WCWSS Serves more than 3 million people –Supply to Cape Town and some West Coast, Boland, Swartland and Overberg towns Irrigation –In the Berg, Eerste.

Slides:



Advertisements
Similar presentations
Ontario Low Water Response (OLWR)
Advertisements

Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Climate Change and Water Resources in Lebanon Nadim Farajalla, PhD Director Department of Land, Water and Environment SETS.
2 nd International Conference Graz October, 10 th 2012 Techniques to save water quantity PP5 (LCA) PPs: LCA, LfULG, RNA.
Texas State Water Planning Methodology Runnan Li Katie Born James Bronikowski.
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
1 Wastewater and Water Re-Use in Israel Eng. Alexander Kushnir Director General Israel Water & Sewage Authority March 2012.
DWA’s Long-term Water Requirement Scenarios Presentation to Rand Water Services Forum Dragana Ristic- 15 October 2014 DS: National Water Planning 1 water.
Hashemite Kingdom of Jordan Ministry of Water and Irrigation authority Water in Jordan: The way forward 2012 Pre by: Eng.Rateb Al-Adawn Water in Jordan:
Hydropower Development: Experience of Nepal
Portfolio Committee on Water Affairs and Forestry Support Received from DWAF and Amatola Waters Role in Rural Development of Water, Sanitation and Forestry.
Improving the Energy Efficiency of the Heat and Hot Water Supply Presenter: Bayramgul Garabaeva, Programme Officer Decentralization and Community Development.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Study Steering Committee, 6 October 2012.
Making the Linkage Between Water Management & Planning Rita P. Maguire, President and CEO ACMA 2006 Summer Conference July 27, Tucson, AZ.
Options To Increase the Water Availability SSC Meeting on 30 April 2013, Bundu Lodge, Nelspruit.
Capacity Building in Analytical Tools for Estimating and Comparing Costs and Benefits of Adaptation Projects in the Berg River Basin, South Africa AIACC.
Zululand Chamber of Business and Industry Reconciliation Study Programme Background 8 March 2012 Niel J van Wyk Chief Engineer: National Water Resource.
Overview of the Colorado River Basin Water Supply and Demand Study Urban Water Institute 19 th Annual Water Policy Conference August 22-24, 2012 San Diego.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
INKOMATI CATCHMENT MANAGEMENT AGENCY Science & Management.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2010 Yakima Basin Science & Management Conference Yakima River Basin Study June 16, 2010 Joel Hubble, Technical Projects Biologist Columbia-Cascades Area.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Department of Water Affairs Water Requirements and Availability Reconciliation Strategy for Mbombela Municipal Area Water Conservation and Water Demand.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
Environmental Risk Assessment: First Application – Climate Change Request for Proposal: Oct Contract Start Date: Dec Completion Anticipated:
An Interregional Water Solution with Conjunctive Use of Groundwater Haskell L. Simon President, Coastal Plains Groundwater Conservation District Vice President,
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
World Water Forum Session 3.2.1: Using a structured set of strategies to ensure adequate water to the large metropolitan areas in South Africa Peter H.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
1 Presentation to the Portfolio Committee: Water & Environment Presentation by Mr Trevor Balzer Programme Manager: Special Projects 16 – 17 March 2010.
Alternative Water Supply - A Water Services PerspectivePortfolioCommittee 14 September 2005 DEPARTMENT: WATER AFFAIRS AND FORESTRY.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND BERG WMA.
R ICHARDS B AY R ECONCILIATION S TRATEGY S TUDY Presented by: Erik van der Berg Aurecon 22 October 2013 R ICHARDS B AY R ECONCILIATION S TRATEGY S TUDY.
Connecticut Department of Energy and Environmental Protection.
PP 4.1: IWRM Planning Framework. 2 Module Objective and Scope Participants acquire knowledge of the Principles of Good Basin Planning and can apply the.
Water Quality and Agricultural Water Use in South Africa Agricultural Research Council (ARC) 21 June 2006 Mr. Reckson Mulidzi Mr. Thabiso Mudau.
Ecological and environmental impacts of large-scale groundwater development in the Table Mountain Group (TMG) aquifer system.
Water Conservation and Water Demand Management Progress with the Strategy Implementation 16 September 2010.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND LOWER ORANGE WMA.
NATIONAL WATER RESOURCE STRATEGY SOUTH AFRICA’S WATER SITUATION AND STRATEGIES TO BALANCE SUPPLY AND DEMAND BREEDE WMA.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Alternative water resources Presentation to Portfolio Committee 14 September 2005.
WATER DEVELOPMENT DEPARTMENT 1 Experiences of the Common Implementation Strategy From the Perspective of a new Member State – Cyprus Christodoulos Artemis,
Ecologic.eu Brussels, 19 March 2009 Environmental & economic impact of water pricing and quotas in the agriculture sector What do we learn from practical.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
California Water Plan Update Advisory Committee Meeting January 20, 2005.
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Public Hearing on Water Pollution and Water Challenges Date: 04 th June 2008 Venue: Ground Floor, NCOP Building.
1 Portfolio Committee on Water Affairs and Forestry National Water Act Review 22 October 2008.
National Guidelines for Integrated Management of Agricultural Water Use Developed by National Department of Agriculture with Department of Water Affairs.
Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs and Forestry Department of Water Affairs.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
British Columbia’s Water Sustainability Act and regulations Southern Interior Local Government Association April 22, 2016 Tina Neale Ministry of Environment.
THE NATIONAL CLIMATE CHANGE RESPONSE POLICY NATIONAL CLIMATE CHANGE RESPONSE POLICY CLIMATE CHANGE ADAPTATION The relevance of Adapting to Climate Change:
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
NATIONAL WATER WEEK CELEBRATIONS 15 MARCH 2017 PRESENTATION TITLE
Water Resources Plan 2040 Update
Presentation by Department: Water Affairs 22 March 2011
Local Government Climate Change Support Program 2016
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Content Background on the SA water resource
LIFE and the implementation of the Water Framework Directive
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Presentation transcript:

WCWSS

Serves more than 3 million people –Supply to Cape Town and some West Coast, Boland, Swartland and Overberg towns Irrigation –In the Berg, Eerste and Riviersonderend rivers –Production of 50% of SA’s irrigated agricultural export High economic growth and migration into the system area Infrastructure owned by the DWAF, City of Cape Town (CCT) & Eskom Berg Water Project under construction near Franschhoek The Western Cape Water Supply System

90% runoff in Winter (May to Oct) 70% requirements in summer (Nov to Apr) 50% of system dams’ storage needed to store winter water for usage in summer 50% of system dams’ storage provides carry-over storage for drought periods Dams are operated to minimise spillage Droughts are managed by progressively restricting supplies WCWSS characteristics

To update and review water requirements and interventions to meet requirements To engage stakeholders and the general public To develop toolkits to assist with the future reconciliation of supply and requirement To provide a guide for decision-making towards effective reconciliation of supply and requirement To recommend preparatory measures, actions and assign responsibilities PURPOSE OF THE RECONCILIATION STRATEGY

Management of Study Professional Service Provider Steering Committee  DWAF HO  DWAF RO  CCT  Saldanha Mun.  Provincial Dept. of Agric  Province National Water Resource Planning Study Management RECONCILIATION STRATEGY STUDY Public participation Selected Stakeholder input

Reconciliation StrategyCCT WC/WDM Strategy CCT WSDP CCT’s Integrated Development Plan (IDP) Provincial Integrated Development Plan Berg Catchment Management Strategy Other WSDPs Institutional Planning Process

NEWSLETTER 1 PUBLIC MEETING To identify and provide feedback on interventions NEWSLETTER 2 PUBLIC MEETING To provide feedback on interventions for comment August 2005: Screening of Interventions Workshop Refine reconciliation scenarios and strategy content through stakeholder workshops and technical focus groups Input from the Berg and Breede-Overberg CMA Reference Groups NEWSLETTER 3 Summary of strategy to public for comment Determine and analyse a range of implementation scenarios Input from the Berg and Breede-Overberg CMA Reference Groups NEWSLETTER 4 Obtain public feedback on scenarios through press release and newspaper advert PUBLIC MEETING To present the Reconciliation Strategy and selected interventions for further study Strategy Steering Committee to consider comments DWAF WRFMC CCT Portfolio Committee CCT Mayco and Council Berg CMA Reference Group PUBLIC PROCESS FOLLOWED

STRATEGY THEMES Strategy Protection and Management Comparison of supply and requirement Selection of intervention s Stakeholder Engagement Implementatio n and Performance monitoring Monitoring and Information Management Water Availability Water Requirements Water Use Efficiency

Reconciliation Strategy 9 Themes each containing Key issues Objectives Approach Action Responsibility Programme Scenario Planning for Reconciliation of Supply and Requirement Treated Effluent use Supporting Reports WC/WDM Determination of Future Water Requirements Structure of Study Key Reports

CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination Options/ Interventions Identified

Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated effluent use Desalination  Pressure Reduction  Leak Detection and Repair  Meter management and replacement  Consumer awareness  School Education  Plumbing retro-fit prg  Support for large consumers  Re-use: Parks and Industry  Management Information System  Upgrade telemetry system CCT 8-yr WC/WDM Strategy

Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination  Tariffs, metering and credit control  Eliminate AFUs  Promotion of private boreholes & wells  Leak detection  Water Efficient Fittings  User Education

CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination  Newlands Aquifer  Cape Flats Aquifer  West Coast Aquifers  TMG Aquifer

CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination  Voëlvlei Phase 1  Michell’s Pass Diversion  24 Rivers Dam  Upper Wit River Diversion  Raise Steenbras Lower Dam  Upper Molenaars

CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination  Treated Effluent use Irrig./ind  Dual Reticulation  Commercial Irrig. Exchange  Treated Effluent use to Potable standards  Berg River Exchange

CCT 8-yr WC/WDM Strategy Additional Longer-term WC/WDM Groundwater Interventions Surface Water Interventions Treated Effluent use Desalination  CCT Pilot Plant  Desalination Plant

Scenario Planning The objective of the Scenario Planning Process is to identify, evaluate and assess alternative groupings and phasing of interventions so as to determine the potential impacts and benefits of possible combinations of interventions to reconcile water supply and requirement in the WCWSS, up to 2030.

SCENARIO 1SCENARIO 2SCENARIO 3 ILLUSTRATES IMPACT OF WC/WDM ON TIMING OF IMPLEMENTATION OF SUPPLY INTERVENTIONS NO WC/WDM CCT WC/WDM strategy implemented CCT WC/WDM strategy implemented & additional WC/WDM interventions

SCENARIODESCRIPTION Scenario1 No WC/WDM, but all supply interventions can be implemented Objective: To determine the impact of not implementing WC/WDM KEY FINDINGS  Supply Intervention required by 2011  Due to long lead times earliest supply intervention could only be implemented by 2014  Shortfall in supply between 2011 and 2013

SCENARIODESCRIPTION Scenario 2 CCT WC/WDM strategy implemented as well as supply interventions. Objective: To determine the impact of implementing the CCT’s WC/WDM strategy KEY FINDINGS  Supply intervention required by 2015  Implementation of CCT’s WDM strategy and programme delays supply intervention by 4 years

SCENARIODESCRIPTION Scenario 3 CCT WC/WDM strategy and programme implemented as well as additional longer term WC/WDM interventions and supply interventions. Objective: To determine the impact of implementing all the WC/WDM interventions KEY FINDINGS  Implementation of comprehensive WC/WDM could potentially delay supply intervention until approx  Comprehensive WC/WDM (100% successful implementation) can effect a saving of approx 100 million m 3 of water per annum by 2019

ILLUSTRATES IMPACT OF LOWEST URV SELECTION AS WELL AS IMPACT OF IMPLEMENTING ECOLOGICAL RESERVE AND POTENTIAL IMPACT OF CLIMATE CHANGE SCENARIO 7SCENARIO 8SCENARIO 9 CCT WC/WDM strategy & Lowest URV Interventions CCT WC/WDM strategy, Lowest URV Interventions & Ecological Reserve CCT WC/WDM strategy, Lowest URV Interventions & Possible Climate Change

SCENARIODESCRIPTION Scenario 7 CCT WC/WDM strategy implemented, thereafter selection based on URV. Objective: To determine the impact of selecting interventions based on lowest URV KEY FINDINGS  A mix of supply and demand interventions are available for selection in order to offset the anticipated shortfall in supply in  Net present value of this option is R1 092 million

Scenario 7: CCT WC/WDM strategy implemented, thereafter selection based on URV No.WC/WDM InterventionSupply Intervention 17 TMG Scheme 1 16 TMG Scheme 2 15WC/DM: User Education 14 TMG Scheme Rivers Dam 12 West Coast Aquifers 11WC/DM: Use of Water Efficient Fittings 10 Cape Flats Aquifer 9 Treated Effluent - Irrig./Ind 8 Voëlvlei Phase 1 7 Upper Wit River Diversion 6 Newlands Aquifer 5 WC/DM: Promotion of private boreholes & wells 4WC/DM: Leakage detection and repair 3WC/DM: Eliminate auto flush urinals 2WC/DM: Tariffs, metering and credit control 1CCT WC/WDM 8-year strategy

SCENARIODESCRIPTION Scenario 8 CCT WC/WDM strategy implemented, thereafter selection based on URV with the ecological Reserve being phased in for existing water resources Objective: To determine how the implementation of the ecological Reserve will impact on the selection of interventions KEY FINDINGS  The yield of the existing water resources decreased by approx. 46 million m 3.  Supply and demand interventions are available  Net present value of this option is R1 263 million.  Cost of implementing additional interventions in order to offset the anticipated decrease in system yield is approximately R171 million in today’s terms.

Scenario 8: CCT WC/WDM strategy implemented, thereafter selection based on URV with the ecological Reserve being phased in for existing water resources No.WC/WDM InterventionSupply Intervention 19 Lourens River Diversion 18 Raise Lower Steenbras Dam 17 TMG Scheme 1 16 TMG Scheme 2 15WC/DM: User Education 14 TMG Scheme Rivers Dam 12 West Coast Aquifers 11WC/DM: Use of Water Efficient Fittings 10 Voëlvlei Phase 1 9 Treated Effluent - Irrig./Industrial 8 Cape Flats Aquifer 7 Upper Wit River Diversion 6 Newlands Aquifer 5WC/DM: Promotion of private bore & well 4WC/DM: Leakage detection and repair 3WC/DM: Eliminate auto flush urinals 2WC/DM: Tariffs, metering and credit control 1CCT WC/WDM 8-year strategy

SCENARIODESCRIPTION Scenario 9 CCT WC/WDM strategy implemented, thereafter selection based on URV with the potential for climate change being factored in Objective: To determine how climate change could impact on the selection of interventions KEY FINDINGS  The yield from the existing water resources and future water resources was assumed to decrease by approx. 107 million m 3.  Supply and demand interventions are available for selection  Cost of impact is approx. R572 million

Scenario 9: CCT WC/WDM strategy implemented, thereafter selection based on URV with the potential for climate change being factored in No.WC/WDM InterventionSupply Intervention Treated Effluent use - dual reticulation Eerste River Diversion Lower Wit River Dam 19 Lourens River Diversion 18 Raise Lower Steenbras 17 TMG Scheme 1 16 TMG Scheme 2 15WC/DM: User Education 14 TMG Scheme Rivers Dam 12 West Coast Aquifer (Langebaan Road) 11WC/DM: Use of Water Efficient Fittings 10 Upper Wit River Diversion 9 Voëlvlei Phase 1 8 Treated Effluent use- Irrig./Industrial 7 Cape Flats Aquifer 6 Newlands Aquifer 5WC/DM: Leakage detection and repair 4WC/DM: Promotion of private boreholes & wells 3WC/DM: Eliminate auto flush urinals 2WC/DM: Tariffs, metering and credit control 1CCT WC/WDM 8-year strategy

”CONSERVATIVE SELECTION” AND IMPACT OF IMPLEMENTING ECOLOGICAL RESERVE AND POTENTIAL IMPACT OF CLIMATE CHANGE SCENARIO 10(A)SCENARIO 10(B)SCENARIO 10(C) CCT WC/WDM strategy & conservative Selection of Interventions CCT WC/WDM strategy, conservative Selection of Interventions, Ecological Reserve & Climate Change All WC/WDM interventions, conservative Selection of Interventions, Ecological Reserve & Climate Change

Additional longer-term WC/WDM interventions –Equates to approx 50% of the modelled potential WC/WDM saving –Uncertainties regarding actual savings achievable Newlands Aquifer –Small yield –Potential impact on river flow and existing users Cape Flats Aquifer –Perceived O&M concerns of sustainability of operating wellfield in a relatively high density area Upper Wit River Diversion –Potential difficulties in obtaining environmental approvals Scenario 10 (a) to (c) “Conservative Selection” Reasons for omitting specific interventions:

SCENARIODESCRIPTION Scenario 10 (a) CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions Objective: To determine the impact of selecting a “conservative portfolio” KEY FINDINGS  Supply interventions would have to be “fast tracked”.  To avoid “fast tacking” WC/WDM would have to be successfully implemented  Net present value of this option is R1 844 million (this is in comparison to a NPV of R742 million for Scenario 7, which was based on least cost selection and not a selection based on considerations of practicality and sustainability).

Scenario 10 (a): CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions No.WC/WDM InterventionSupply Intervention 9 Treated Effluent use - potable 8 Upper Molenaars (To Berg River Dam) 7 TMG Scheme 2 6 Lourens River Diversion 5 Raise Lower Steenbras (fast tracked) 4 Treated Effluent use - Irrig./Industrial 3 Voëlvlei Phase 1 (fast tracked) 2 TMG Scheme 1 (fast tracked) 1CCT WC/WDM 8-year strategy

SCENARIODESCRIPTION Scenario 10 (b) CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions including potential impacts of ecological Reserve and climate change Objective: To determine how the implementation of the Reserve and the potential for climate change could impact on the selection of interventions KEY FINDINGS  Supply interventions would have to be “fast tracked”.  Net present value of this option is R million.  Cost impact of climate change and implementing the Reserve is approx R million

Scenario 10 (b): CCT WC/WDM strategy, thereafter selection based on a conservative selection of interventions including potential impacts of ecological Reserve and climate change No.WC/WDM InterventionSupply Intervention 10 Desalination 1 Generic 9 Treated Effluent use - potable 8 Upper Molenaars (To Berg River Dam) 7 TMG Scheme 2 (fast tracked) 6 Raise Lower Steenbras Dam (fast tracked) 5 Lourens River Diversion 4 Voëlvlei Phase 1 (fast tracked) 3 Teated Effluent use - Irrig./Industrial (fast tracked) 2 TMG Scheme 1 (fast tracked) 1CCT WC/WDM 8-year strategy

SCENARIODESCRIPTION Scenario 10 (c) All WC/WDM interventions implemented, thereafter selection based on a conservative portfolio of interventions, including potential impacts of ecological Reserve and climate change Objective:To determine how the implementation of longer term WC/WDM interventions impacts on Scenario 10(b) KEY FINDINGS  Additional WC/WDM interventions delay supply intervention by 3 years  Net present value of this option is R2 718 million.  Benefit of delaying desalination by implementing additional WC/WDM interventions is approx R1 759 million

Scenario 10 (c): All WC/WDM interventions implemented, thereafter selection based on a conservative portfolio of interventions, including potential impacts of ecological Reserve and climate change No.WC/WDM InterventionSupply Intervention 15 Treated Effluent use- potable 14 Upper Molenaars (To Berg River Dam) 13 Lourens River Diversion 12 TMG Scheme 1 11 TMG Scheme 2 10 Raise Lower Steenbras Dam (fast tracked) 9 Voëlvlei Phase 1 8WC/DM: User Education 7WC/DM: Use of Water Efficient Fittings 6 Treated Effluent - Irrig./Industrial 5WC/DM: Leakage detection and repair 4WC/DM: Eliminate auto flush urinals 3 WC/DM: Promotion of private boreholes & wells 2 WC/DM: Adjustment of water tariffs, metering and credit control 1CCT WC/WDM 8-year strategy

ILLUSTRATES IMPACT OF LOW WATER REQUIRMENT CURVE SCENARIO 11 Low Water Requirement Curve CCT WC/WDM strategy & intervention selection based on URV

SCENARIODESCRIPTION Scenario 11 The low water demand requirement curve formed the basis of this analysis. CCT WC/WDM strategy implemented, thereafter selection based on URV Objective: To determine how the low water requirement curve and the least URV selection criteria could impact on the selection of interventions KEY FINDINGS  The Low Water Requirement curve would delay the next intervention (after the implementation of the CCT’s WC/WDM strategy) until 2024.

CONCLUSIONS Successful implementation of CCT’s WC/WDM 8-year strategy and programme is essential Additional longer-term WC/WDM interventions just as important Groundwater options very important – especially TMG Treated effluent use has massive potential. Treated effluent for potable use may be required as early as 2020 Desalination of seawater as long term “back-up” Feasibility studies should commence on both demand and supply interventions to ensure reconciliation of supply and requirement A Strategy Committee should be formed to ensure implementation of the strategy

Interventions Selected for Additional Study CCT WC/WDM Strategy and Programme Michell's Pass Diversion WC/WDM Adjustment of water tariffs, metering and credit control Newlands Aquifer WC/WDM Eliminate auto flush urinalsCape Flats Aquifer WC/WDM Promotion of private boreholes and wells West Coast Aquifer Recharge (Langebaan Road Aquifer) WC/WDM Leakage detection and repair Upper Wit River Diversion WC/WDM Use of water-efficient fittings Raising Steenbras Lower Dam WC/WDM User educationLourens River Diversion Scheme Voëlvlei Phase 1Treated effluent use Upper Molenaars Diversion

Strategy Committee A Strategy Committee should be established with the following objectives: To ensure that the strategy is relevant and updated, To monitor and co-ordinate the implementation of the relevant actions identified in the strategy, and To make recommendations on long-term planning activities required to ensure reconciliation of requirement and available supply in the WCWSS area A support group should be established to provide administrative scientific and technical support to the Strategy Committee

WC Provincial Government ( 5 REPRESENTATIVES) Local Authorities ( 5 REPRESENTATIVES)  City of Cape Town: 3 representatives  West Coast District Municipality: 1 representative  Cape Winelands District Municipality: 1 representative Department of Water Affairs and Forestry ( 9 REPRESENTATIVES)  Regional Office: 3 representatives  Integrated Water Resource Planning: 3 representatives  Water Use Efficiency: 1 representative  Water Resource Infrastructure Branch: 2 representatives Catchment Management Agencies (when established) ( 2 REPRESENTATIVES)  Berg CMA : 1 representative  Breede-Overberg CMA: 1 representative Water User Associations ( 2 REPRESENTATIVES)  Berg WUA: 1 representative  Breede-Overberg WUA: 1 representative Representation on Strategy Steering Committee 23 REPRESENTATIVES

RECOMMENDATIONS It is recommended that: A Strategy Steering Committee be formed to oversee the implementation of the Strategy The CCT and other WSAs should implement their WC/WDM strategies and programmes The CCT and other WSAs should develop integrated policies on treated effluent use and determine the full future potential for treated effluent use The CCT should continue with the TMG Feasibility Study and Pilot Project and the Desalination Pilot Plant as these could be significant future water resources The DWAF and the CCT should initiate studies on a number of interventions to ensure the reconciliation of supply and requirement

Thank you ANY QUESTIONS