Land Use Program Septic System Overview Scott Weldon 619 441 4086

Slides:



Advertisements
Similar presentations
Cochise, Maricopa, Mohave, Navajo, Pima, Pinal, Yavapai and Yuma Counties.
Advertisements

LEGISLATIVE UPDATE Robert A. Tardif, P.E., Administrator Subsurface Systems Bureau New Hampshire Department of Environmental Services.
Groundwater What is it and why is it important?
Sewage Treatment.
NOTICE TO OPERATORS DRILLING WELLS WITHIN 3/4 MILE OF THE RIM OF THE ROAN PLATEAU IN GARFIELD COUNTY PIT DESIGN, CONSTRUCTION, AND MONITORING REQUIREMENTS.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
WASTEWATER MANAGEMENT. TABLE OF CONTENTS Wastewater Management Reuse Recycle Discharge and Treatment Publically Owned Treatment Works On-Site and Decentralized.
Waste Treatment – Septic Systems Lab #7. Objectives  Know how a conventional septic system works.  Be able to describe three alternative systems that.
Identifying Failing Septic Systems and Straight Pipe Discharges.
The Drain Field Function What goes into the drain field? How the drain field functions? What causes the drain field to fail?
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
Onsite Wastewater Treatment Systems Module 4:1. What is a Septic System? Module 4:2 Photo credit: MOEE.
 Carry both sewage and storm water.  During average rainfalls the volume of water is 5-15 times greater than normal.  Sewage treatment plants are not.
WASTEWATER ENGINEERING
Waste treatment. WASTEWATER (Chapter 22) Sewer – Sanitary waste Generated from buildings –Liquid discharged from plumbing fixtures Carried by sanitary.
Connecticut Department of Energy and Environmental Protection.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
1 Septic Tank Drainfield Site Suitability and Evaluation Workshop Montana State University Extension Service, Department of Land Resources an Environmental.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Muskegon Wastewater Treatment Facility
Waste Water Disposal Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 2aWaste Water Disposal and Storm Drainage Chapter 4, 7; Appendix A.
SEPTIC SYSTEMS AND WELLS IN SOLANO COUNTY Solano County Environmental Health Division 601 Texas Street, Fairfield CA (707)
TECHNICAL SECTION 2000 TRAINING LIQUID WASTE LAND USE SOLID WASTE BIOSOLIDS HOUSING VECTOR WATER INDIVIDUAL PUBLIC.
Wastewater Management Why ?. Why are we concerned about wastewater? Public Health Protection Waterborne diseases Environmental Protection Our lands and.
SITE EVALUATION BASICS OF THE TRADE. Ken Stratton.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 7: Existing Septic Systems: Inspections and Corrective.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Water Pollution. How does a flood relate to an aquifer? A flood occurs when an aquifer is completely saturated and water cannot move downward POTABLE:
Unit C: Topic 6 NIMBY: Not In My Back Yard. Producing Wastes Since the industrial revolution, the amount of wastes being produced has been increasing.
SEWAGE TREATMENT.  Sewage is the mainly liquid waste containing some solids produced by humans, typically consisting of washing water, urine, feces,
DO YOUR PART, BE SEPTICSMART! mart.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 4: Design and Plan Review— Conventional Systems Part.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Liquid Waste Management
Last Question of the Day- For first semester! 1. How do you get the waste out of wastewater o For Friday, please gather all Questions of the day to turn.
It All Starts Here... A day in the life of your waste water...
Milking Center Wastewater Treatment Created by Josh Appleby, MAEAP Verifier, MDA.
MIAMI-DADE COUNTY REGULATORY AND ECONOMIC RESOURCE DEPT. DIVISION OF ENVIRONMENTAL RESOURCE MANAGEMENT (DERM) “THE PERMITTING PROCESS TO DISPOSE OF STORMWATER.
Waste Water Treatment. Assignments Draw, label and explain each step in the wastewater treatment process.
Environmental Science  Mid-1800s, 25,000 people living along the River Thames in London died of cholera  River was declared “dead” by 1950  Walk.
City of Franklin Department of Building and Neighborhood Services Transitioning from Private Sewage Disposal to Public Sanitary Sewer September 30, 2010.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Septic System Overview
Liquid Waste Management
Septic systems.
Biosolids Public Workshop March 22, 2016
Sewage Treatment.
Homeowner Responsibility
What is an on-lot sewage system?
Maintenance of the On-Lot Sewage System
NORTH TRUNK SEWER REPLACEMENT PROJECT
Wastewater Treatment.
Tuscarawas County Health Department Operation Permit
Private Septic Systems
Liquid Waste Management
Septic System Failure GET PUMPED!.
Water Pollution.
Factsheet: Proper Permanent Well Abandonment for Virginia Coastal Plain Wells VDH DEQ What is.
Wastewater Management
Water Conservation and Septic Systems
Septic System Construction and Location
Private Septic Systems
Presented by: Jon Bellamy
On-Site Wastewater Treatment Systems
On-site Wastewater Treatment Systems
Do your part, be septicsmart!
What to Expect When You’re Inspected
Homeowner Responsibility
Presentation transcript:

Land Use Program Septic System Overview Scott Weldon

Definition of “Septic System”  A subsurface sewage disposal system which uses a combination of a septic tank and a effluent dispersal mechanism.  A two-chamber septic tank is used to accumulate solid matter. The solid matter is decomposed by anaerobic bacteria. Clear effluent then passes to the dispersal mechanism, which may be leachlines or seepage pits.  Septic tanks need to be pumped at least once every four years to remove solids.

Septic Systems are required for plumbed structures anywhere there is no public sewer  If public sewer is not within 200’ of a vacant lot that is proposed to be built out, the owner will need to install a septic system that is permitted and inspected by the County of San Diego, Department of Environmental Health.  The intent of a properly designed septic system is to keep sewage underground for at least 25 years.

Map of San Diego County

Percolation tests for septic systems  Consists of at least four 6” diameter borings in the proposed leachline/ pit area.  Must be completed by a licensed professional, and must follow County Policy for percolation test procedures.  A deep boring is also required to verify adequate soil depth and adequate separation to groundwater. Deep borings are 15’-20’ deep. Percolation tests must be completed to determine soil permeability.

Soil Permeability  Soil must be able to accept water over time in order for a septic system to work properly.  Clay soils have poor percolation rates, and may not support a septic system.

Groundwater Protection requirements  5’ separation required from leachlines to groundwater.  10’ separation required from Horizontal or Vertical Seepage Pits to groundwater.  100’ setback required from any portion of a septic system to a water well.  100’ setback required from a septic system to a year-around stream  50’ setback required from a septic system to a seasonal stream.  ¼ mile setback required from a vertical seepage pit to any well

Permit Process. A percolation test or septic layout is submitted and is field reviewed by DEH staff. Project is either approved or disapproved. If it’s disapproved, the owner has 12 months to correct any issues / concerns. 1. A percolation test or septic layout is submitted and is field reviewed by DEH staff. Project is either approved or disapproved. If it’s disapproved, the owner has 12 months to correct any issues / concerns. 2. Grading must be completed prior to issuance of the septic permit (i.e. pad or driveway grading). 3. A septic permit is then issued in order to install the system. The permit is valid for one year, and the system is inspected by the County at the time of installation.

Types of dispersal mechanisms  Leachlines – trenches 3’– 5’ deep with 1-2” rock under and around 4” perforated pipe.  Vertical Seepage Pits – 4’ diameter rock-filled pits. The bottom of the pit is kept at least 10’ above groundwater. Vertical pits are only allowed in areas with poor quality groundwater (basically along the coastline where salt water intrusion has occurred).  Horizontal Seepage Pits – A series of 5’ diameter rings that are 6’ tall. Soil must be very permeable (perc rate < 30 min per inch).

Surface discharge requirements  All sewage effluent is to remain underground. If a septic system fails, the septic tank should be pumped as necessary to keep sewage underground until repairs can be made.  A repair to a failing system usually consists of a 200’- 300’ leachline addition to the existing leachfield.  County Code requires a failing system to be repaired within 30 days.

Surface Discharge Requirements (continued)  Sediment control is important during the rainy season.  When excavating on your property, all run- off/sediment is to be kept on your property by using sediment basins, berms and/or silt fences.

Reserve Requirement  Each lot in San Diego County that has a septic system on it must have a designated area to replace the dispersal field should it fail. This area is known as the “reserve area”. No structures or hardscape may be placed in this area.  The average life expectancy of a septic system is 25 years.

What can go into a septic tank?  Domestic waste may go into a septic tank  Industrial waste, solvents, pesticides or fertilizers should not go into a septic tank.  The introduction of toxic materials into a septic tank will kill the biomat layer in the tank. The biomat layer then breaks up and goes into the leachline trenches, clogging the system up. This leads to premature failure.

Farm Labor Housing  Currently, there is no fee for the Department of Environmental Health to review Farm Labor Housing proposals.  The lot must be able to support the additional leachfield that will be required to accommodate the laborers in order for the Farm Labor Housing to be approved.

Future of Septic Systems in San Diego County State Assembly Bill 811 Promulgated by the State Water Board. All Counties are to have standardized requirements for septic systems. “aerobic” septic tanks are to be the norm by Effluent quality will be increased significantly, however the cost of septic systems will triple ( from approximately $7,000 to $25,000). Separation requirement to groundwater will be reduced to 4’. “Alternative” systems will be allowed. All septic systems are to be certified annually that they’re operating correctly by 2007(state Water Board requirement).

Alternative Systems  An “alternative” septic system consists of an aerobic septic tank and a dispersal mechanism. (conventional systems use anaerobic septic tanks).  Oxygen is added to the aerobic tank by various methods. The down-side to aerobic systems is that they have moving parts and require electricity. This opens the door to break-downs and/ or human error.  The positive aspect is that effluent quality is exponentially better.

Alternative Systems (continued)  Since effluent quality is better, it may be possible to reduce the size of the dispersal field. Sizing of alternative systems is in its inceptive stage, and is still being worked out..  4’ separation to groundwater will be required.

Example of a Septic Tank

Tank tied to leachfield

Example of a leachline