SUNY ESF Workshop Shohreh Karimipour, P.E. Enhanced Phosphorus Removal Standards NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION.

Slides:



Advertisements
Similar presentations
Clean Water Its Everybodys Business. From a distance we might get the impression that our planet has an unlimited supply of clean water available to use.
Advertisements

NYSDEC Stormwater Permits TMDL Conditions and Retrofit Options
SMP Sizing in Redevelopment Projects Scenarios are countless Tools –Simple method –CN back calculation –Peak Discharge Rate Chapter 10 Criteria List of.
An Evaluation of BMP Removal Efficiency in the Kensico Reservoir Watershed New York City Department of Environmental Protection September 2008 Prepared.
Infiltration Trenches Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Post Construction Runoff Control & BMPs J. C. Hayes, Ph.D., P.E. & D. Hitchcock, Ph.D. South Carolina Stormwater Forum May 8, 2007 Columbia, SC.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
LID Site Design and Drainage Dan Cloak Environmental Consulting May 23, 2011.
Pond and Wetland BMPs, Retrofitting Detention Basins.
Chapter 10 Design Examples
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Karst Initiatives/Storm Water Management in Berkeley County Brian Hopkins, Ph.D., P.E. Berkeley County Engineering Department.
Stormwater Management Planning & Design Mike Novotney, P.E. (MD) Center for Watershed Protection Dave Briglio, P.E. MACTEC.
Introduction To The Highway Runoff Manual This introduction focus on: An overview of the Highway Runoff Manual. The definition of Minimum Requirements.
Adapting Stormwater Management to Climate Change Ken Potter Department of Civil & Environmental Engineering University of Wisconsin-Madison.
INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR INLAND EMPIRE ASCE & APWA LOW IMPACT DEVELOPMENT (LID) SEMINAR LID FACILITY DESIGN Prepared.
Low Impact Development Overview  Alternative to end of pipe approach to SWM  Maintain hydrologic function of local ecosystem  Treat stormwater close.
NYS Department of Environmental Conservation Design Manual Updates August, 2010.
Low Impact Development Best Management Practices
 Development replaces permeable desert with impermeable roofs and pavement  Increases peak and total stormwater discharge  Classical approach: large.
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006.
Better Site Design Sustainability & Stormwater
Coastal Smart Growth s/index.htmhttp:// s/index.htm
UVM-AWRA CHARRETTE: designing an alternative stormwater treatment technique W h a t I s a C h a r r e t t e? A Charrette is a cross-disciplinary workshop.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
Things that Happened Before You were Born (The earth and SWMM were created) a story by Dr. Larry A. Roesner, Ph.D.,P.E. based (loosely*) on biblical quotes.
Sustainable Development: Practical Solutions to Real World Problems Fishkill, NY November 7, 2012 Low Impact Development and Rainwater Harvesting Solutions.
Bernie Engel Purdue University. Low-Impact Development (LID) An approach to land development to mimic the pre-development site hydrology to: 1)Reduce.
SUSTAIN Pilot Study April 25, 2012 Curtis DeGasperi King County
Horsley Witten Group, Inc. Rhode Island Stormwater Design and Installation Standards Manual Public Workshop Design Elements for BMPs January 19, 2011.
Bioretention Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
STEP 3: SITING AND SIZING STORM WATER CONTROLS Section 6.
Vegetated Filters Dave Briglio, P.E. MACTEC Mike Novotney Center for Watershed Protection.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
VOLUME CONTROL using Inter-Event Dry Periods by Marty Wanielista, Josh Spence, and Ewoud Hulstein Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Introduction to Storm Water Phase II Pennsylvania Department of Environmental Protection.
Urban Storm Drain Design: Pump Station Design. Purposes To lift stormwater to higher elevation when discharge of local collection system lies below regional.
Urban Stormwater Retrofit Friendship Park – Winchester, VA K. Choi, K. Davis, and D. Laird Biological Systems Engineering, Virginia Tech Introduction Exposed.
Why are we here today? To discuss the challenges we face in meeting NPDES Phase II minimum requirements for stormwater control. The NPDES program requires.
Bernie Engel, Larry Theller, James Hunter Purdue University.
Created by The North Carolina School of Science and Math.The North Carolina School of Science and Math Copyright North Carolina Department of Public.
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA.
Stormwater Water Quality Treatment Options Alvin Shoblom, P.E. Hydraulics Engineer.
Term Project Presentation CE 394K.2 Hydrology Presented by Chelsea Cohen Thursday, April 24, 2008.
Horsley Witten Group, Inc. Stormwater Management and Elements of Low Impact Development Protecting Our Water Resources – An Ecological Approach to Land.
Low impact development strategies and techniques jennifer j. bitting, pe the low impact development center, inc. june 2008.
Effective Post-Construction Stormwater Management Mike Novotney, P.E. (MD) Center for Watershed Protection Ronald Feldner, P.E. Ecological Solutions, Inc.
STORMWATER MANAGEMENT
Green Infrastructure Techniques Runoff Reduction by Area Conservation of natural areas Conservation of natural areas Vegetated buffer, filter strip and.
STORM WATER STORAGE AND TREATMENT
Presented by David C. Nyman, P.E. Comprehensive Environmental Inc. Annual Nonpoint Source Conference April 29, 2014.
Gar Creek in Huntersville LID Requirements in Mecklenburg County What Is The Goal? Why Is It Necessary? Where Is It Required? How Does It Work?
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski.
City of Clarksville Storm Water Management Manual Revisions 2014.
MIDS Calculator Fundamentals
Modeling Low Impact Development Techniques and Detention Basins in SWMM CEE 6/5460 David Rosenberg.
Supervisor, RIDEM RIPDES Permitting Program
L-THIA Online and LID in a watershed investigation
L-THIA Online and LID Larry Theller
Storm Water Storage and Treatment
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
MIDS calculator Quantifies reductions in runoff volume for a given BMP or group of BMPs Quantifies reductions in phosphorus (P) and TSS runoff for a given.
Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) November 18, 2018 Jay Dorsey.
Kickoff example Create a new file
Intro MIDS Calculator Use
Presentation transcript:

SUNY ESF Workshop Shohreh Karimipour, P.E. Enhanced Phosphorus Removal Standards NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION

Purpose To develop an effective and technically defensible criteria to address stormwater design standards in phosphorus-limited watersheds –EOH NYC Water Supplies Watersheds –Greenwood Lake –Onondaga Lake A supplement to the Existing New York State Stormwater Management Design Manual for enhanced phosphorus control –Provide consistency with NYCDEP watershed rules – Enhanced Criteria consistent with the current State standards

Overview Existing Stormwater Design Standards –New York State –Watershed Rules Enhanced Standards (Supplement) – Defining Enhanced Phosphorus Removal – Overview of Development Process – Recommendations Design Standards – Sizing Criteria – Performance Criteria

Marcus Quigley, P.E. Project Manager Eric Strecker, Principal-In-Charge GeoSyntec Consultants Robert Pitt, Senior Technical Specialist and Technical Review NYS DEC, Project Management Technical Advisory Group (TAG) NYCDEP NYSSWCC NYSOAG River Keepers (CEA) Insite Engineering The Project Team University of Alabama

Design Standards NYS Requirements Sizing Criteria – Capture & treatment 90% Design Storm – Channel protection and flood controls Performance Criteria – Removal Efficiency: 80% TSS 40% phosphorus – Standard management practices – Design Specifications Can capture and treat the full water quality volume Provide pretreatment Have acceptable longevity in the field

Features of Standard Systems Examples: Embankment Specifications Principal/Emergency Spillway Inlet Protection Adequate Outfall Protection Sediment Forebay Media specifications Adequate WQv Multiple Treatment Pathways Minimum Geometry Pond Benches Pondscaping Plan Wetland Elements Pond Buffers / Setbacks Non-clogging Orifice Riser in Embankment Adjustable Gate Valve Safety Features Maintenance Responsibility Maintenance Access Maintenance Schedule

Watershed Rules The Croton Watershed –Sizing Criteria Detention of 2-yr., 24-hr. storm TR-55 calculation method Pollutant load analysis 2-yr, 10-yr, 25-yr, 100-yr peak control –Performance Criteria infiltration, retention, detention Onondaga Lake Greenwood Lake

Defining Enhanced Performance Criteria How much stormwater is prevented? –Hydrologic Source Control –Evapotranspiration –Infiltration How much of the remaining stormwater is treated? –Hydraulic function –Capture and treatment –Bypass What is the effluent quality of the treated runoff? –Effluent quality of the discharge –Seasonal Performance Criteria

Phosphorus and Treatability Particulate vs. dissolved forms Particulate size or settling velocities International BMP Database Research by Pitt, et al. (Wisconsin) P association with particles < 10 µm 51,90063,10078,8006,6402,16017,2006,400 Average mgP/kgSS µm 1-2 µm 2-10 µm µm µm µm >250 µm Particle size

Sizing analysis as a function of Treatment volume Detention time Permanent pool Particle settling theory – Continuous simulation SWMM modeling 44 yr hourly data (Carmel) 120 Model runs –Event simulation by HydroCAD® Detention time Seven scenarios (WQv) Permanent Pool Extended Detention outlet Channel Prot. outlet Overbank outlet Outlet riser Defining Enhanced Methodology

Continuous Simulation Analyses Performed to Ascertain Performance Hydrologic Processes SWMM Representation runoff precipitation evapotranspiration infiltration BMP Development area Precipitation (hourly) Surface runoff hydrograph ET Infiltration GW recharge ET Impervious areas (runoff block) Precipitation (hourly) Stormwater runoff hydrograph BMP (Storage treatment block) Outflow hydrograph (to receiving waters) Pervious areas (runoff block) Disconnected runoff Base flows (not considered for Burgundy Rose) Hydrologic Processes SWMM Representation runoff precipitation evapotranspiration infiltration BMP Development area runoff precipitation evapotranspiration infiltration BMP Development area Precipitation (hourly) Surface runoff hydrograph ET Infiltration GW recharge ET Impervious areas (runoff block) Precipitation (hourly) Stormwater runoff hydrograph BMP (Storage treatment block) Outflow hydrograph (to receiving waters) Pervious areas (runoff block) Disconnected runoff Base flows (not considered for Burgundy Rose) Precipitation (hourly) Surface runoff hydrograph ET Infiltration GW recharge ET Impervious areas (runoff block) Precipitation (hourly) Stormwater runoff hydrograph BMP (Storage treatment block) Outflow hydrograph (to receiving waters) Pervious areas (runoff block) Disconnected runoff Base flows (not considered for Burgundy Rose)

Current design standard (WQv = 1.35 ac-ft) 1-year 24-hour (WQv = 5.33 ac-ft) 2-year 24-hour (WQv = 8.08 ac-ft) Wet Extended Detention Pond (Particulate Phosphorous Treatment)

Extended Detention Pond Impervious Pervious

Infiltration Systems Impervious Pervious

1 year-24 hour Sizing Method estimated to achieve > 80% treatment for both storage and flow through systems. Decreasing marginal gain in treatment performance as WQv size increases Results in –Alternative that modifies WQv sizing –Use of TR-55/TR-20 methods –Incorporate physical characteristics of the site Recommendation

Performance Goals: source control Goal 1 - Reduce runoff volumes to the maximum extent practicable –Hydrologic Source Control –Evapotranspiration –Infiltration Infiltration Requirement –Infiltration credit –Incorporate soil in sizing –Site evaluation Percentage of Impervious area routed through BSD Hydrologic Soil Group % Impervious area A30% B20% C10% D 5%

Performance Goals: source control Evaluation Requirements –Imp. area disconnection –Standard Infiltration –Better Site Design – Low Impact Development – Green infrastructure –Sustainable Ecosystem

Better Site Design Preserve undisturbed areas Conservation Design An approach to development design that seeks to:

Better Site Design Reduce impervious cover  Roads  Parking lots  Driveways An approach to development design that seeks to:

Better Site Design Use pervious areas for stormwater treatment An approach to development design that seeks to:

Performance Goals: source control Post Construction –Increased Curve Number –Soil Decompaction Deep Ripping Decompaction Resources

Goal 2 - Achieve less than 15% effective treatment bypass of the long term runoff volume. –Focus on hydraulic control –Capture and treatment –Bypass Simulated hydraulic function in SWMM Applied design in TR-55, TR-20 Performance Goals: sizing criteria

Sizing Criteria Sizing Criteria for Enhanced Phosphorus Removal Water Quality (WQ v ) WQ v = estimated runoff volume (acre-feet) resulting from the 1-year, 24-hour design storm over the post development watershed Evaluate and implement hydrologic source control where feasible Quantity Controls (Cpv, Q p, Q f ) Refer to existing requirements

Application Precipitation Data –Source of Isographs of Design Storms TP-40 North East Climate Center Atlas of Precipitation Extremes –Storm distribution Examples –Storage –Flow through –BSD

Good Drainage Paradigm Conventional Site Design Collect Concentrate Convey Centralized Control Credit: HWG Rain Garden Treatment Train Approach Bioretention Cell Storm Drain System Bioretention Cell Flow Path Grass Swale Grass Filter Strip Credit: HWG

Quantity Controls Channel Protection –24 hour detention of 1 year, 24 hr storm Integrated in extended detention systems Need additional storage in flow through systems. Flood Control –10 & 100 year control not exceeding pre construction peak discharge.

Goal 3 – median effluent concentration of particulate phosphorus shall be at or below 0.1 mg/L Goal 4 - median effluent concentration of dissolved phosphorus shall be at or below 0.06 mg/L –Effluent quality of the discharge –International Stormwater BMP Database –Research by Pitt, et al. (NSWQ Database) ms4/Paper/Mainms4paper.html Performance Goals: performance criteria

Performance Specifications: design details not specified in this section shall, at minimum, meet spec. in Chapter 6 –Practice options –Design geometry –media specification –optimum vegetative cover –Maintenance

Summary An effective and technically defensible criteria to address stormwater design standards in P-limited watersheds consistent with NYCDEP requirements –1 year-24 hour Sizing Method estimated to achieve > 80% treatment for both storage and flow through systems. –Effluent concentration criteria –Hydrologic source control Better Site Design Infiltration requirement –Improved design specifications –TR-55 calculation method –Update precipitation values

Questions? Shohreh Karimipour, P.E. (518)