Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.

Slides:



Advertisements
Similar presentations
1 Case Study Case Study Watkins Creek Franklin, TN.
Advertisements

Session 3 Outline What is a Illicit Storm Water Discharge? - Potential Sources What is required by the permit? What should I have in place prior to getting.
CAERNARVON TOWNSHIP LANCASTER COUNTY June 17, 2013.
WASTEWATER MANAGEMENT. TABLE OF CONTENTS Wastewater Management Reuse Recycle Discharge and Treatment Publically Owned Treatment Works On-Site and Decentralized.
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
Fayette County Wastewater Management Plan October 6, 2005.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Presenter: Karen Fligger, US EPA. Decentralized Wastewater Treatment Managed onsite or cluster wastewater systems used to collect, treat, and disperse.
Princeton Wastewater Servicing Study
Exchange of practices and experience in developing national information systems on population’s connection to public water supply and to wastewater treatment.
Decentralised Wastewater Management
Water Resources Target Nitrogen loads will be achieved Flexibility for regional solutions Site constraints at Buck Island Site are adequately conditioned.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Wastewater Collection Options for Lakota Beach Area Sub-Basin Special Meeting June 27, 2001 John Bowman Lakehaven Utility District (253)
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
Bureau of Reclamation Mid-Pacific Region Regional Criteria for Evaluating Water Management Plans for the Sacramento River Contractors.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Feasibility Study of Constructed Wetlands for Wastewater Treatment and Wildlife Habitat Luna County, NM Public Meeting November 10, :00 am Presented.
Connecticut Department of Energy and Environmental Protection.
Do You Know Where Your Peak Flow Is?. - OR – Why Everyone Needs to Know About Blending Presented at BACWA Wet Weather Management Workshop May 28, 2008.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
04/12/04 Environmental Protection Agency/Lithuania OECD/Eurostat JQ Inland Waters Country presentation Lithuania Violeta Juozefaite.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
Comprehensive Wastewater Management Planning (CWMP) Project Update for East Falmouth Watersheds Board of Selectmen Progress Meeting October 22, 2007 Nathan.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
Rapid Assessment Process Project Strategic Plan City of Marfa Water and Wastewater System Improvements Marfa, Texas Presented to: Stakeholders and Project.
Assessment of on-site sewage disposal systems after severe flooding Steven R. Tidwell, E.I. U.S. Public Health Service APHT3 – Disaster Engineer Presentation.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle Constructed Wetland Design at Sipaulovi Village.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan January 11, 2006 Pio Lombardo, P.E Lombardo Associates, Inc.
Mayville Area Cooperative Planning Project August 29, 2006.
Status of Regional Water Supply Plan Updates John Mulliken Director, Planning Division Water Supply Department Water Resources Advisory Commission January.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
SEA in the Czech Republic Prague, 24 September 2008.
Canaan Valley Tucker County, West Virginia Decentralized Wastewater Management Facility Plan July 28, 2005 Pio Lombardo, P.E Lombardo Associates, Inc.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
Ledyard Wastewater Facilities Management Plan A Presentation to the Ledyard Town Council/ Water Pollution Control Authority By Maguire Group Inc. January.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Metropolitan Council Water Supply Planning in the Northwest Metro Water Availability Technical Focus Group : June 9, 2008 Lanya Ross Senior Environmental.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Short Design Report Terry Ring CH EN 5253 Process Design II.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
Lecturer: Lina Vladimirovna Zhornyak, Associate Professor.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
The Dane County Regional Hydrologic Study. Conceptualized groundwater flow system for Dane County Source: Bradbury and others, 1999.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Faecal Sludge Management (FSM)
EIA approval process, Management plan and Monitoring
City of Greeley Prepared for the Water Quality Control Commission
Fredonia, AZ Water Use Study:
Investigation of District Package Treatment Plants
Florida and Reclaimed Water
OVERVIEW & PROGRESS Presentation before the Sub Collector cum Sub Divisional Magistrate, Cuddalore.
DCS Solutions: Don Jackson Chen Kiat Yong Sarah Doyle
Article 41 Wastewater Planning Capacity Study
Gulf of Honduras Task Group 1 Process
ES&H for the LCLS Tess Byler, SLAC April 24, 2002
Gulf of Honduras Task Group 1 Process
Presentation by: Ajay Kumar KC Research Associate NDRI Lalitpur, Nepal
Presentation transcript:

Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop – August 27, 2007

Lunenburg CWMP 2 Project Management/Public Involvement Phase I -Existing Conditions (filed May 2007) Phase II -Alternatives Identification and Screening Phase III - Detailed Evaluation of Alternatives and Recommended Plan Phase IV – Report CWMP Phases

Lunenburg CWMP 3 Phase I CWMP Summary Existing conditions Water demand/supply sources  Lunenburg Water District Water balance  3 local sub basins of the Nashua River Wastewater needs assessment  11 Areas of Further Study

Lunenburg CWMP 4 Project Management/Public Involvement Phase I -Existing Conditions Phase II -Alternatives Identification and Screening Phase III - Detailed Evaluation of Alternatives and Recommended Plan Phase IV - Report CWMP Phases

Lunenburg CWMP 5 Phase II - Alternatives Identification and Screening Proposed Alternatives  Collection  Treatment  Effluent Disposal Review Criteria  Technical  Environmental  Institutional  Economic

Lunenburg CWMP 6 Review wastewater management alternatives Identify and short list potential wastewater treatment and effluent disposal sites Provide short list of treatment, collection and effluent disposal alternatives Phase II CWMP

Lunenburg CWMP 7 Draft Phase II report Section 1 – Introduction Section 2 - WW Management Alternatives Reviewed as Tech Memo #1 Section 3 - Potential Treatment/Disposal Site Locations Reviewed as Tech Memo #2 Section 4 - Short Listed Alternatives Section 5 – Assessment of Management Techniques Section 6 - Public Participation

Lunenburg CWMP 8 Technical Memorandum #2 Potential wastewater treatment and effluent disposal sites  To be used if a decentralized treatment process is part of the recommended plan Townwide search identified 23 potential sites Performed preliminary hydrogeological evaluation  Soils, depth to bedrock, and effluent disposal rates Short listed 9 sites by sub basin  Based on 11 technical and environmental factors

Lunenburg CWMP 9 Questions and Comments

Lunenburg CWMP 10 Individual on-site systems (Title 5) Innovative/Alternative (I/A) on-site systems  Jet System  Presby  FAST Private satellite systems  Village at Flat Hills  Woodlands Village Sewer connections – regional/centralized  Leominster  Fitchburg How is Lunenburg Wastewater Disposed of Now?

Lunenburg CWMP 11 Individual On-Site Title 5 Septic tank/leach field I/A On-Site Systems Types of Wastewater Systems

Lunenburg CWMP 12 Types of Wastewater Systems Satellite -- Defined service area, GWD permit Village at Flat Hill

Lunenburg CWMP 13 Types of Wastewater Systems Satellite -- Defined service area, GWD permit Woodlands Village

Lunenburg CWMP 14 Centralized - Traditional municipal facility Types of Wastewater Systems Fitchburg East WWTF

Lunenburg CWMP 15 Centralized - Traditional municipal facility Types of Wastewater Systems Leominster WWTF

Lunenburg CWMP 16 Population Projections 2005 Actual: 9, EOEA Projection 11,133 1,579 additional residents per EOEA projections Existing Planned Developments 956 planned units 3,555 existing units Basis for 2026 Projected Flows

Lunenburg CWMP 17 Centralized Systems  Publicly owned and operated Decentralized Systems  Individual on-site  Cluster  Satellite  Typically privately owned and operated Types of Wastewater Systems

Lunenburg CWMP 18 Off-site   Regional solutions   Centralized treatment   Satellite systems On-site   Cluster   Continued use of on-site systems –Title 5 –I/A Systems –Septage Management Plans Proposed Alternatives - Treatment