1 Effluent Guidelines for Construction Greg Davis USEPA

Slides:



Advertisements
Similar presentations
Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
Advertisements

Storm Water General Permit For Construction Activities(OKR10) Stakeholder Advisory Committee Meeting December 15, 2011 Watershed Planning and Storm.
Stormwater Pollution Prevention Plan (SWP3) Requirements
WATER QUALITY ANALYSIS for ANTIDEGRADATION
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
MCM 5 – Post-Construction Runoff Control (DRAFT) YES NO Post-construction stormwater management for that construction activity is in compliance with MCM5.
Post-construction rates and volume of stormwater runoff on-site will be equal to or less than that of pre-development rates and volume of stormwater runoff?
Stormwater Regulations and Programs Law Permits Watershed Programs Information available at
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Preventing Storm Water Pollution: What We Can Do Question and Answer Game PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND.
4/27/2015 Licking County Engineer’s Office MCM#6 Training MCM#6 – Pollution Prevention/Good Housekeeping for Municipal Operations Licking County & Partners.
What is NPDES? “National Pollutant Discharge Elimination System”
Let’s Pick our Storm Survivor Teams… Team 1 – DucksTeam 1 – Ducks Team 2 - WhalesTeam 2 - Whales.
STORMWATER PERMITTING Requirements for the Solid Waste Industry in Colorado 5/04.
Stormwater Management
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
GAR General Storm Water Permit for Industrial Activity
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Building Green in Bowling Green
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
 NEW PRODUCT –The Dual Polymer System  Why Treat?  EPA’s (ELG)  Active Treatment  Semi-Active Treatment  Passive Treatment.
MDOT Storm Water Management Plan Module 3: Maintenance Considerations Together… Better Roads, Cleaner Streams.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Office of Sustainability Presented by Sofia Habity EROSION AND SEDIMENTATION CONTROL.
Expedited Settlement Offer Worksheet Deficiencies Form
Introduction to Construction General Permit Inspections.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Conservation Strategies for Growing Communities. The Growth of Urban Conservation.
Employees can help reduce water pollution by preventing dirt and debris from being washed into the storm drain system during the following activities:
Stormwater Rain and melting snow Collected by storm drains and flows into streams, rivers, lakes.
Texas Pollutant Discharge Elimination System Stormwater Construction General Permit (CGP) 2013 TCEQ Environmental Trade Fair April 30 – May 1, 2013 Lindsay.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Short Elliott Hendrickson Inc. April A. Ryan, PE.
EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
MDOT Storm Water Management Plan Module 2: Best Management Practices
New Stormwater NPDES Construction General Permit Effective August 3, 2011 New Stormwater NPDES Construction General Permit Effective August 3, 2011 Samir.
Stormwater Compliance Training South County Regional Wastewater Authority July 2015 Jack Rosenburg CH2M / Oakland.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
Surface Runoff What is it?
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
TH 53 Project & MPCA’s Construction Stormwater Permit.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Duane Sandvick Division of Water Quality (701) February 25,
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
Preventing Storm Water Pollution: What We Can Do Land Disturbances PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S.
City of Clarksville Storm Water Management Manual Revisions 2014.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
MS4 & Construction Storm Water Permits
Environmental Rule 327 IAC 15-5 to a General Permit
Supervisor, RIDEM RIPDES Permitting Program
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
Vehicle & Equipment Maintenance/Cleaning
TPDES Construction General Permit Compliance
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

1 Effluent Guidelines for Construction Greg Davis USEPA

2 EPA promulgated Construction and Development effluent limitations guidelines December 1, New rule requires all construction sites subject to permits to implement erosion and sediment controls and pollution prevention measures

3 What is an ELG?  Technology-based standards for control of wastewater and stormwater discharges from various categories of industry  Where ELGs are not sufficient to meet water quality, water quality based effluent limitations may apply.

4 2-Part ELG for Construction Erosion and Sediment Control Requirements (BMPs) applicable to all permitted sites Numeric limits – 280 NTU limit applicable to larger projects

5 Phased Approach for Numeric Limits Numeric effluent limits apply to: 20+ acre sites on August 1, acre sites on February 2, 2014 Requirements must be incorporated into state permits whenever permits are re-issued (Colorado’s permit expires in 2012)

6 What About Existing Projects? For existing projects covered by general permits, the rule would apply whenever a new general permit is issued and that project applies for coverage under the new permit For existing project covered by individual permits, the permitting authority can wait until a new general permit is issued to issue a new individual permit

7 Erosion and Sediment Control Requirements Control stormwater volume and velocity within the site to minimize soil erosion; Control stormwater discharges to minimize erosion at outlets and downstream channel and streambank erosion; Minimize the amount of soil exposed during construction; Minimize the disturbance of steep slopes; Design, install and maintain erosion and sediment controls considering factors such as precipitation and soil characteristics; Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal and maximize stormwater infiltration, unless infeasible; and Minimize soil compaction and, unless infeasible, preserve topsoil.

8 Soil Stabilization and Dewatering Requirements Initiate stabilization of disturbed areas immediately whenever any clearing, grading, excavating or other earth disturbing activities have permanently ceased, Initiate stabilization immediately when earth disturbing activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. In arid, semiarid, and drought-stricken areas where vegetative stabilization is infeasible, alternative stabilization measures must be employed. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations are prohibited unless managed by appropriate controls.

9 Pollution Prevention Requirements Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures.

10 Prohibited Discharges Wastewater from washout of concrete, unless managed by an appropriate control; Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and Soaps or solvents used in vehicle and equipment washing.

11 Surface Outlets When discharging from basins and impoundments, utilize outlet structures that withdraw water from the surface, unless infeasible.

12 Turbidity Limitation and Monitoring Limit is based on polymer-assisted settling, but permittees can use any technology Turbidity limitation of 280 NTUs is a Daily Maximum Value Daily value at each discharge point is calculated by averaging all samples at that point –Individual samples can be above 280 NTU as long as average is below 280 NTU Permittees can phase land disturbing activities to stay below the disturbed acreage threshold

13 Technologies for Turbidity Control Settling (basins or check dams) Filtration –In-ground sand filter –Geotextile bags –Practices in channels (fiber check dams, geotextile products) In many cases polymer or flocculant addition may be necessary

14 Turbidity Limitation and Monitoring Limitation does not apply to interstate natural gas pipeline projects Limitation does not apply on days with precipitation exceeds the local 2-year, 24-hour storm event Sampling required at each discrete discharge point (basins, channels, pipes, etc.)

15 Sampling Requirements Monitoring frequency is up to the permitting authority, but EPA recommends at least 3 grab samples per day at each discharge point (during normal working hours) For linear projects, permitting authority can consider representative sampling instead of sampling at each discharge point Even if permitting authority allows representative sampling, all discharge points are still subject to compliance with effluent limitation

16

17 Questions ?