius and North Meck – Early 90s: Cornelius approximately 2,000 population – Today: Greater than 26,000 – Buildout: At least mid-30,000s

Background and History Corridor Solution – West Catawba Ave., Interchange, Bookends, and Catawba Ave. West Catawba Ave., Phase I widening complete West Catawba Ave., Phase II ranking underway (as early as 2018) Hwy. 21/Catawba Ave. Intersection - Preliminary Roundabout design Torrence Chapel/West Catawba Intersection – Study in FY15 Catawba Ave. – Traffic modeling underway for strategic turn lanes

DDI Roadway Design and Benefits Vehicular Safety – Eliminates left-turn conflicting movements Traffic throughput – Eliminate phases at intersections Left turn free flow (eliminates a phase) Crossing bridge from same time as opposing movement (eliminates a phase) Pedestrian Safety

Video

Construction/Traffic Schedule June 20 th weekend bridge closure – 32-hour continuous period Friday midnight – 8am Sunday – Detours to Exits 25 and 30 and Westmoreland Road – No through traffic across bridge – Ramps still available as long as not serving a movement that requires bridge crossing Available: Town Hall to Mooresville, West Catawba to Charlotte Not Available: Town Hall to Charlotte, West Catawba to Mooresville – Allows for the Traffic pattern shift to the DDI pattern

Alternate Routes From the East Side to the West Side I-77 North to Exit 30 Griffith St., take a left at the top of the Exit 30 ramp and a left to get back onto I-77 Southbound, and then get off at Exit 28 (also vehicles traveling from Charlotte to the West Side) Highway 115 North through Davidson and take a left onto Griffith Street, take a left onto I-77 South, then get off at Exit 28 Highway 21 South; take a right onto Westmoreland Road to the West Catawba Ave. intersection

Alternate Routes From the West Side to the East Side West Catawba Ave. to Westmoreland Road, then take a left on Highway 21 North West Catawba Ave. then a left onto Sam Furr Road, then turn left onto I-77 North I-77 South, get off at Exit 25, left at the top of the exit ramp, then turn left onto I-77 North (also for traveling from Mooresville to the East side)

CATS Village Rider The Village Rider (VR97) will still be operating during the closure with all stops available, but will have to follow the detours. Scheduled stop times will be different. During the period of only one lane; the Village Rider will operate as normal. Call (704)336-RIDE (7433) or visit for more information.

Construction Schedule June –~November 2014 – Significant day and night lane closures will occur – Approximately months – At all times, only one lane open in each direction across bridge – Construction of the medians, walls, permanent traffic signals, sidewalks, etc. ~November 2014 – Substantial Construction complete Town’s Aesthetic project will likely begin late 2014/early 2015 – ~6 months – 4 Masonry Abutments – Landscaping

Q & A Contacts to stay informed – Tyler Beardsley, Cornelius Project Manager – – ext Follow us on Subscribe to “General Town News” at for info ed or texted.