ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.

Slides:



Advertisements
Similar presentations
EO TP3 SAMPLING WASTE DISPOSAL SYSTEMS.
Advertisements

COLLECTION SYSTEM TREATMENT WITH BIO-ORGANIC CATALYST.
Operator Observations
Home Work Each day 3780 m3 of wastewater is treated at a municipal wastewater treatment plant. The influent contains 220 mg/L of suspended solids. The.
LOCAL IPP REGULATIONS SEWER USE ORDINANCES Sandra Diorka Director of Public Services Delhi Charter Township.
Biological Treatment Processes
CE 370 Sedimentation.
Sewage and Effluent Treatment 2-4 November 2002 Seán Moran -The first few slides.
CLARIFIERS Prepared By Michigan Department of Environmental Quality
Treatment of Slaughterhouse Wastewater
Air Stripping (Section 9 – 1)
Biological waste water treatment
Waste Water Treatment (Sewage Treatment)
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
ENVIRONMENTAL BIOTECHNOLOGY TREATMENT OF WASTEWATER
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
1 CE 548 Analysis and Selection of Wastewater Flowrates and Constituent Loading.
WASTEWATER ENGINEERING
Wastewater Treatment and Permit Compliance  Document Permit issue and expiration date  Document permit requirements  If discharge to city, review.
ENVE 420 Industrial Pollution Control NEUTRALIZATION Dr. Aslıhan Kerç.
On-Site Leachate Management RM of Tache Pilot Study.
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
29 August 2013 AMD Debate Technical solutions and funding models for the Acid Mine Drainage problems of South Africa.
ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY CH 8 - Suspended Growth Biological Treatment Process Prepared by: Pn. Hairul Nazirah Abdul Halim.
ENVE 420 Industrial Pollution Control Wastewater Sources in an Industry Dr. Aslıhan Kerç.
LIPPO CIKARANG Wasted Water Treatment Plant
ENVIRONMENTAL BIOTECHNOLOGY TREATMENT OF WASTEWATER
Wastewater Treatment. Collection Sewers Collect wastewater and bring it to the wastewater treatment plant – Combined sewer overflows: Take untreated sewage.
1 IV. Wastewater Treatment technologies Topic IV. 9. Wastewater Treatment Facilities with Suspended Biomass - Aerated Tanks: Kinds, Structures, Basic Technological.
Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.
ENVE 420 Industrial Pollution Control
Wastewater Treatment Processes
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
Materials Balances with Multiple Materials Only one equation can be written for each black box unless there is more than one material in the flow Example.
ERT 417/4 WASTE TREATMENT IN BIOPROCESS INDUSTRY SEM 1 (2010/2011) ‘Physical Treatment Processes of Industrial Waste’ (Part A) By; Mrs Hafiza Binti Shukor.
Depuration plant of processing water outcoming from production activity of Cantina Sociale di Massenzatico (RE). The cooperative winery receives grapes.
ENVE 420 Industrial Pollution Control Sources and Characteristics of Wastewaters Industrial Waste Survey Dr. Aslıhan Kerç.
ENVE 420 Industrial Pollution Control Wastewater Treatment Processes Dr. Aslıhan Kerç.
ENVE 420 Industrial Pollution Control INTRODUCTION Dr. Aslıhan Kerç.
1 IV. Wastewater Treatment Technologies Topic IV. 10. Wastewater Treatment Facilities with Attached Biomass - Trickling Filters: Kinds, Structures, Basic.
Hybrid bio-chemical approach for treatment of Industrial Wastewater
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
CEE 426 October :05 PM UW Madison Room 1209 Engineering Hall
ENVE 201 Environmental Engineering Chemistry 1 Sampling – Sampling Types Dr. Aslıhan Kerç.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
Course TEN-702 Industrial waste management unit-2 Lecture -10.
Prepared by: Pn. Hairul Nazirah Abdul Halim
Engineered systems for wastewater treatment and disposal.
Membrane Bioreactors for Wastewater Treatment.
WATER MANAGEMENT.
 Overview: Wastewater Engineering  Wastewater Characteristics  Wastewater Treatment Considerations  Overview: Wastewater Treatment Plant Design.
Welcome to the Key Largo Wastewater Treatment Plant.
Welcome to American-Bath Wastewater Treatment Plant.
Conventional Sewage Treatment Plants:
Modified Ludzack-Ettinger Wastewater Plant
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment.
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
Maintenance of the On-Lot Sewage System
Wastewater Treatment Dr.Gulve R.M..
‘Physical Treatment Processes of Industrial Waste’ (Part A)
Environmental Engineering
ENVE422: Wastewater Treatment Process Design
Wastewater Treatment Secondary Treatment.
Environmental Engineering
Wastewater Treatment: Characteristics and Systems
Presentation transcript:

ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç

Objective of Using Equalization Basins Minimize or control fluctuations in wastewater characteristics and flowrate. Size and type of equalization basin varies with: - Quantity of waste - Variability of the wastewater stream

Purpose of using equalization for industrial treatment facilities Dampening of organic fluctuations  prevent shock loading of biological systems pH control  Minimize chemical requirements for neutralization Minimize flow surges to physical – chemical treatment. Permit chemical feed rates compatible with feeding equipment

Purpose of using equalization for industrial treatment facilities Provide continuous feed to biological system (even when the factory is not operating) Controlled discharge of wastes to municipal system. Distribute waste loads evenly. Prevent high concentrations of toxic materials from entering the biological treatment plant.

Mixing Requirements for Equaliztaion Tanks Mixing is required for: - Adequate equalization - Prevent settlement of solids - Oxidation of reducing compounds - Reduction of BOD by air stripping (limited)

Mixing Methods 1.Distribution of inlet flow and baffling 2.Turbine Mixing 3.Diffused air aeration 4.Mechanical aeration

Mixing Methods Most common method  Submerged mixers For readily biodegradable wastes use surface aerators  – kW /m 3 Air requirement for diffused air aeration: 3.5 – 4.0 m 3 air / m 3 waste

Variable volume in the equalization tank  provide a constant effluent flow Program effluent pumping rate  Discharge maximum quantity of waste during periods of low flow Organic loading of treatment plant is maintained constant for 24-h.

Equalization basin equalize - Flow or - Concentration or - Both

Flow equalization Plot cumulative flow versus time Determine maximum volume with respect to constant discharge line

Concentration Equalization Equalization basin may be sized to restrict the dischatge to a maximum concentration

Equalization volume Volume of completely mixed basins used in treatment can be considered as part of equalization basin (e.g. Activated sludge) Example: Total time required for equalization: 16h Aeration basin: ? 8h Required equalization: 8 h

Patterson and Menez Method Used to calculate equalization volume when both the flow and the strength vary randomly Based on material balance C i QT + C o V = C 2 QT + C 2 V

Construction details for equalization basins 1.Influent should be given to the equalization basin close to the mixing device to prevent short circuiting 2.Cleaning system for grease and scum which can accumulate on the walls should be considered 3.An overflow weir should be installed to discharge wastewater in case of failure of pumps 4.Spray nozzles should be installed to break the foams

Factors effecting need for equalization 1. Cost of construction and implementing effective equalization 2. Cost saving by reducing the effects on downstream treatment systems

Flow Equalization Processes 1.ALTERNATING FLOW: Collects total flow of the effluent for a given period of time (normally 24 hours) while a second basin is discharging. Alternative between filling-discharging. High degree of equalization by leveling all discharge parameters. Disadvantage  high construction cost

Flow Equalization Processes 2. INTERMITTENT FLOW DIVERSION: Allows any significant variance in stream parameters to be diverted to an equalization basin for short durations. Diverted flow is then bled back into the stream at a controlled rate. Rate at which the diverted flow is fed back into main stream depends on: - volume - variance of the diverted water  to reduce downstream effect

Flow Equalization Processes 3. COMPLETELY MIXED COMBINED FLOW: Complete mixing of multiple flows combined at the front end of the facility. Reduce variance in each stream by thorough mixing with other flows.

Flow Equalization Processes 4. COMPLETELY FIXED FLOW: A large completely mixed holding basin before wastewater treatment facility. Levels variations of influent stream parameters and provides a constant discharge.