EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

Operation & Maintenance Engineering Detailed activity description
ASPRS 2005 Annual Conference, Baltimore, Maryland Camera Calibration, Characterization and Contracting Guidelines: An Quality Assurance Perspective U.S.
PEAK-Service structure Founded in 1992, 90 field service engineers in Europe European Headquarters in Germany (Darmstadt) Corporate management Technical.
CUSTOMER SERVICE. Customer service is a series of activities designed to enhance the level of customer satisfaction – that is, the feeling that a product.
SBS Vendor Management™
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Understand properties of fibrous.
World Health Organization
EQUIPMENT VALIDATION.
Good Manufacturing Practices Guilin, PRC Dr AJ van Zyl for Quality Assurance and Safety: Medicines Medicines Policy and Standards Health Technology and.
Network Design and Implementation
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce crude tall oil by the.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Supplementary Training Modules on Good Manufacturing Practice
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Coat paper or board using a coating.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
Qualification of HVAC systems
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
CPA is a UKAS company The Assessment Process 2014 Seminars.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Seafood HACCP Alliance for Training and Education Chapter 10 Principle 6: Establish Verification Procedures.
A Seminar on 1.  Why to validate?  Parts of Equipment Validation  Who should do Equipment Validation?  Equipment qualification  Typical process flow.
World Health Organization
ANALYSI Web: ANALYSIS LTD Gandijeva 76A Novi Beograd tel/fax:
CLINICAL ENGINEERING part(3) Dr. Dalia H. Elkamchouchi.
Delcam Professional Services Antony Hall Business Development Manager Delcam plc.
Technical Department Web Applications KIDNEY CENTER, INC 50 Moreland Rd, Simi Valley, California Telephone: (805) * Fax: (805)
From Research Prototype to Production
Information Systems Chapter 10 – Computers: Understanding Technology, 3 rd edition 1November 13, 2008.
Industrial Engineering Roles In Industry
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
Water | Slide 1 of Water for Pharmaceutical Use Part 3: Operational considerations Supplementary Training Modules on Good Manufacturing Practice.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 3 Receive and store logs in a woodyard.
1 © Quality House QUALITY HOUSE The best testing partner in Bulgaria.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Provide a continuous supply of.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce chemical compounds by.
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Produce recyclable chemical compounds.
1 Commissioned by PAMSA and German Technical Co-Operation National Certificate in Paper & Pulp Manufacturing NQF Level 4 Generate chlorine dioxide for.
Validation Validation: A systematic study which ensures that systems, facilities and processes are working adequetly and precisely. Validation is an integral.
Chapter 19 Manufacturing and Quality Control
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Visit us at E mail: Tele:
PSL Metrology Pte Ltd – CSE Training Overview PSL Metrology Pte Ltd, confidential.
World Health Organization
Water for Pharmaceutical Use
BUSINESS PROCESSES MAP
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
Low temperature chiller Market Survey
DSQR Training Supplier Quality Manual
Identification of Processes Turtle Diagrams Approach
BU IS GIG Chemical, Oil & Gas
Across the entire value chain
Process Maps and Turtle Diagram Example
APQP Quality Planning in ISO 9000/ QS-9000 or ISO/ TS or .....
Insert Product Photograph Here
ולידציה מול כיול-השונה והדומה
World Health Organization
Turtle Diagram Maintenance Department Continuous Improvement
Identification of Processes Turtle Diagrams Approach
Identification of Processes Turtle Diagrams Approach
Standard Business Processes
Identification of Processes Turtle Diagrams Approach
Presentation transcript:

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Scope  Service Department offers after sales service for products sold by EG Medical Systems.  Service department take care with following products: 1.Dialysis Machines from Fresenius Medical Care 2.Multifiltrate Machines from Fresenius Medical Care 3.Central Delivery Systems for manufacturing the concentrate in-house and distribute it to Dialysis Machines from Fresenius Medical Care 4.Water Treatment Units with its spare parts and consumables from Fresenius Medical Care and other European and American suppliers.  Service Department Team consists of 65 qualified Engineers and Technicians which equipped with required product knowledge, Tools and measuring tools.

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Service Department Values  Service Department offers Consultancy (deals with experts) to its customer through: 1.Supporting our customer to make design and supply all medical solutions. 2.Evaluation of medical devices upon customer request. 3.Calibration certificate for all machines of Fresenius Medical Care.  Due EG medical systems enjoy high qualifications and long history in the field, the service department team is offering turnkey service.  Full coverage for all Egypt via qualified 65 engineers & technicians.  The service department delivers the highest quality to our customer through : 1.Response time within 24 Hours (MTTR) 2.Control and monitoring performance sheet of Machines (MTBF) 3.Original and reliable spare parts stock. 4.Preventive and corrective maintenance

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Haemodialysis Building through EG

EG Medical Systems Maintenance BU MEDICAL SYSTEMS ProductsProject Engineering Technical ServiceQuality Service FWT Product Centre

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Validation Program IQOQPQ Monitoring Phase

EG Medical Systems Maintenance BU MEDICAL SYSTEMS Documentation Validation program IQ (Installation Qualification) = “as built” documentation –system flow diagrams and layout, –log books and operator's manuals –Validation plan OQ (Operation Qualification) = system start-up –test records; –set-up record; –calibration schedule; –sampling procedures; –maintenance and monitoring plans; –record of operator(s) training PQ (Performance Qualification) = demonstration of a consistent pattern –test records; –chemical and microbial analyses; –key performance indicators [for example, pretreatment efficiency, reverse osmosis (RO) recovery/rejection rate, etc.]; –(initial) trend analysis.(ref ISO 23500:2011 Ch. 6)