Presentation Texas Water: What You Should Know November 6, 2010.

Slides:



Advertisements
Similar presentations
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Advertisements

Texas State Water Planning Methodology Runnan Li Katie Born James Bronikowski.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
History of Water Reuse in Texas
Southwest Florida Water Management District Rule Development Workshop Water Use Permitting August 22, 2013.
Water Demands for Mining Richard Lowerre Adapted from presentation to Texas Groundwater Summit September 2013.
North Texas Municipal Water District’s Proposed Lower Bois d’Arc Creek Reservoir Presented by: Jim Parks.
Expedited Projects + Innovative Teamwork = Measurable Improvements to the Health of Lake Okeechobee and the St. Lucie and Caloosahatchee Estuaries.
1/40 Surface Water Hydrology at White River Lake, Texas Presented by Shane Walker May 3, 2005 CE 392K.2 – Hydrology.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
State Water Planning Methodology of Texas Michelle Buckholtz Rebecca Cesa Wyatt Ellertson.
How Much Do We Have Left? Coming to Terms With the Colorado River Water Availability Study Annual Colorado Water Workshop July 21, 2010 Ben Harding – AMEC.
ARIZONA DEPARTMENT OF WATER RESOURCES SURFACE WATER RIGHTS UNIT.
Leonard H. Dougal Jackson Walker L.L.P. (512) Upstream Development Water Needs: Supply and Permitting Considerations 24th Annual.
Environmental Flows Under Texas Senate Bill 3: Did We Leave Enough Water for the Fishes? Kirk Winemiller, Dept. of Wildlife and Fisheries Sciences, Texas.
SUSTAINABILITY TEAM | May 19, 2010 Illinois APA, September 24, 2010.
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
Taking Care of Your Water Rights: Permits, Extensions & Certificates Oregon Association of Water Utilities August 2013 Lisa Jaramillo Water Right Services.
Cost Allocation Studies for the MP Region Bureau of Reclamation April 29, 2008 Central Valley Project Cost Allocation Study Update Public Meeting #2: October.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Georgia’s Water Plan June 17, /09/08 Page 2 Agenda Plan Development Plan Overview.
TCEQ – Environmental Flows and Water Rights Permitting Bruce Moulton Policy & Regulations Texas Commission on Environmental Quality.
WATER AVAILABILITY MODELING for the SULPHUR RIVER BASIN Texas Natural Resource Conservation Commission Austin, Texas Consultant: R. J. Brandes Company.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Appropriation Policy Escalante River Drainage Kurt Vest Regional Engineer Division of Water Rights.
Eastern Snake River Plain Comprehensive Aquifer Management Plan (CAMP) Progress Report ESHMC January 13, 2009.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
City of Greeley Water & Sewer Department ● th Street, Suite 300 Greeley, CO ● (970) Making More Water Available.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
Environmental Regulations. Learning Objectives TLW understand the history of environmental regulations TLW be able to describe key content of environmental.
1 Floodplain Management SESSION 21 Policy History: Rivers as a Legal Battleground Public Policy in the American Federal System – An Overview Prepared by.
HISTORICAL OVERVIEW OF CONJUNCTIVE ADMINISTRATION OF ESPA WATER SOURCES PREPARED BY CLIVE J. STRONG FOR GOVERNOR’S WATER SUMMIT APRIL 17, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Evaporation in Texas CE 394K.2 Spring Evaporation In Texas  Evaporation is an important component of the hydrological cycle.  Globally volumes.
Lee County Water Resource Initiative: Community Sustainability Committee June 16, 2010 Kurt Harclerode Operations Manager Lee County Natural Resources.
Integrated Watershed Planning In Texas An Evolving Process National Waterways Conference Charleston, West Virginia September 25, 2009 Bill Mullican, P.G.,
March 21, 2006 Engrossed Second Substitute House Bill 2860 Columbia River Basin – Water Supply Keith Holliday Watershed Lead Washington State Dept. of.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
PROJECT PLAN: The Nature Conservancy Corps of Engineers ICPRB Presentation Potomac Watershed Roundtable January 9, 2009.
High Altitude View of ACF Regional Water Plans.
Land of the Living Waters The South Llano River, its Springs, and its Watershed Photos: Jennifer Walker.
1. 2 Required under water right Establishes limit on LCRA firm water contract sales from lakes Industry standard for evaluating available water supply.
Chapter 21 Water Supply, Use and Management. Groundwater and Streams Groundwater –Water found below the Earth’s surface, within the zone of saturation,
Water Reservation for Caloosahatchee Estuary April 16, 2010 Caloosahatchee Estuary Reservation Team Everglades Restoration and Capital Projects Office.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Water Rights Permitting Process What TCEQ is looking for to make an application administratively complete Water Rights Permitting & Availability Section.
A Jurisprudential Model for Sustainable Water Resources Governance By Professor D. E. Fisher.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Water Availability 1996 Texas drought –Governor Bush asks “how much water do we have? How much are we using? How much do we need?” -- Ooops. No good answers!
Regulation and Development in the Edwards Aquifer Zone
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Water Rights Permitting Process
Texas Hydrological Conditions An Overview
Klamath ADR Hydrology Report
Drought in Texas Texas Division of Emergency Management
Policy Principles for the Allocation of Recycled Water
Environmental Flow Protection in TCEQ Permitting
Water Quality and Environmental Flows
WATER POLICY And Management in AlabamA
Interpreting Water Rights
State Agency Perspective of Estuary Program Subcommittees
SETTLEMENT DOCUMENT SUBJECT TO IRE 408
Preciptation.
Lisa Jaramillo Transfer and Conservation Section Manager Kelly Starnes
Westcas position paper
Water Rights Permitting Process
Brooke McGregor, Program Liaison, Watermaster Section
Presentation transcript:

Presentation Texas Water: What You Should Know November 6, 2010

The San Antonio River Authority (SARA) was created by the State Legislature in 1937, then reorganized in 1961 to plan, manage and implement water-related programs and projects within the San Antonio River Basin.

Vision: Leaders in Watershed Solutions Mission: Sustain and Enrich Life in the San Antonio River Watershed

4 Agency Goals 1.Generate lasting and recognized improvements to the health of the San Antonio River Watershed; 2.Enhance community appreciation for and access to the San Antonio River and its tributaries; 3.Strengthen and develop expertise at all levels; 4.Diversify and leverage funding sources

5 Storm Runoff and Strong Base flows Satisfy Water Rights and Contribute to Instream Flows and Freshwater Inflows to the Guadalupe Estuary Medina Lake Medina Lake San Antonio Return Flows Guadalupe Estuary Guadalupe Estuary San Antonio River San Antonio Springs San Antonio Springs

Water Right Permits Prior appropriations system in Texas and the issuance of a water right – Priority Date – Water Availability – Beneficial use – Existing Water Rights – Environmental Impacts – Consistency with the Regional and State Water Plans – Notice within the Basin

Permit Exemptions Domestic Livestock Wildlife management Sediment control as part of mining operations Historic cemeteries

Priority Date / Seniority Senior water rights – Permitted Pre 1950’s Junior water right – Permitted Post 1950’s Permits with Special Conditions/Restrictions – Permitted Post 1980’s New Appropriations have environmental flow restriction. – Proof of reliability an issue 8

Primary Uses in San Antonio River Domestic Livestock Irrigation Industrial

Water Rights on the San Antonio and Medina Rivers 10 Total of 258 permits totaling 183,710 acft/yr

SARA Objectives 1)Maintain instream flows in the San Antonio River and its major tributaries. 2)Maintain freshwater inflows to the Guadalupe Estuary. 3)Acquire and beneficially use surface water rights for environmental flow and traditional water supply purposes. 11

12 SARA’s Surface Water Rights Acquisition Project Improve management and availability of water resources Comprehensive study of water rights use – study indicated significant percentage of water rights are under utilized or not utilized Determined to establish and expand the River Authority’s water rights inventory – ensure that adequate water resources exist to serve the needs of the district. Water Rights can also serve the needs of the River Authority constituents in times of drought.

13 SARA’s Water Rights Clinton - – WR # – 333 acre-feet per year – April 25, 1950 Drzymalla – – WR # – 186 acre-feet per year – October 1, 1984 Dugi – – WR # – 173 acre-feet per year – August 10, 1998 Corbin - – WR # – 200 acre-feet per year – June 22, 1981 Helton - – WR # – 81.6 acre-fee per year – 1926 (23); 1989 (58.6)

14 Water Availability based on the Region L assumptions (acft/yr ) The table contains the available (unappropriated) streamflow at the three (3) locations assuming full utilization of existing rights. Note that the true availability to a “new” project located at one of these locations may also be based on maximum diversion rate, inclusion of environmental flow criteria, and other factors. Falls City gageGoliad gage Minimum01,397 Average ( )139,091331,348 Drought Average ( )13,62799,493 Maximum891,7991,341,760

15 Major Treated Effluent Discharge Locations

Indirect Reuse Water Effluent is discharged into a state watercourse pursuant to National Pollutant Discharge Elimination System (NPDES) or Texas Pollutant Discharge Elimination System (TPDES) permit and diverted downstream for use Quantity regulated by Water Code Title 30 TAC Chapters 295 and 297 Requires Water Right Permit from TCEQ

17 Major Treated Effluent Discharge Locations in SARA District

18 San Antonio Water System – Historical Treated Effluent San Antonio Water System – Historical Treated Effluent

21 Calaveras & Braunig Lakes Multi-purpose reservoirs owned by the City Public Service Board of San Antonio providing water supply for steam-electric power generation. Conservation storage = 89,300 acft Authorized consumptive water use at the reservoirs = 49,000 acft/yr Authorized make-up diversions from the San Antonio River = 72,000 acft/yr

24 Guadalupe Estuary — TWDB Historical Freshwater Inflow 24

25 Guadalupe Estuary — TWDB Historical Freshwater Inflows 25

26 Guadalupe Estuary – Freshwater Inflow Components Example Wet Year = 1992 Total Year = 7,696,573 acft

27 Guadalupe Estuary – Freshwater Inflow Components Example Wet Year = 1992 Total Year = 7,696,573 acft SAWS Effluent (2%) 153,900 acft San Antonio River Runoff (27%) 2,078,100 acft Total San Antonio River Contribution (29%) 2,232,000 acft

28 Guadalupe Estuary – Freshwater Inflow Components Example Average Year = 1994 Total Inflow = 1,880,028 acft

29 Guadalupe Estuary – Freshwater Inflow Components Example Average Year = 1994 Total Year = 1,880,028 acft SAWS Effluent (5%) 94,000 acft San Antonio River Runoff (20%) 376,000 acft Total San Antonio River Contribution (25%) 470,000 acft

30 Guadalupe Estuary – Freshwater Inflow Components Example Dry Year = 1996 Total Inflow = 644,041 acft

31 Guadalupe Estuary – Freshwater Inflow Components Example Dry Year = 1996 Total Year = 644,041 acft SAWS Effluent (14%) 90,200 acft San Antonio River Runoff (11%) 70,800 acft Total San Antonio River Contribution (25%) 161,000 acft

Questions & Discussion