Water Resources Target Nitrogen loads will be achieved Flexibility for regional solutions Site constraints at Buck Island Site are adequately conditioned.

Slides:



Advertisements
Similar presentations
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
O Adopted in 1972, the CWA is known mostly to the public by its mandate for “swimmable and fishable” waterways. o With the CWA, states evaluate all of.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
Lunenburg CWMP Phase II – Management Techniques and Alternatives Identification and Screening Lunenburg Comprehensive Wastewater Management Plan Workshop.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Design and Implementation of Title 5 Systems and Small Package Treatment Plants Presented by: John B. McAllister, P.E. Norfolk Ram Group, LLC One Roberts.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Literature Search and Analysis to Identify Alternatives for Management of Groundwater Quality Impacted by High Density Septic System Developments Literature.
Bringing Hyundai to Montgomery MWWSSB’s Role as Part of the Economic Development Team Presented by: Thomas R. “Buddy” Morgan, General Manager Alabama Water.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Masterton: Waste-to-energy concepts. Oxidation ponds Background Ruamahanga River.
The Compact  Legally enforceable contract among the Great Lakes States  Provided for in the U.S. Constitution  Ratification by State legislatures 
National Urban Waste Water Study (Covers catchments with a population equivalent of 2,000 or more outside the Greater Dublin Area) Department of the Environment,
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 5: Design and Plan Review— Non-Conventional Systems.
Water System Planning Study
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
OUR URBAN WATER SUPPLY … THE PLAN FOR MEETING OUR FUTURE WATER SUPPLY NEEDS LAWRENCE C. TROPEA, JR., P.E.,DEE EXECUTIVE DIRECTOR RIVANNA WATER & SEWER.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Comprehensive Wastewater Management Planning (CWMP) Project Update for East Falmouth Watersheds Board of Selectmen Progress Meeting October 22, 2007 Nathan.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Waste Water Facilities Plan Update November 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP Public Hearing Presentation.
Pelican Group of Lakes Improvement District Public Hearing on Facilities Plan Agenda Introduction of PGOLID Board of DirectorsDale Haakenstad Introduction.
Integrated Constructed Wetlands Regulatory Aspects - the EPA’s role Aoife Loughnane Inspector, Environmental Licensing Programme Environmental Protection.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
EVALUATION AND APPRAISAL REPORT OVERVIEW, WORKPLAN & PUBLIC PARTICIPATION PLAN FOR ALACHUA COUNTY Energy Conservation Strategies Commission February 18,
Facilities Plan Update July 2, 2009 Palmer Engineering Company / Hazen & Sawyer / CDP.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
Orange County Board of County Commissioners Update on USEPA Rulemaking for Numeric Nutrient Criteria Utilities Department January 26, 2010 Utilities Department.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Nitrogen Problem Excessive nitrogen (N) from a variety of sources has led to decreases in the environmental quality of coastal rivers, ponds, and harbors.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Waterbody Classification Project A project of the Lakes and Watershed Commission, Dane County Department of Planning and Development, and the Dane County.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Reclaimed Water Solution for Disposal Capacity Village of Bald Head Island 2015 NC AWWA - WEA Annual Conference November 17, 2015.
Solving Water Pollution Problems in the Wakulla Springshed The City of Tallahassee’s Efforts to Reduce Stormwater Pollution Hydrogeology Workshop May 12-13,
Public Information Meeting Wastewater Treatment January 26, 2016.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
Using New Jersey’s State Revolving Fund to Reduce Combined Sewage Flooding in Camden City Andrew Kricun, P.E., BCEE Executive Director / Chief Engineer.
Request approval to proceed to EMC with 2014 Tar-Pamlico River Basin Plan.
Kevin Colvett, P.E. Nashville Corrective Action Plan and Engineering Report, Phase III for Metro Water Services and the City of Brentwood, TN Presentation.
Yarmouth’s Wastewater System Initiative Phase 1 Article 12 ATM 2008 $3.1 Million Design and permitting for Collection, Treatment and Disposal.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
The Dane County Regional Hydrologic Study. Conceptualized groundwater flow system for Dane County Source: Bradbury and others, 1999.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
EVALUATING WATERSHED MANAGEMENT PLANS NUTRIENT MANAGEMENT APPROACHES IN THE LAKE ERIE BASIN AND KEY LOCATIONS OUTSIDE OF THE LAKE ERIE WATERSHED Ohio Stormwater.
Update on PI Modeling and Nitrogen Removal at Blue Plains
David Kurz, P.E. Lead Wastewater Engineer
Orleans Citizens Forum Water Quality and Wastewater Planning October 2017 Special Town Meeting Warrant Articles October 12, 2017.
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Article 41 Wastewater Planning Capacity Study
Brackish Water Desalination Project
City of Janesville Wastewater Facility Plan Amendment Public Hearing
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
The Project Overview and Status Report
Presentation transcript:

Water Resources Target Nitrogen loads will be achieved Flexibility for regional solutions Site constraints at Buck Island Site are adequately conditioned Flow neutrality outside of economic growth areas is demonstrated

Yarmouth Major Watersheds

Phase ,000 Phase ,500 Phase 3 – 590,000 Phase 4 – 723,000 Phase 5 – 619,000 Total MGD

Regionalization Barnstable Potential sharing of treatment facilities Regional assessment of R8 Hospital Bogs site for effluent disposal Flexibility of Pump stations to accommodate future regional solutions

Regionalization Dennis MEP indicates nearly 100% of septic nitrogen load to upper-Bass River should be removed Mid-Bass River is less nitrogen sensitive Lower-Bass River appears to have more assimilative capacity Bass River will be addressed in subsequent wastewater Planning effort

Effluent Disposal Capacity Buck Island Site R1 Hydrogeologic Investigation and Groundwater Modeling Indicates 0.99 to 1.5 MGD of infiltration capacity Ave BOPeak Phase 1 318,000 gpd418,700 Phase 2 628,000 gpd812, MGD Phase MGD1.40 MGD1.8 MGD CWMP proposes decreasing 4 ft separation to increase infiltration capacity.

Parkers River Watershed

Effluent Disposal Buck Island Site R1 Nitrogen Constraint MEP indicates 1.93 MGD at 3 ppm is the nitrogen loading constraint for Parkers River when Culvert is completed CWMP Phase 1 and 2 will have lower flows with a limit of 7 ppm that operationally will approach 5 ppm. Phase 3 modifications are proposed to achieve a maximum of 5 with an average to approach 3 ppm. Additional Effluent Disposal Capacity will be required beyond Phase 3

Interbasin Transfer of Nitrogen Phase 1 as modified in the SEIR will have a no- net increase to the Greater Parkers River Seine Pond The MEP required septic nitrogen decrease for the Seine Pond Sub-watershed is 59% Seine Pond will receive 25% of effluent nitrogen for an additional 4kg/day at Phase 2 Suggest expediting sewering in Seine Pond subwatershed from Phase 4 to Phase 1 or 2.

Comprehensive Effluent Disposal Effluent Disposal sites in lower and mid Bass River and Nantucket Sound Watersheds have less constraints from nitrogen loading perspective. Additional Site investigation is required for future Phase and Bass River Planning effort

Sewer Service Alternatives Maximize use of R1 site for nitrogen removal Long Pond Groundwater flow and natural attenuation removes approximately 95% of the nitrogen Plashes Pond Natural attenuation should be considered Nantucket Sound No nitrogen limitation

Growth Controls Yarmouth will be seeking 0% SRF Loan which requires flow-neutral controls CWMP uses 16% for buildout + 5 % for additional economic development Commission is working with Town to re- evaluate buildout and buildout flows

Conclusion and Recommendations Single EIR is sufficiently detailed to complete MEPA/Joint Review processSingle EIR is sufficiently detailed to complete MEPA/Joint Review process Subcommittee vote to approve staff report as comment letter to MEPASubcommittee vote to approve staff report as comment letter to MEPA Vote to authorize the Subcommittee Chair to sign a cover letter transmitting the staff report to MEPA on behalf of the CommissionVote to authorize the Subcommittee Chair to sign a cover letter transmitting the staff report to MEPA on behalf of the Commission Comment period closes 8/19/11Comment period closes 8/19/11