1 National Pollutant Discharge Elimination System Permit B P Products North America Whiting Refinery.

Slides:



Advertisements
Similar presentations
EO TP3 SAMPLING WASTE DISPOSAL SYSTEMS.
Advertisements

1 National Pollutant Discharge Elimination System Permit United States Steel Gary Works NPDES Permit IN
What are TMDLs? and What Might They Mean to MS4 Permittees?
Wastewater Permit Renewals
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Indiana Department of Environmental Management
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
1 Mixing Zones, Reasonable Potential Analysis, and Permit Limits A Quick Overview Steve Schnurbusch Oregon Department of Environmental Quality
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
Module 6 Effluent Monitoring and Receiving Water Monitoring.
WWTF’s MPCA Permit Renewal January 14,  Our current NPDES permit expired Sept. 30,  NPDES permits are a 5 year term.  Upon expiration,
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
WASTEWATER ENGINEERING
1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Water Treatment Plant General Discharge Permit
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems  Filtration avoidance criteria  Alternatives to Filtration.
Water Treatment for NYC Croton Schematic. NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration.
NYC Filtration Plant for Delaware and Catskill Systems ä Filtration avoidance criteria ä Alternatives to Filtration? ä Where should the plant(s) be located?
Wastewater generation
WQBELs Karen Holligan May 6, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
Implementation of Antidegradation Policies for Indiana Waters.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Clean Water Act Section 316(b) Proposal Regulations for Cooling Water Intake Structures at Existing Facilities April 6, 2011.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Implementation Procedures (IPs) Brittany Lee Standards Implementation Team
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
Paul Novak, Ohio EPA. Committee Meetings/Agenda  March call of full committee  April meeting with IDEM, OEPA, ORSANCO on streamlined variance.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
NPDES Wastewater Permitting Update 2015 NCMA Workshop Tom Belnick DWR/NPDES Permitting.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Eric Agnew Environmental Regulations February 15, 2006.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
ENVIRONMENTAL PRIORITIES PANEL Chris Korleski, Director, Ohio EPA Tom Easterly, Commissioner, IDEM Official Representing New KY Governor Beshear.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Screening: Wastewater entering the treatment plant includes items like wood, rocks, and even dead animals. Unless they are removed, they could cause problems.
Procedures to Implement the Texas Surface Water Quality Standards
New Hampshire State fish hatchery effluent discharge and EPA/NPDES permit story.
ANTIDEGRADATION and THE BENEFITS OF PUMP LOGS FOR BATCH DISCHARGES Given by: Dan Murray, Terrell Hendren and Josh Frazier.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
1 Water Quality Antidegradation: Guidance to Implement Tier II Summary of Discussion: Review the Tier II Rule requirements. Clarify what feedback we are.
Changes to § Application of Standards and §307.9-Determination of Standards Attainment Gregg Easley Water Quality Standards Team Texas Commission.
Water Sources & Pollutants FS Unit 5 FCS-FS-5: Students will discuss why water and pH are important factors in food preparation and preservation. C. List.
76. The central U.S. law regulating water quality is the Clean Water Act (CWA), adopted in The Act initially focused on point sources, which it.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
PUBLIC HEARING September 15, Draft NPDES Permits for ArcelorMittal Facilities Indiana Harbor West, Central Wastewater Treatment Plant, Indiana.
Connie Brower NC DENR Division of Water Resources.
WQBELs Karen Holligan September 23, WQBELs – A Four-Piece Puzzle Numerical criteria (toxic pollutants) Water body quality Effluent fraction Bioavailable.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
Slide 1 California Implementation Water Board Policies.
Water Quality Standards Regulation (9 VAC ) Rulemaking: Bacteria, Ammonia, Human Health and Aquatic Life Criteria.
FUTURE REQUIREMENTS AND GOALS
Module 17: MIXING ZONES A limited area or volume of water where initial dilution of a discharge takes place and where numeric water quality criteria.
Cara Cowan Watts Graduate Student Biosystems Engineering
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
John Tinger U.S. EPA Region IX
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Clean Water Act (CWA) Purpose
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Spencer Bohaboy Policy Development Specialist Water Quality Policy
Water Quality-Based Effluent Limits
Indiana Department of Environmental Management Office of Water Quality
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Procedures to Implement the Texas Surface Water Quality Standards
Presentation transcript:

1 National Pollutant Discharge Elimination System Permit B P Products North America Whiting Refinery

2 Agenda Public Meeting Draft NPDES Permit for BP Products Opening Remarks Opening Remarks Presentation of the changes at the Whiting Business Unit by BP Presentation of the changes at the Whiting Business Unit by BP Presentation of the draft NPDES permit by IDEM Presentation of the draft NPDES permit by IDEM Break, collection of questions from the audience Break, collection of questions from the audience Response to questions submitted by the audience Response to questions submitted by the audience Closing Remarks Closing Remarks

3 Introduction The public comment period for the draft NPDES permit is open until May 11, The public comment period for the draft NPDES permit is open until May 11, Written comments addressing the draft permit will be accepted up to May 11, Written comments addressing the draft permit will be accepted up to May 11, All written comments will be considered by IDEM in the preparation of the final permit. All written comments will be considered by IDEM in the preparation of the final permit. All written comments will receive a response from IDEM. All written comments will receive a response from IDEM.

4 Introduction The B P Products NPDES permit/Fact Sheet are available on the internet at: ter/public_notice/index.html. The B P Products NPDES permit/Fact Sheet are available on the internet at: ter/public_notice/index.html. Please write out all questions and comments that you wish to have addressed at this Public Meeting on the form provided. Please write out all questions and comments that you wish to have addressed at this Public Meeting on the form provided. Questions will be addressed following this presentation. Questions will be addressed following this presentation.

5 Facility Description BP Products North America Inc. owns and operates a petroleum refinery located on approximately 1,700 acres in Whiting, East Chicago and Hammond, Indiana near the southern tip of Lake Michigan. The refinery employs approximately 1,500 people and produces a variety of products including gasoline of all grades, diesel fuel, heating fuel, jet fuel, asphalt and coke. The refinery can process up to 420,000 barrels of crude oil per day. BP Products North America Inc. owns and operates a petroleum refinery located on approximately 1,700 acres in Whiting, East Chicago and Hammond, Indiana near the southern tip of Lake Michigan. The refinery employs approximately 1,500 people and produces a variety of products including gasoline of all grades, diesel fuel, heating fuel, jet fuel, asphalt and coke. The refinery can process up to 420,000 barrels of crude oil per day.

6 Receiving Waters Lake Michigan – Lake Michigan is the receiving water for Outfalls 001 and 002. (Outfall 001 will be renumbered as Outfall 005 with commencement of discharge through effluent diffuser). Lake Michigan – Lake Michigan is the receiving water for Outfalls 001 and 002. (Outfall 001 will be renumbered as Outfall 005 with commencement of discharge through effluent diffuser). Lake George Branch of the Indiana Harbor Ship Canal – The Lake George Branch of the Indiana Harbor Ship Canal is the receiving water for Outfalls 003 and 004 Lake George Branch of the Indiana Harbor Ship Canal – The Lake George Branch of the Indiana Harbor Ship Canal is the receiving water for Outfalls 003 and 004

7 Lake Michigan Lake Michigan is designated as an outstanding state resource water, Lake Michigan is also designated for full-body contact recreation and capable of supporting a well-balanced warm water aquatic community. The Indiana portion of the open waters of Lake Michigan is designated as salmonid waters and shall be capable of supporting a salmonid fishery. Lake Michigan is designated as an outstanding state resource water, Lake Michigan is also designated for full-body contact recreation and capable of supporting a well-balanced warm water aquatic community. The Indiana portion of the open waters of Lake Michigan is designated as salmonid waters and shall be capable of supporting a salmonid fishery.

8 Lake George Branch of the IHSC The Lake George Branch of the Indiana Harbor Ship Canal is classified as a high quality water that is a tributary to an OSRW (Lake Michigan) and is also designated for full-body contact recreation and capable of supporting a well-balanced warm water aquatic community. The Lake George Branch of the Indiana Harbor Ship Canal is classified as a high quality water that is a tributary to an OSRW (Lake Michigan) and is also designated for full-body contact recreation and capable of supporting a well-balanced warm water aquatic community.

9 Outfall 001 BP Whiting discharges a maximum monthly average of 21.4 million gallons per day of treated wastewater from water used in the refinery, recovered ground water and most of the storm water from the site through their wastewater treatment plant to Outfall 001. BP Whiting discharges a maximum monthly average of 21.4 million gallons per day of treated wastewater from water used in the refinery, recovered ground water and most of the storm water from the site through their wastewater treatment plant to Outfall 001.

10 Outfall 001 cont. BP also accepts and treats wastewater at the wastewater treatment plant from NiSource Whiting Clean Energy (approx. 1.2 MGD) and Ineos PIB Unit (formerly BP Chemical Plant) (approx MGD). BP also accepts and treats wastewater at the wastewater treatment plant from NiSource Whiting Clean Energy (approx. 1.2 MGD) and Ineos PIB Unit (formerly BP Chemical Plant) (approx MGD).

11 Whiting Clean Energy Whiting Clean Energy supplies BP with steam. The closed cycle cooling towers operated by Whiting Clean Energy have a blowdown which is sent to the BP wastewater treatment plant (WWTP). Whiting Clean Energy supplies BP with steam. The closed cycle cooling towers operated by Whiting Clean Energy have a blowdown which is sent to the BP wastewater treatment plant (WWTP).

12 Ineos The Ineos facility sends wastewater from a polybutene manufacturing/processing unit (PIB unit) to the BP wastewater treatment plant. The PIB unit has sent their wastewater to the BP WWTP for many years. The Ineos facility sends wastewater from a polybutene manufacturing/processing unit (PIB unit) to the BP wastewater treatment plant. The PIB unit has sent their wastewater to the BP WWTP for many years.

13 Alternate Mixing Zone IDEM is proposing to allow a discharge induced mixing zone through a diffuser in Lake Michigan which produces a mixing volume of lake water that is 37.1 times greater than the discharge volume of 21.4 million gallons per day from Outfall 001. IDEM is proposing to allow a discharge induced mixing zone through a diffuser in Lake Michigan which produces a mixing volume of lake water that is 37.1 times greater than the discharge volume of 21.4 million gallons per day from Outfall 001. The alternate mixing zone will encompass a 182 feet radius from the diffuser. The alternate mixing zone will encompass a 182 feet radius from the diffuser.

14 Alternate Mixing Zone cont. Diffuser design basics: Diffuser design basics: –330 feet long. –12 ports facing upward. –Port diameter is 6 inches. –Ports spaced 30 feet apart. –Distance from shore is 3,500 feet. –Lake depth at diffuser is 28.5 feet.

15 Alternate Mixing Zone cont. In accordance with 327 IAC (b)(4), the mixing zone shall not: In accordance with 327 IAC (b)(4), the mixing zone shall not: Interfere with or block passage of fish or aquatic life Interfere with or block passage of fish or aquatic life jeopardize the continued existence of an endangered or threatened species or result in the destruction or adverse modification of such species’ habitats jeopardize the continued existence of an endangered or threatened species or result in the destruction or adverse modification of such species’ habitats extend to drinking water intakes extend to drinking water intakes impair or otherwise interfere with the designated uses of the receiving water impair or otherwise interfere with the designated uses of the receiving water

16 Alternate Mixing Zone cont. promote undesirable aquatic life or result in a dominance of nuisance species promote undesirable aquatic life or result in a dominance of nuisance species allow substances to settle to form objectionable deposits allow substances to settle to form objectionable deposits allow floating debris, oil, scum, and other matter in concentrations that form nuisances allow floating debris, oil, scum, and other matter in concentrations that form nuisances allow objectionable color, odor, taste or turbidity, or allow objectionable color, odor, taste or turbidity, or cause adverse effects to human health, aquatic life or wildlife. cause adverse effects to human health, aquatic life or wildlife.

17 Alternate Mixing Zone cont. The following concerns were raised about the alternate mixing zone by IDEM’s Assessment Branch: The following concerns were raised about the alternate mixing zone by IDEM’s Assessment Branch: –Toxicity of the Effluent –The support structure of the diffuser becoming an attraction to aquatic life –Maintenance of the Diffuser –Biological monitoring to ensure efficient diffuser operation.

18 Alternate Mixing Zone cont. Compliance with effluent limitations and Whole Effluent Toxicity testing requirements will ensure that the discharge after mixing does not demonstrate toxicity to aquatic life. Compliance with effluent limitations and Whole Effluent Toxicity testing requirements will ensure that the discharge after mixing does not demonstrate toxicity to aquatic life. Approval of the design of the support structure is under the jurisdiction of the IDNR Division of Water, US Army Corps of Engineers (Detroit District), and IDEM’s Water Quality Certification Program. Approval of the design of the support structure is under the jurisdiction of the IDNR Division of Water, US Army Corps of Engineers (Detroit District), and IDEM’s Water Quality Certification Program. Part II.B.1 of the permit requires the permittee to maintain in good working order and efficiently operate all facilities and systems including the diffuser. Part II.B.1 of the permit requires the permittee to maintain in good working order and efficiently operate all facilities and systems including the diffuser.

19 Alternate Mixing Zone cont. –Efficient diffuser operation will be ensured by proper operation and maintenance requirements under Part II.B.1. –There will be a written maintenance procedure developed by BP addressing proper operation and maintenance of diffuser. –Proper operation and maintenance will be verified through periodic inspections by BP Products and IDEM.

20 Alternate Mixing Zone cont. IDEM has evaluated all available information relevant to the consideration of harm to human health, aquatic life, or wildlife, and has determined that the alternate mixing zone will not cause any of the adverse impacts identified in 327 IAC (b)(4). IDEM has evaluated all available information relevant to the consideration of harm to human health, aquatic life, or wildlife, and has determined that the alternate mixing zone will not cause any of the adverse impacts identified in 327 IAC (b)(4). Implementation of an alternate mixing zone significantly reduces the potential for BP's discharge to adversely affect aquatic life, because the magnitude and duration of exposure will be reduced as a result of more rapid and immediate mixing. Implementation of an alternate mixing zone significantly reduces the potential for BP's discharge to adversely affect aquatic life, because the magnitude and duration of exposure will be reduced as a result of more rapid and immediate mixing.

21 Outfall 002 In the past, BP Whiting has discharged a maximum monthly average of million gallons per day (11-99 through data) of non-contact cooling water to Lake Michigan through Outfall 002. In the past, BP Whiting has discharged a maximum monthly average of million gallons per day (11-99 through data) of non-contact cooling water to Lake Michigan through Outfall 002. Outfall 002 currently has a maximum monthly average discharge of 96.4 MGD of non contact cooling water (7-02 through data). Outfall 002 currently has a maximum monthly average discharge of 96.4 MGD of non contact cooling water (7-02 through data). After the refinery has been configured to process CXHO, the maximum monthly average discharge from Outfall 002 will be 81.8 MGD. After the refinery has been configured to process CXHO, the maximum monthly average discharge from Outfall 002 will be 81.8 MGD.

22 Outfalls 003 and 004 BP Whiting discharges storm water to Outfalls 003 and 004 using a manually controlled valve. BP Whiting discharges storm water to Outfalls 003 and 004 using a manually controlled valve. The storm water is managed through the use of a Spill Prevention, Control and Countermeasure Plan, a Facility Response Plan, and Agreed Order No. H which defined eight interim measures to be implemented at the J & L site in which Outfalls 003 and 004 are located. The storm water is managed through the use of a Spill Prevention, Control and Countermeasure Plan, a Facility Response Plan, and Agreed Order No. H which defined eight interim measures to be implemented at the J & L site in which Outfalls 003 and 004 are located.

23 Effluent Limitations for 001 The permit places effluent limitations on the following pollutant parameters: BOD, TSS, COD, Benzo-A-pyrene, Chloride, Copper, Total Dissolved Solids, Fluoride, Lead, Oil and Grease, Phenolics, Ammonia, Strontium, Selenium, Sulfate, Sulfide, T. Chrome, H. Chrome, Mercury, Vanadium, pH, Phosphorus and Whole Effluent Toxicity The permit places effluent limitations on the following pollutant parameters: BOD, TSS, COD, Benzo-A-pyrene, Chloride, Copper, Total Dissolved Solids, Fluoride, Lead, Oil and Grease, Phenolics, Ammonia, Strontium, Selenium, Sulfate, Sulfide, T. Chrome, H. Chrome, Mercury, Vanadium, pH, Phosphorus and Whole Effluent Toxicity

24 Effluent Limitations Rationale for Outfall 001 BP is allowed up to three years to either install and operate the diffuser or meet the final effluent limitations that are based on Indiana Water Quality Criteria calculated into effluent limitations without the benefit of the mixing zone. BP is allowed up to three years to either install and operate the diffuser or meet the final effluent limitations that are based on Indiana Water Quality Criteria calculated into effluent limitations without the benefit of the mixing zone. Limits from the existing permit are carried forward at the same levels and will remain applicable as interim limits during the compliance period, until the diffuser is operational. Limits from the existing permit are carried forward at the same levels and will remain applicable as interim limits during the compliance period, until the diffuser is operational.

25 Effluent Limitations Rationale for Outfall 005 When the diffuser becomes operational, Outfall 001 will become Outfall 005 for data tracking purposes. The actual monitoring point will remain the same. When the diffuser becomes operational, Outfall 001 will become Outfall 005 for data tracking purposes. The actual monitoring point will remain the same. The effluent limitations for BOD, COD, oil and grease, phenolics, Sulfide, T. Chrome, H. Chrome and pH will be identical to the effluent limitations contained in the existing permit. The effluent limitations for BOD, COD, oil and grease, phenolics, Sulfide, T. Chrome, H. Chrome and pH will be identical to the effluent limitations contained in the existing permit. Phosphorus is limited to a daily maximum concentration of 1 mg/l. Phosphorus is limited to a daily maximum concentration of 1 mg/l.

26 Effluent Limitations Rationale for Outfall 005 cont. The effluent limitations for Fecal Coliform and Total Residual Chlorine have been removed from the permit because the sanitary wastewater is now being sent to the City of Whiting for treatment. The effluent limitations for Fecal Coliform and Total Residual Chlorine have been removed from the permit because the sanitary wastewater is now being sent to the City of Whiting for treatment. BP is required to monitor the effluent from Outfall 001 for Acute and Chronic Toxicity until the diffuser is operational and then BP will be required to monitor the effluent from Outfall 005 for chronic toxicity only. BP is required to monitor the effluent from Outfall 001 for Acute and Chronic Toxicity until the diffuser is operational and then BP will be required to monitor the effluent from Outfall 005 for chronic toxicity only. If toxicity is demonstrated, a Toxicity Reduction Evaluation is required. If toxicity is demonstrated, a Toxicity Reduction Evaluation is required.

27 Effluent Limitations Rationale for Outfall 005 cont. BP will be allowed up to five years to achieve compliance with the new final limitations for Vanadium and Mercury. BP will be allowed up to five years to achieve compliance with the new final limitations for Vanadium and Mercury. IDEM anticipates BP will apply for a Streamlined Mercury Variance which will require BP to implement a pollutant minimization program to reduce Mercury in their discharge. IDEM anticipates BP will apply for a Streamlined Mercury Variance which will require BP to implement a pollutant minimization program to reduce Mercury in their discharge. IDEM anticipates BP will develop additional toxicological data for Vanadium which will be used to revise the water quality criterion for aquatic life. IDEM anticipates BP will develop additional toxicological data for Vanadium which will be used to revise the water quality criterion for aquatic life.

28 Effluent Limitations Rationale for Outfall 005 cont. The effluent limitations for ammonia as N and Total Suspended Solids (TSS) are being increased due to the increased loading of these pollutants to the WWTP resulting from refining the Canadian Extra Heavy Crude (CXHO) and increasing the coking capacity. BP submitted an Antidegradation Demonstration to IDEM to justify these increased permit limitations. The effluent limitations for ammonia as N and Total Suspended Solids (TSS) are being increased due to the increased loading of these pollutants to the WWTP resulting from refining the Canadian Extra Heavy Crude (CXHO) and increasing the coking capacity. BP submitted an Antidegradation Demonstration to IDEM to justify these increased permit limitations.

29 Antidegradation Rule for OSRWs Discharge flow volume will not increase as a result of CHXO refining proposed by BP Products. Discharge flow volume will not increase as a result of CHXO refining proposed by BP Products. 327 IAC (a)(1)(B)(iv) allows the Commissioner of IDEM to calculate increased effluent limitations on a case-by case basis when the proposed increase in mass is not a result of an increase in discharge flow. 327 IAC (a)(1)(B)(iv) allows the Commissioner of IDEM to calculate increased effluent limitations on a case-by case basis when the proposed increase in mass is not a result of an increase in discharge flow.

30 Antidegradation Implementation IDEM required BP to submit an antidegradation demonstration which shows the increase is necessary, that the activity responsible for the increase accommodates important social or economic benefits to the area where the discharge occurs and that it is limited to the minimum necessary to allow the activity to occur. IDEM required BP to submit an antidegradation demonstration which shows the increase is necessary, that the activity responsible for the increase accommodates important social or economic benefits to the area where the discharge occurs and that it is limited to the minimum necessary to allow the activity to occur.

31 Antidegradation Demonstration BP will implement the following projects as part of the CXHO Project to minimize TSS and ammonia in the effluent: BP will implement the following projects as part of the CXHO Project to minimize TSS and ammonia in the effluent: Desalter Brine Treatment to remove emulsified solids from the brine wastewater prior to entering the process sewer. Desalter Brine Treatment to remove emulsified solids from the brine wastewater prior to entering the process sewer. Expansion of the sour water stripping system for handling the increased ammonia loading from the processing of Canadian crudes. Expansion of the sour water stripping system for handling the increased ammonia loading from the processing of Canadian crudes.

32 Antidegradation Demonstration cont. Installation of an additional 10 million gallon equalization/storm water tank to allow more consistent feed to the WWTP. Installation of an additional 10 million gallon equalization/storm water tank to allow more consistent feed to the WWTP. Upgrading the final filters at the WWTP to improve hydraulics and reliability. Upgrading the final filters at the WWTP to improve hydraulics and reliability. Implementing flow reduction projects to maintain the WWTP discharge at current level of 21.4 MGD. Implementing flow reduction projects to maintain the WWTP discharge at current level of 21.4 MGD.

33 Antidegradation for Ammonia Ammonia effluent limitations Ammonia effluent limitations Monthly Average Daily Maximum Monthly Average Daily Maximum Existing 1,030 lbs/day 2,060 lbs/day Existing 1,030 lbs/day 2,060 lbs/day Proposed 1,584 lbs/day 3,572 lbs/day Proposed 1,584 lbs/day 3,572 lbs/day Fed ELGs 3,358 lbs/day 7,387 lbs/day Fed ELGs 3,358 lbs/day 7,387 lbs/day WQBELs 3,215 lbs/day 7,501 lbs/day WQBELs 3,215 lbs/day 7,501 lbs/day

34 Antidegradation Demonstration for Ammonia Demonstrated ammonia removal efficiency = 70% Existing loading of ammonia to the WWTP = 1,668 lbs/day Existing loading of ammonia to the WWTP = 1,668 lbs/day Estimated loading of ammonia to the WWTP using CXHO = 3,822 lbs/day Estimated loading of ammonia to the WWTP using CXHO = 3,822 lbs/day 0.3 x 3,822 lbs/day = 1,147 lbs/day 0.3 x 3,822 lbs/day = 1,147 lbs/day Monthly average limit based on 95% probability of achieving compliance with 1,147 lbs/day = 1,584 lbs/day using EPA guidance. Monthly average limit based on 95% probability of achieving compliance with 1,147 lbs/day = 1,584 lbs/day using EPA guidance.

35 Antidegradation for TSS TSS effluent limitations TSS effluent limitations Monthly Average Daily Maximum Monthly Average Daily Maximum Existing 3,646 lbs/day 5,694 lbs/day Existing 3,646 lbs/day 5,694 lbs/day Proposed 4,925 lbs/day 7,723 lbs/day Proposed 4,925 lbs/day 7,723 lbs/day Fed ELGs 4,925 lbs/day 7,723 lbs/day Fed ELGs 4,925 lbs/day 7,723 lbs/day WQBELs TSS does not have numeric water quality criteria. WQBELs TSS does not have numeric water quality criteria.

36 Antidegradation Demonstration for TSS TSS influent loading to WWTP has the potential to increase by as much as 654% based on data from another refinery which has processed the CXHO (Toledo, OH). TSS influent loading to WWTP has the potential to increase by as much as 654% based on data from another refinery which has processed the CXHO (Toledo, OH). Proposed increase from the existing monthly average limit of 3,646 lbs/day to 4,925 lbs/day is a 35% increase. Proposed increase from the existing monthly average limit of 3,646 lbs/day to 4,925 lbs/day is a 35% increase. Increase reflects the increase in the coking operations. Increase reflects the increase in the coking operations.

37 Antidegradation Demonstration This project will: This project will: Increase the diversity and security of oil supplies to the Midwestern United States Increase the diversity and security of oil supplies to the Midwestern United States Allow the Whiting Refinery to continue to operate as a viable business and significant employer of northwest Indiana Allow the Whiting Refinery to continue to operate as a viable business and significant employer of northwest Indiana Contribute to the tax bases of the cities of East Chicago, Whiting and Hammond Contribute to the tax bases of the cities of East Chicago, Whiting and Hammond Create 70 to 80 new full time positions in the refinery and will also result in thousands of temporary construction jobs Create 70 to 80 new full time positions in the refinery and will also result in thousands of temporary construction jobs

38 Proposed BP Permit Limits Monthly Average TBL WQBEL Current Draft lbs/day lbs/day lbs/day lbs/day BOD6,156 N/A 4,1614,161 COD42,980 N/A 30,32330,323 O&G1,791 N/A 1,3681,368 Phenolics32.8 N/A Sulfide32.5 N/A Total Chromium Hex Chrom TSS4,925 N/A 3,6464,925 Ammonia3,358 3,215 1,0301,584

39 Effluent Limitations Rationale for Outfall 002 The effluent limitations for Total Organic Carbon (TOC), Total Residual Chlorine, pH and Temperature are identical to the limits in the existing permit. The effluent limitations for Total Organic Carbon (TOC), Total Residual Chlorine, pH and Temperature are identical to the limits in the existing permit. Oil and Grease has the same daily maximum effluent limitation of 5 mg/l, but it is no longer a net limitation (BP no longer receives credit for amounts of oil and grease in the influent, making the proposed limit more stringent). Oil and Grease has the same daily maximum effluent limitation of 5 mg/l, but it is no longer a net limitation (BP no longer receives credit for amounts of oil and grease in the influent, making the proposed limit more stringent).

40 Effluent Limitations Rationale for Outfalls 003 and 004 The effluent limitations for Oil and Grease, TOC and pH are identical to the limitations in the existing permit. The effluent limitations for Oil and Grease, TOC and pH are identical to the limitations in the existing permit. BP must develop a Storm Water Pollution Prevention Program within eighteen (18) months from the permits effective date. BP must develop a Storm Water Pollution Prevention Program within eighteen (18) months from the permits effective date.

41 Submit your Questions & Comments Please complete the forms provided to submit your questions and comments. Please complete the forms provided to submit your questions and comments. When completed, submit the forms to a member of IDEM. When completed, submit the forms to a member of IDEM. Questions will be addressed this evening, if possible. Questions will be addressed this evening, if possible. Comments will be considered in the final permit decision. Comments will be considered in the final permit decision.

42 Questions? & Comments IDEM will now answer questions about the Draft NPDES Permit IDEM will now answer questions about the Draft NPDES Permit Comments that you want IDEM to consider in the final permit decision should be submitted in writing to: Comments that you want IDEM to consider in the final permit decision should be submitted in writing to: IDEM - Office of Water Quality Industrial NPDES Permits Section Attention: Mr. Bill Stenner or Mr. Steve Roush MC IGCN Room North Senate Avenue Indianapolis, IN