4321-016w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008.

Slides:



Advertisements
Similar presentations
1000 Friends of Florida Presentation on May 12, 2005 Presenter: Kart Vaith/CDM
Advertisements

Nutrient Issues at the Blue Plains WWTP February 2004.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Anne Arundel County Department of Public Works
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Paving a Path to Potable Reuse Flexible Treatment for To Be Determined Regulations Michael Watts, PhD, PE Water Technology Leader Garver.
Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Tier 1 Workshop Blue Plains Users October.
1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Monterey Peninsula Water Supply Project - Presentation to Monterey Co. Water Resources Agency June 25, 2012.
Deborah Helstrom, P.E. Utilities Technical Review Water Supply Division Membrane Bioreactors Treatment Systems.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
Effective Use Of Peracetic Acid to Reduce Effluent Disinfection Byproduct in Water Resource Recovery Facilities Isaiah Shapiro, EIT Dimitri Katehis PhD,
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Broward County-wide Master Reuse Plan
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
2008 Facility Plan Update May Purpose  Comprehensive Plan through 2033 –Builds on Past Work –Adjust for Changing Conditions  Identify Capacity,
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
1 District of Columbia Water and Sewer Authority George S. Hawkins, General Manager August 29, 2012 Revised August 30, 2012 Operating Agency Workgroup.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
1 Briefing Materials Flow and Nitrogen Issues By: D.C. Water and Sewer Authority February 28, 2008 Blue Plains Regional Committee Presented to: District.
Report of the NPDES Subcommittee. Conference Call Meetings July 8 and August 19 Mercury Discharges – Utility Request to Address Permit Requirements for.
Feasibility of Aquifer Recharge Using Reclaimed Water in the Tampa Bay Area March 31, 2009 Phil Waller, P.E.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Strategic Process Engineering Liquid Treatment Processes at the Blue Plains Advanced Wastewater Treatment Plant Introductory Workshop for Blue Plains Users.
Bacteria Rulemaking Inclusion of Bacteria Limits in TPDES Permits.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Water Supply Planning Workshop February 27, 2008 City of Hallandale Beach Commission Mayor Joy Cooper Vice Mayor Bill Julian Commissioner Keith London.
1 GE-Sw011 Southern Regional Wastewater Treatment Plant Ocean Outfall Rule Change Pilot Testing Plan of Study Development Monday, February 13, 2012.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Update on the resolution related to a rule to be proposed to the Texas Commission on Environmental Quality related to the beneficial reuse of wastewater.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
GWRS Final Expansion Project and SP-173 Update GWRS Steering Committee Meeting April 11, 2016.
Recycled Water Project Basis of Design Report
Update on PI Modeling and Nitrogen Removal at Blue Plains
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Manchester’s CSO Program: A Look Behind and a Look Ahead
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
Florida and Reclaimed Water
WASTEWATER MANAGEMENT IN TURKEY
City of Noblesville Wastewater Utility
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Big Sky Wastewater Facility Plan Update
Wastewater Facilities Upgrade Project
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Big Sky Wastewater Facility Plan Update
CP-TXT Water Supply Facilities Work Plan Amendment
City of Sunrise Wastewater Reuse Program
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Is the Bay Area Ready for Potable Reuse?
Post Point Treatment Plant Resource Recovery Project Update
CENTRAL FLORIDA POTABLE REUSE TEST PROJECTS .
Presentation transcript:

w-fn005 1 Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008

City of Hollywood Department of Public Utilities w-fn005 2 Agenda ■Regulatory Review ■Baseline Establishment ■Nutrient Reduction Options ■Reuse Alternatives

City of Hollywood Department of Public Utilities w-fn005 3 Regulatory Review ■HB 7139 / SB 1302 effective July 1, 2008 (Ch ) ■Outfall Nutrient Reduction by December 31, 2018 ■“Elimination” of Ocean Outfall (except in emergency) by December 31, 2025 ■> 60% of Outfall Flow to Reuse by December 31, 2025

City of Hollywood Department of Public Utilities w-fn005 4 General Requirements ■SFWMD may require reuse of water made available by the elimination of ocean outfalls [FS (2) (d) Reuse of Reclaimed Water] ■Construction of new outfalls and expansion of new outfalls is prohibited [FS (9) (a)] ■Existing outfalls capped at capacity as of July 1, 2008 [FS (9) (a)] ■Outfall discharge prohibited after Dec. 31, 2025 except for functioning reuse system back-up [FS (9) (d)]

City of Hollywood Department of Public Utilities w-fn005 5 Baseline Nutrients and Flows ■FDEP to establish average TN and TP baseline loadings using monitoring data from 2003 to 2007 expressed as average annual daily loadings [FS (9) (b)] ■FDEP to establish Facility Actual Flows using monitoring data from 2003 to 2007 of flows through the outfall expressed as average annual daily flow [FS (9) (c)]

City of Hollywood Department of Public Utilities w-fn005 6 Nutrient Reduction [FS (9)(b)] ■Basic Nutrient Criterion – discharge to meet AWT as defined under FS (4) namely 5/5/3/1 and HLD by Dec. 31, 2018 ■Alternatives ●Equivalent reduction in TN &TP baseline loadings ●Equivalent cumulative reduction in TN & TP from to AWT levels between ●Fully operational 100% reuse by Dec. 31, 2018

City of Hollywood Department of Public Utilities w-fn005 7 Reuse Requirements [FS (9)(c)] ■Basic Reuse Criterion - Facilities discharging to ocean on 7/1/2008 must have functioning reuse system by 12/31/2025 ●A functioning reuse system means an environmentally, economically, and technically feasible system for ≥ 60% facility actual flow ■Alternatives ●Diversion of flow to other facilities counts toward the 60% if 100% is reused ●Diversion of 60% of combined outfall facilities for single utility

City of Hollywood Department of Public Utilities w-fn005 8 Planning Requirements [FS (9)(e)] ■Progress report and action item schedule by Dec. 31, 2009 ■Updated progress report and action item schedule every 5 yrs (2014, 2019, 2024) ■Detailed implementation plan to meet all requirements to be submitted by July 1, 2013 ■Updated plan by July 1, 2016 ■All outfall permits after July 1, 2008 will include an order with a compliance schedule

City of Hollywood Department of Public Utilities w-fn005 9 Baseline Establishment ■ SRWWTP Outfall Data ●Average Flow – 40.1 mgd ●Average TN Load – 5,293 lbs/day ► Concentration = 15.8 mg/L ●Average TP Load – 4,247 lbs/day ► Concentration = 1.3 mg/L

City of Hollywood Department of Public Utilities w-fn Nutrient Reduction ■Advanced Wastewater Treatment and Management Options ●Meet AWT Standards (5/5/3/1) ●TN and TP baseline load reduction equivalent to AWT standards (~ 7 mgd) ●Cumulative 2009–2025 TN and TP reduction equivalent to cumulative reduction through AWT between ●100% reuse by Dec. 31, 2018

City of Hollywood Department of Public Utilities w-fn AWT Compliance Approaches ■Nutrient Reduction Alternative 1 – Implement AWT ●Maximize use of existing injection wells (≥30 mgd to wells) ●AWT facilities for balance of flow (~30 mgd by 2025) ●Estimated cost >$300M

City of Hollywood Department of Public Utilities w-fn AWT Compliance Approaches ■Nutrient Reduction Alternative 2 – Cumulative reduction ●Maximize use of existing injection wells (≥30 mgd to wells) ●Construct additional injection well (IW-3) no later than 2016 ●HLD facilities required ●Estimated cost ≈$45M

City of Hollywood Department of Public Utilities w-fn AWT Compliance Approaches ■Nutrient Reduction Alternative 3 – 100% Reuse ●Construct necessary facilities by 2018 ■Maximum Reuse Alternative ●Salinity Barrier ●Canal Recharge ●Groundwater Recharge ●Dual distribution ■Estimated Capital Cost (60 mgd) >$1.5B

City of Hollywood Department of Public Utilities w-fn AWT Compliance Approaches ■Cumulative Reduction Recommended Strategy (IW-3) ●Lowest probable cost option ●Utilizes existing infrastructure ●Defers significant treatment plant modifications ●HLD facilities provide possible synergy w/ reuse strategy

City of Hollywood Department of Public Utilities w-fn Cumulative Reduction Strategies

City of Hollywood Department of Public Utilities w-fn Reuse Compliance Approaches ■Reuse Requirement – 60% of Baseline Outfall Flow by 2025 ~ 25 mgd ■Reuse Alternatives ●Canal Discharge ●Biscayne Aquifer Discharge ●Floridan Aquifer Discharge ●Dual Distribution System ●Large User Pull-Out

City of Hollywood Department of Public Utilities w-fn Canal Discharge ■Indirect Potable Reuse Option ■Considered an extension to Biscayne Aquifer (F.A.C (b)) ■FDEP - Principal Treatment & Disinfection ●HLD, TN ≤ 10 mg/L unless WQBELs est. ■BCEPD – TN ≤ 1.5 mg/L, TP ≤ 0.02 mg/L ●Membrane / LOT Treatment

City of Hollywood Department of Public Utilities w-fn Canal Discharge Regulatory Requirements BCEPDFDEP CBOD5 mg/l20 mg/L TSS--5 mg/l Ammonia (unionized)0.02 mg/l TN1.5 mg/l0-3 mg/l* TP0.02 mg/l0-1 mg/l* * WQBEL Limited

City of Hollywood Department of Public Utilities w-fn Canal Discharge – Issues ■Disposal Location? ■Eventual Disposal to Tide ●Direct Impact on Coral Reefs ●Problem Exacerbated

City of Hollywood Department of Public Utilities w-fn Biscayne Aquifer Discharge ■Indirect Potable Reuse Option ■Class G-I Ground Water (F.A.C ) ■FDEP - Full Treatment & Disinfection ●NPDW, NSDW Standards, HLD, TN ≤ 10 mg/L ■BCEPD – PO4-P ≤ 0.01 mg/L, COD ≤ 10 mg/L, Chlorides ≤ 250 mg/L ●Membrane / LOT Treatment

City of Hollywood Department of Public Utilities w-fn Biscayne Aquifer Discharge Regulatory Requirements BCEPDFDEP CBOD5 mg/l20 mg/L COD10 mg/L-- TSS5 mg/l NO 3 / NO 2 -N10 / 1 mg/L NO 3 + NO 2 -N10 mg/L-- TN--10 mg/l Phosphate0.01 mg/l-- TOC / TOX--3 / 0.2 mg/l Chlorides250 mg/L--

City of Hollywood Department of Public Utilities w-fn Canal / Biscayne Aquifer Discharge Treatment Alternatives ■New Treatment Train to Meet LOT ●MBR → RO → UV (AOP) ► Fine Screens, Primary Clarifiers ●BNR → UF → RO → UV (AOP) ●Utilize Existing Tankage? ■Secondary Effluent Side stream Process ●BAF → UF → RO → UV (AOP) ► BAF - Biological Aerated Filters ●Biscayne Aquifer - UF → RO → UV (AOP)

City of Hollywood Department of Public Utilities w-fn Reuse Alternatives 1 and 2 – Canal / Biscayne Aquifer Discharge

City of Hollywood Department of Public Utilities w-fn Floridan Aquifer Discharge ■Indirect Potable Reuse Option ■Class G-II Ground Water (F.A.C ) ●TDS > 3,000 mg/L below 1,100 feet ■FDEP – Primary Treatment & Disinfection + NPDW Standards ■BCEPD – No differentiation between Class G-I and G-II GW ●Assume COD, PO4 and Cl- limits can be waived – need to confirm

City of Hollywood Department of Public Utilities w-fn Floridan Aquifer Discharge Regulatory Requirements BCEPDFDEP CBOD5 mg/l20 mg/L COD10 mg/L-- TSS5 mg/l NO 3 / NO 2 -N10 / 1 mg/L NO 3 + NO 2 -N10 mg/L-- TN--10 mg/l Phosphate0.01 mg/l-- Chlorides250 mg/L--

City of Hollywood Department of Public Utilities w-fn Floridan Aquifer Discharge Treatment Alternatives ■New Treatment Train ●Diffused Air BNR → Filters → HLD ●MBR → HLD ► Fine Screens, Primary Clarifiers ■Utilize Existing Process? ●Optimize SRT ► Pure Oxygen - Partial nitrification ► Convert to Diffused Air – Full nitrification ●SCE → Denite Filters → HLD ■Side stream Process ●SCE → BAF → Filters → HLD

City of Hollywood Department of Public Utilities w-fn Reuse Alternative 3 – Floridan Aquifer Discharge

City of Hollywood Department of Public Utilities w-fn Expand Dual Distribution ■High Chloride Influent ●21.6 mgd ≈ 3,000 mg/l Cl- ■Low Chloride Influent ●41.5 mgd ≈ 150 mg/l Cl- ■Plus D/CC 6 mgd; NPW use at 4 mgd ■Separate Influent Streams and Treatment ■High Chloride to Deep Wells ■Low Chloride to Off-Site Reuse ■Peak Flow/Emergency Disposal to Outfall

City of Hollywood Department of Public Utilities w-fn Reuse Alternative 4 – Expand Dual Distribution System

City of Hollywood Department of Public Utilities w-fn Reuse Alternative 4 Dual Distribution of 25 mgd

City of Hollywood Department of Public Utilities w-fn Large User Pull-Out ■Hallandale Beach – 6.5 mgd AADF (2005) ●10.9 mgd AADF in 2025 ■Pembroke Pines – 7.5 mgd AADF (2005) ●8.4 mgd AADF in 2025 ■Combined 2025 Flow – 19.3 mgd ■100% Reuse Flow – Credit towards SRWWTP 60% Reuse Requirement ●5.7 MGD SRWWTP

City of Hollywood Department of Public Utilities w-fn Reuse Alternative 5 – Large User Pullout

City of Hollywood Department of Public Utilities w-fn Existing Condition (2007)

City of Hollywood Department of Public Utilities w-fn Year 2025 Condition

City of Hollywood Department of Public Utilities w-fn Estimated Reuse Alternative Costs Alternative 1 – Canal Recharge $ M Alternative 2 – Biscayne Recharge$ M Alternative 3 – Floridan Recharge$ M Alternative 4 – Dual Distribution$700M Alternative 5 – Large User Pull-Out$?

City of Hollywood Department of Public Utilities w-fn Compliance Schedule

City of Hollywood Department of Public Utilities w-fn Recharge Pilot Test Issues ■Define Regulatory Standards ●COD, chlorides, phosphate, toxicity, microconstituents, etc. ■Determine Limits of Technology ■Determine Design Criteria ●Pretreatment, Treatment, Post-treatment, mixing zones, etc. ●Injection modeling, flow rates, pressures, well spacing, fate, etc. ■Determine degree of recharge

City of Hollywood Department of Public Utilities w-fn Reuse/Recharge Pilot Test Budget * Regulatory Discussions/Pre-design $ M Design/Permitting $ M Pilot Test Construction & Operation$ M Total Project Cost $ M * Assumes 3-yr test period

w-fn Discussion

w-fn Davie and Cooper City Effluent Disposal Options

City of Hollywood Department of Public Utilities w-fn Background ■In 1985 agreement between Davie, Cooper City, and Hollywood reserved a total of 10.5-mgd outfall capacity. ●Davie: mgd ●Cooper City: mgd ■In 1992 effluent disposal agreement was amended to include the construction of a 4-mgd reuse system.

City of Hollywood Department of Public Utilities w-fn Highlights of 1992 Amendment ■This was an action that prevented a building moratorium in City’s served by the regional system. ■Allowed the expansion of the WWTP by reducing effluent discharge to the outfall via reuse. ■Ordered Davie and Cooper City to provide wastewater effluent to the regional system despite their objections. ■Provided Davie and Cooper City a total effluent disposal capacity of 14.5 mgd (4-mgd of reuse).

City of Hollywood Department of Public Utilities w-fn Davie Cooper City Effluent Disposal Options Option 1 Replace outfall capacity with new IW and HLD in the Regional System. ●Proportionally share the costs with the Large Users ●Continue sending 4-mgd of effluent to the plant. ●Wet weather discharge of reuse flows to IW system when necessary.

City of Hollywood Department of Public Utilities w-fn Davie Cooper City Effluent Disposal Options Option 2 Either Davie or Cooper City opt out of the outfall and build their own capacity for effluent disposal. ●Either Davie or Cooper City proportionally shares costs to build IW and HLD with Large Users. ●Continue sending 4-mgd of effluent to the plant. ●Wet weather discharge of reuse flows to IW system when necessary. ●Would require 100 percent reuse of diverted flow

City of Hollywood Department of Public Utilities w-fn Davie Cooper City Effluent Disposal Options Option 3 Both Davie and Cooper City opt out of outfall and build their own capacity for effluent disposal. ●Continue sending 4-mgd of effluent to the plant. ●Wet weather discharge of reuse flows to IW system when necessary. ●Would require 100 percent reuse of diverted flow

City of Hollywood Department of Public Utilities w-fn Recommended Action Plan – Initial Phase 1.Construct additional injection well capacity with HLD to meet nutrient reduction requirements. 2.Initiate Biscayne / Floridan aquifer recharge pilot project to assess treatability and regulatory issues with stakeholders. 3.Discuss effluent disposal options with Davie and Cooper City to determine their desired course of action. 4.Upon completion of pilot study, evaluate approach to meet 60-percent reuse requirement (2025).

City of Hollywood Department of Public Utilities w-fn Preliminary Analysis of Rate Requirements for Initial Phase (2018) Option A ■Construction of one (1) IW with HLD ■Biscayne / Floridan Aquifer recharge pilot study ■Preliminary rate estimate (1) : $2.50 – $2.70 per thousand gallon Option B ■Construction of two (2) IWs with HLD ■Biscayne /Floridan Aquifer recharge pilot study ■Preliminary rate estimate (1) : $2.70 – $2.90 per thousand gallon Notes: 1. Preliminary rate based on capital requirement and does not include O&M costs.

City of Hollywood Department of Public Utilities w-fn Where do we go from here… 1.Large Users to review recommended options. 2.Negotiations with Davie and Cooper City relative to options they wish to exercise. 3.Schedule a special Large User meeting to gather feedback and decide on recommended options. 4.Submit proposed plan of action to FDEP. 5.Draft amendment to Large User Agreement and Davie/Cooper City Effluent Disposal Agreement.

City of Hollywood Department of Public Utilities w-fn Questions