Caltex Refinery Commitment to Operational Excellence A Presentation to the Environmental Affairs and Tourism Parliamentary Portfolio Committee By Steve.

Slides:



Advertisements
Similar presentations
Air Permitting and Compliance Smithfield Foods Environmental Conference Chicago, IL July 2013.
Advertisements

DEQ Mission By the end of the decade, Virginians will enjoy cleaner water available for all uses, improved air quality that supports communities and ecosystems,
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
Green Manufacturing: Adopting Energy Efficiency in Manufacturing Supply Chains -Dangote Cement Strategy By Pabby Paramjit Director, Dangote Academy.
Mike Turner - Senior Vice President, Global Production License to Operate: Socio-economic Impacts and the Public-Industry Partnership.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Self-monitoring programme for a Swedish power plant Hans-Roland Lindgren Director Swedish EPA 1.
Highlights of Colorado’s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014 Presentation to WESTAR May 2014 Will Allison Colorado.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
EMS, VEEP, Performance Track, … - Voluntary Programs – What’s In It For Me and What’s In it For You?
Prince George Refinery Environmental Management Programs 2009.
Harvard School of Public Health Appendix 6 Chinese Petroleum Corp. Kaohsiung Refinery Harvard School of Public Health Paul Boyce, MD and Jennifer Cavallari,
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
| 1 | 1 REDUCING THE IMPACT OF SHIPPING ON THE ENVIRONMENT DECARBONISATION.
Environmental Challenges in Petroleum Industry Dilip Biswas.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
TADGER Turbulating Atomizer Diesel Gas Emission Reducer
© Groundwork Cheshire EMS Adding Value 7 th July 2010 Environmental Management Systems (EMS) - Adding Value Karen Szmidt Resource Efficiency Specialist.
Bay Area Emission Reduction Strategies June 4, 2008 Jean Roggenkamp Deputy Air Pollution Control Officer Bay Area Air Quality Management District.
Corporate Social Responsibility- do we need a Statutory Instrument? Presented to the Zambia Alternative Mining Indaba conference- July 17, 2013 Sombo Chunda,
75TH CIVIL ENGINEER GROUP BE AMERICA’S BEST Hill Air Force Base Environmental Compliance 17 DEC 09 Environmental Compliance 75 CEG/CEVC
Chapter 12: Air.
Energy Efficiency and Ecological Safety KazEnergy Forum 2001 Astana, October Nick Maden Senior Vice President Statoil Exploration.
Ship Recycling Facility Management System IMO Guideline A.962
ORC Asia Pacific Safety, Health & Environment Forum Mind of the Customer Presentation ExxonMobil Scott Arvin Asia Pacific Downstream & Chemical SHE Manager.
© ChevronTexaco 2003 Global Aviation Welcome to BASIC Behavioral Approach to Safety Improvement in ChevronTexaco.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
PRODUCTION OPERATIONS AND MAINTENANCE
Name, event, date Lew Fulton UNEP May 23, Road Map of Today’s Presentation 1.Urban Growth & Air Pollution Problems: (a)Urban populations and growth.
British Petroleum ISO Certification
Air Quality Programs.
Anti-Trust/Competition Law Compliance Statement INTERTANKO’s policy is to be firmly committed to maintaining a fair and competitive environment in the.
Optimizing Energy Efficiency, an Imperative for the Process Industry Christopher Smith Global Practice Leader, Energy Efficiency PMA March 2011.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
1 BULGARIA PUBLIC- PRIVATE PARNERSHIP FOR REMEDIATION OF HISTORICAL POLLUTION Dr. Vania Grigorova Ministry of Environment and Water Bulgaria Managing for.
Instructor Özgür ZEYDAN (PhD.) Department of Environmental Engineering.
Integrated Energy Efficiency Management
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Responsible Care® Basic Awareness 1. DISCUSSION POINTS 2 WHAT IS RESPONSIBLE CARE®? HOW DOES RESPONSIBLE CARE® ADD VALUE? WHAT CAN YOU DO TO SUPPORT RESPONSIBLE.
Progress Energy Issues Overview April 25, 2006 Don Cooke Sr. Environmental Coordinator.
June 2015 Sustainability Cultural Indicators Program (SCIP) YEAR 3 UPDATE Sustainability Cultural Indicators Program (SCIP) YEAR 3 UPDATE.
Sustainability Elements of the ARRA, and Getting the Most out of Stimulus Funding Jeannie Renne-Malone, LEED AP National Director – Climate Change & GHG.
HSE Plan meeting - November – Health, Safety & Environmental Plan 2015.
1 Region 5 Enforcement Approach George Czerniak June 13, 2007 NACAA Enforcement and Compliance Workshop.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
1 MINE HEALTH AND SAFETY INSPECTORATE PRESENTATION TO PARLIAMENT PORTFOLIO COMMITTEE ON INSPECTORATE 2011/12 ANNUAL REPORT 7 November 2012.
Global OE Focus Week 6 – 10 February 2011 “Incident Free Starts With Me”
GENERAL MOTORS ENVIRONMENTAL MANAGEMENT SYSTEMS Al Hildreth, Global Energy Manager May 29, 2014.
An Overview DCC Annual Retreat February 20, 2012.
MPCA Citizens’ Board Meeting: United States Steel Corporation-Keetac Air Emissions Permit Owen Seltz Industrial Division September 13, 2011.
2035 General Plan Update Joint Study Session on Draft Conservation Element Planning Commission and Parks & Recreation Commission December 1, 2015.
J.K. AnsellKS. J.K. AnsellKS SAFETY POLICY J.K. Ansell Ltd. recognizes people as its principal asset and hence safety is as its No.1 Priority. Safety.
Process Technology I: Equipment 14. Boilers
First in Service First in Value
Compliance and Enforcement Presentation to Industrial Association of Contra Costa County February 22, 2017 Paul Grazzini, Air Quality Specialist Bay.
Dr. Mike Rose Sasol Limited GM - SH&E centre
Eskom’s response to Minimum Emission Standards
STEP OVERVIEW PRESENTATION
Basic overview of an EMS
EICC/GeSI focus: Corporate Responsibility
Presentation transcript:

Caltex Refinery Commitment to Operational Excellence A Presentation to the Environmental Affairs and Tourism Parliamentary Portfolio Committee By Steve Woodruff Caltex Refinery General Manager 23 August 2005

Safety Moment

First Aid 100 Eliminating ‘at Risk’ Behaviors & Hazardous Situations 10,000 Lost Time Injury/ Recordable Injury 10 Near Miss 1,000 1 Fatality Forward-Looking Predictive Preventative Historical Learning Look-back To prevent injuries, we must focus below the line Focus on injury prevention

An overview of the Caltex Refinery

Caltex refinery – then and now 1966:Refinery started up ( bpsd). 1970:More units added ( bpsd). 1975:Capacity increase ( bpsd). 1977:Debottleneck ( bpsd). 1978:North refinery built ( bpsd). 1990:Instrument modernisation project. 1992:Octane enhancement project. 1995:Unleaded petrol project. 1996:Jet fuel project. 1998:New steam boiler. 2000:Tailgas treating unit. 2002:Sulphur pastillation project. 2005:Clean fuels project. [PMG note: Graphics not included]

Chevron corporate vision Vision for Operational Excellence “To be recognised and admired by industry and the communities in which we operate as world-class in safety, health, environment, reliability and efficiency.” Dave O’Reilly Chairman and CEO Chevron Corporation

Caltex refinery mission 2005 – – 0 – 84.5 – 100 [PMG note: Graphics not included]

Refinery mission 0Injuries 0Incidents 84.5%Plant utilisation 100%Engagement with employees and external stakeholders

Our journey to world class environmental performance started 10 years ago

More than R450 million invested in environmental improvements

Progressive reduction in air emissions

A 79% reduction in sulphur dioxide emissions

Refinery Burner Fuel – Reduction of Sulphur Dioxide Emissions R 30 million  Control sulphur in burner fuel below 2 wt% sulphur  Minimise Fuel Oil firing  Maximum Gas firing  Gas is low in sulphur content  Sulphur in burner fuel part of crude selection Future Plans Work towards 100% gas firing

Sulphur Recovery Units – Reduction of Sulphur Dioxide Emissions R 71 Million Tailgas Treating Unit installed in 2000 Future Plans Continuous improvement in reliability and efficiency of unit

Our Journey continues Measurement Modeling Control Work with DEAT, City of Cape Town to meet requirements of new AQA Sources of sulphur dioxide

An 80% reduction in particulate matter (dust) emissions R 40 Million Installation of Electrostatic Precipitators in 1996/1997 Future Plans Continuous improvement in reliability and efficiency of units

Reduction in volatile organic compound emissions R8 million Installed tank seals on all floating roof tanks at the refinery Future Plans  Fenceline monitoring to collect baseline information on VOC emissions from the refinery [2005 – 2006]  Complete a R70 million upgrade of effluent plant [2005 – 2007]

Effluent plant upgrade (R70 million) Implementing new effluent project to improve quality of used water going out to sea. Project will reduce VOCs from effluent plant. Have had a number of meetings with kitesurfers to resolve issues, develop plans and build trust. Project work in progress to bring effluent treatment facilities in line with world class – equalisation & secondary treatment (Phase 3 & 4 of project) New effluent license issued Oct CalRef currently within permit specs although upgrade to be carried out to meet 2007 requirements [PMG note: Graphics not included]

Guiding Principles of Refinery Air Emission Reduction Plan  Focus on SO 2, VOCs, NOx, H 2 S, particulates, black smoke (opacity), flare  Alignment with Chevron vision for operational excellence  Alignment with new Air Quality Act  Evaluate options for improved measurement and reduction of air emission  Focus on technology investment and improving reliability  Continue to involve stakeholders

Community Air Quality Monitoring

Daily Average, Ground level SO 2 as monitored in Bothasig, Goodwood, Table View and Killarney

We are focusing on plant reliability to eliminate incidents

Incidents DateIncident Description 26 February 2003Black smoke from refinery stacks 04 July 2004Pressure safety valve lifted causing crude oil spray 10 January minute black smoke flare 13 January 2005Pressure safety valve lifted causing some diesel spray 04 February 2005Fire 14 March 2005Three minute black smoke flare

Strong reliability focus is our key strategy for eliminating incidents Reliability focus will improve environmental performance: Visible leadership and accountability Preventative maintenance Training and development Reinforce procedure compliance and pre-task planning Shutdown effectiveness [PMG note: Graphics not included]

Major projects in 2005

Joint venture between Caltex & Improchem to purify sewerage water for Potsdam refinery boilers using reverse osmosis Conservation Incentive – Saving drinking water for 6000 households [PMG note: Graphics not included] Water Recycling Project (R30 million)

Clean Fuels Project ( R200 million) Project to produce lower sulphur diesel (0.05 wt%) by end 2005 according to new government specifications [PMG note: Graphics not included]

Community Involvement Partnering with environmental groups and air quality authorities to implement fenceline air (VOC) monitoring. Introducing neighbours to the refinery. [PMG note: Graphics not included]

Thank You