Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM.

Slides:



Advertisements
Similar presentations
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Advertisements

U N C L A S S I F I E D Changes to EPA Radiological Stack Monitoring Requirements, and Ramifications on LANL Operations David Fuehne, CHP March 22, 2005.
PUBLIC DOSES ESTIMATION BASED ON EFFLUENTS DATA AND DIRECT MEASUREMENTS OF TRITIUM IN ENVIRONMENTAL SAMPLES AT CERNAVODA E. Bobric, I. Popescu, V. Simionov.
Environmental Management System (EMS)
World Health Organization
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Perspectives on USNRC Study Request Nuclear & Radiation Studies Board April 26, 2010 Ralph Andersen, CHP Senior Director – Radiation Safety & Environmental.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
REMP Ramblings 2006 RETS/REMP Workshop Jim Key Key Solutions, Inc.
The State of the ODCM 2004 RETS/REMP Workshop Jim Key Key Solutions, Inc.
Addressing Uncertainty in Radiochemistry Measurements M. C. Nichols, CHP RETS-REMP meeting.
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
History of waste disposal. 2 J.H. Saling and A.W. Fentiman, “Radioactive Waste Management,” Second Edition, (Taylor & Francis, NY  London) 2002.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Qualification of HVAC systems
Ozone and Ozone Monitoring 2015 National Tribal Forum Glenn Gehring, Technology Specialist III Tribal Air Monitoring Support (TAMS) Center Institute for.
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
Air Emission Control Technology UWM Air Pollution Meteorology Class November 20, 2007 Frances A. Hardrick We Energies.
Use of Portable HEPA Filtered Ventilation Units. HEPA Filtered Ventilation Used to “capture” airborne particulate and confine its spread Used to “capture”
Russian Soot Measurement Methodologies Alexander Romanov Scientific Research Institute for atmospheric air protection St.Petersburg, Russian Federation.
1 Key Monitoring Issues Status of PM 2.5 monitoring methodologies Criteria for acceptance of monitors and sites Special considerations for comparing ambient.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
1 CE Air Pollution Measurements, Emission Estimates Jeff Kuo, Ph.D., P.E.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Sampling and Measurement for Respirable Particulates.
Ronald Warren Ecological & Environmental Monitoring National Security Technologies, LLC Community Environmental Monitoring Program Workshop July 26, 2011.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Overview of the Work Zone Safety and Mobility Rule Module 1.
| Philadelphia | Atlanta | Houston | Washington DC SO 2 Data Requirements Rule – A Proactive Compliance Approach Mark Wenclawiak, CCM |
U.S Regulatory Process for Uranium Production Facility Licensing and Operation Daniel M. Gillen.
The Radionuclides Rule Analytical Issues and Considerations John Griggs U.S. EPA Office of Radiation and Indoor Air National Air and Radiation Environmental.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Title V Operating Permits: A Compliance and Enforcement Tool Candace Carraway US Environmental Protection Agency Office of Air Quality Planning and Standards.
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Regulatory Framework for Uranium Production Facilities in the U.S.
Proposed Revisions to the Guideline on Air Quality Models
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Conceptual Site Models Purpose, Development, Content and Application CP Annual Training October 27, 2015.
-1- UNRESTRICTED / ILLIMITÉ Demonstrating the Safety of Long-Term Waste Management Facilities Dave Garrick 2015 September.
Emission source sampling and monitoring Topic 6 Ms Sherina Kamal May
IAEA International Atomic Energy Agency Technical Meeting on the Demonstration of Operational and Long Term Safety of Predisposal Management Facilities.
1 Special Information Session on USEPA’s Carbon Rules & Clean Air Act Section 111 North Carolina Division of Air Quality Special Information Session on.
Prof. Jiakuan Yang Huazhong University of Science and Technology Air Pollution Control Engineering.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Enrico Da Riva (EN/CV/PJ)
Ambient Air Sampling for ARP Compliance with the NESHAP, Subpart H Paul Ritter State of Idaho – DEQ Oversight Program November 17, 2011.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
Regulatory background How these standards could impact the permitting process How is compliance with the standards assessed.
EPRI Comments Re: NRC “Low-Level Radioactive Waste Disposal”
Integrating Modeling and Physical Testing for Assessing Filtered Exhaust Stack Sampling Probe Location Xiao-Ying Yu, Kurtis P. Recknagle, John A. Glissmeyer,
Update on EPA Regulatory and Guidance Activities
SME Associates LLC Providing Innovative Solutions
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs
Presented by Harry C. Elinsky, Jr. Filtech, Inc.
EPA Method Equivalency
Session 4: Air Pollution Measurements
NRC’s LLW Regulatory Program: Update of Emerging Issues
Advance Notice of Proposed Rulemaking 10 CFR Part 20
Representative Measurements – AQ-Workshop Bucharest, July 2008
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs
Research and Test Reactor Decommissioning Inspections
TRTR Briefing September 2013
Optimisation in Operational Radiological Protection
EPA/OAQPS Pollutant Emissions Measurement Update 2019
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM

Contents Concepts of Monitoring Guidelines of Monitoring Status of Monitoring

I. Concepts of Monitoring MONITORING WHAT WHEN WHY HOW WHERE

Monitoring What All radioactive effluents to the environment Two broad source types at NPPs Point source : stacks and ducts Nonpoint source : all other sources Focus on aerosol effluents from point source

Monitoring Why For evaluation the environmental impact the potential annual radiation doses to the public adequacy and performance of containment, waste treatment methods, and effluent controls To ascertain regulatory requirements and LCO have been met concentrations have been kept ALARA

Monitoring When Continuously or periodically At all conditions of reactor operation Normal Off-normal Anticipated operational occurrences Post-accident Off-normal case should consider leakage of particles through filter media, filter seals, and cracks in filter frames

Monitoring Where (1) All major and potentially significant paths In 40 CFR Part (4)(i) : continuous monitor at release points that have the potential effective dose equivalent (EDE) ≥ 0.1 mrem/yr NUREG-0800, SRP 11.5, table 1 lists all paths

Monitoring Where (2) NUREG Table 1

Monitoring How Combination of direct measurement, sample extraction, and analysis Sample extraction is performed with sampling system Sampling system is very useful, but there are a lot of complexities for getting representative samples

Sampling System Generic Sampling System (from ANSI N )

Continuous Air Monitor P&ID of a CAM Sampler

II. Guidelines of Monitoring ANSI N ANSI N NRC : SRP 11.5 ver.3 - ANSI N13.1(1969) 1989 NRC : petition for regulation duplicate 1997 KINS : SRP 11.5 ver.0 - ANSI N13.1(1969) 2000 DOE : present DOE Position to EPA - No supporting complete retrofitting &replacement of all existing monitoring devices 2007 NRC : SRP 11.5 ver.4 - ANSI N13.1(1999) 1996 NRC : announce new Constraint Rule - transfer 0.1 mSv/yr to 10 CFR NRC : SRP11.5 Draft ver.4-ANSI N13.1(1993) 1990 DOE : follow Rad NESHAP-ANSI N13.1(1969) 1977 CAAA : EPA limit emission to air 1983 EPA : propose NESHAP – DOE &NRC 1987EPA:Case of VCD-reconsider NESHAP 1993, propose ANSI N X 1989 EPA:promulgate-40 CFR 61, Subpart I & H Decision-making : VCD & benzene policy No member of public exceeds 0.1 mSv/yr 1990 EPA: publish Rad NESHAP mSv/yr EPA(1993a) : ANSI N EPA(1993b) : “ 8-2 rule ” or “ duct diameter ” 1997 EPA : rescind - 40 CFR 61, Subpart I 2002 EPA : update - Rad NESHAP ANSI N use for new & modified Impose additional inspection on existing

Rad NESHAP (40 CFR 61, Subpart H) Rad NESHAP standard for public dose limit from 1 mSv/yr to 0.1 mSv /yr from all pathway to just only air pathway The technical requirements for determining dose to the public became more rigidly defined So, called out the ANSI N as in USEPA(1993a) In addition, sampling sites are required to be selected following procedures in USEPA(1993b)

Deficiency in USEPA(1993b) USEPA(1993b) require that sampling should be done at least diameters downstream from a disturbance and at least 2 diameters upstream flow disturbances Techniques is clear, but no criteria Assumption : the degree of flow development and mixing are directly related to the distance from disturbance This, unfortunately, is not necessarily true

Deficiency in USEPA(1993a) - 1 USEPA(1993a) assumes nothing about flow development and mixing and calls out ANSI recommendations for probe design However, other characteristics of the bulk effluent (i.e., the degree of flow development and particulate mixing) are also critical to determine the design requirements of the probe ANSI N13.1(1969) provides guidance for particulate sampling probes that utilize a multinozzle array to accomodate any deficiencies in the flow development or mixing

Deficiency in USEPA(1993a) – 2 This scheme has a significant drawback As additional nozzles are added, the loss of particles increase due to impaction in the small nozzle inlet and tube bends Depending upon the density of the particulates at a ratio 2.0, particulates are underestimated by 10 to 50% from ANSI N

ANSI N ANSI N compensate the deficiencies in USEPA(1993a) and USEPA(1993b) ANSI N is a performance-based standard rather than the prescriptive 1969 version To assure a representative sample is collected, the standard established required sampling system performance criteria

Performance Criteria (1) Total transport of 10 μm AD particles and vaporous contaminants shall be 〉50% from the free stream to the collector/analyzer Sampler nozzle inlet shall have a transmission ratio between 80% and 130% for 10 μm AD particles Sampler nozzle shall have an aspiration ratio that does not exceed 150% for 10 μm AD particles

Performance Criteria (2) Characteristics of a suitable sampling location are : coefficients of variation over the central 2/3 area of the cross section within ±20% for 10 μm AD particles, gaseous tracer, and gas velocity flow angle 〈 20° relative to the long axis of the stack and nozzle inlet the tracer gas concentration shall not vary from the mean 〉30% at any point on a 40 CFR 60, Appendix A, Method 1 velocity mapping grid

Performance Criteria (3) Effluent flowrate continuous measurement required if flow variation is 〉± 20% in a year Effluent and sample flow rate shall be measured within ±10% Continuous sample flowrate measurement and control required if flow varies 〉±20% during a sample interval flow control shall be within ±15%

III. Status of Monitoring 20 units under operation 6 units under construction All NPPs under operation use stacks (and ducts) sampling system with isokinetic multiple small- diameter nozzles Besides, the APR-1000 and APR-1400 have much more number of stacks and ducts

Design Differences Status of sampling system at 4 units has been surveyed during regular inspection in 2007 Considerable matters are listed : the ratio of effluent/sample flow rate ranges from to unbalance seems to exist among the components transport line seems too long, lots of bends information related sampling location, nozzle, and transport line for old system is absent no total procedures to maintain sampling system no method to inspect the inner sampling site

Data Comparability Uniform method can provide a uniform basis for data comparison from the different facilities Uniform method can be maintained with Periodic inspections of nozzle, transport lines, sample and effluent flowmeters shall be conducted Periodic calibrations of effluent and sample flowmeters, CAMs, and sample analysis instrumentation shall be conducted

Under Tasks New plants under construction in Korea are planning to use ANSI N The performance criteria of ANSI N have been studied to impose on the existing facilities