Dual Use of Ocean Outfall Pipeline Tertiary Effluent Delivery to Two Golf Courses Using Existing Secondary Effluent Pipeline Presented by Dana K. Ripley.

Slides:



Advertisements
Similar presentations
Active Water Resource Management in the Lower Rio Grande TOOLS FOR A NEW ERA IN WATER MANAGEMENT presented by Peggy Barroll, Hydrologist New Mexico Office.
Advertisements

Paving a Path to Potable Reuse Flexible Treatment for To Be Determined Regulations Michael Watts, PhD, PE Water Technology Leader Garver.
WelcomeWelcome BURT PROCESS EQUIPMENT “Harvesting The Rain” Rainwater Reclamation.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
IBM Smarter Cities Challenge City of Tucson Award Recipient for 2013 November 14, 2012.
A Review of State-of-the-Practice Equipment at the Plum Creek WWTP By Tim Grotheer Plum Creek Wastewater Authority & Dave Oerke RTW Professional Engineers.
1 CouncilUpdateJan702pet104i ppt ELLIS CREEK WATER RECYCLING FACILITY, PETALUMA, CA North Bay Watershed Association December 7, 2007.
New Approaches to Developing Local Limits Industrial & Hazardous Waste Committee Meeting July 18, 2001 by Richard W. von Langen, P.E. New Approaches to.
Reclaimed Water–A Sustainable Source for Florida’s Growing Water Needs Larry R. Parsons, Ph.D. Citrus Research & Education Center Lake Alfred Liz Felter.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
California Water Issues and Wetlands
1 Chlorine Contact Time / Virus & Giardia Log Removal Credit Calculations The EPA Guidance Manual on the Surface water Treatment Rule and Disinfection.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Drought and the Central Valley Project August 2014.
Presented by Ralf Topper, CPG 30 th Colorado Water Workshop July 28, 2005.
United Water & Sanitation District Stonegate Village Metro District Water Supply Opportunities 1.
Age of Potable Water Impacts on DBP’s and Disinfection Residuals.
Eric Hansen, P.E. Capital Planning Program CPUC Recycled Water Order Instituting Rulemaking (R ) San Francisco January 20, 2012 Workshop 3: Understanding.
Michael Tamblin, P.E., BCEE Stearns & Wheler, LLC Protecting and Enhancing the Ramapo Watershed – A Designated Sole Source Aquifer Supplying New York and.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
Water Conservation and Recycling Needs Title XVI Success Stories Water Conservation and Recycling Roundtable April 8, 2010 Sacramento, CA.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
Biological Aerated Filtration (BAF) at the Denver Water Recycling Plant 2006 Water Reuse Workshop Golden, CO Russell Plakke, Denver Water.
Hydrostatic Testing Draft General Permit Draft Permit Stakeholder Outreach Meeting April 23, 2015 Moderated by: Lillian Gonzalez, Unit Manager, Permits.
Cottonwood Water & Sanitation DistrictSeptember 2002 Arber Indirect Potable Reuse at Cottonwood Water and Sanitation District Rick Arber, Ben Johnson Richard.
Chapter 21: How We Obtain and Use Water. Water To understand water, we must understand its characteristics, and roles: –Water has a high capacity to absorb.
City of Wichita Falls Emergency Direct Potable Reuse RESPONDING TO THE 2011 – 2014 DROUGHT.
LCWDBoardMtg_ pptx/1 LCWD Board Meeting January 14, Carneros Avenue, Napa Los Carneros Water District.
Water Resources 101 TOOLS Water Management:. Water Resources 101 Water Sources Groundwater Surface Water Effluent.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Drought Response Jessica Bean, Engineering Geologist State Water Resources Control Board August 28, 2015.
Preparing Water Managers for Drought and Climate Change in the Southwest Katharine Jacobs Executive Director Arizona Water Institute USGS Congressional.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
1 Update Ocean Desalination Feasibility Studies Karl Seckel Assistant General Manager.
Wastewater Reuse Oregon State University GEO 300 November 3, 2004 Russell Harding Department of Environmental Quality Water Quality Division (503)
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
 Oklahoma Department of Environmental Quality Water Quality Division.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Reclaimed Water Solution for Disposal Capacity Village of Bald Head Island 2015 NC AWWA - WEA Annual Conference November 17, 2015.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Stephanie Lyn Koehne Amec Foster Wheeler Environment & Infrastructure, Americas (Amec Foster Wheeler) Phoenix-Goodyear Airport- North (PGA-North) Superfund.
3 Councillors Greater Taree 3 Councillors Great Lakes MidCoast Water General Manager Design And Construction Strategic Planning OperationsCorporate.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
Water Reclamation Plant Feasibility Study Update July 23, 2014.
Town of Davie Utilities Department Renuka M. Bajnath John McGeary.
Miami-Dade Water & Sewer Department Miami-Dade Water and Sewer Department |  1   Reuse, Every Drop Has Value Seminar FPL JPA.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
Recycled Water Project Basis of Design Report
PLANNED POTABLE REUSE: URBAN WATER INSTITUTE’S SPRING WATER CONFERENCE
Department of Water Management Water Supply Update
Recycled Water Project – Sharon Heights GCC
Policy Principles for the Allocation of Recycled Water
Sample Site Plans.
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Zone 7 And WaterFix March 7, 2018
Big Sky Wastewater Facility Plan Update
Wastewater Facilities Upgrade Project
October 29, 2018 Terry Lauritsen, P.E.
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
Big Sky Wastewater Facility Plan Update
County Water Resources Programs in the Santa Margarita Basin
Brackish Water Desalination Project Draft EIR
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
Is the Bay Area Ready for Potable Reuse?
Presentation transcript:

Dual Use of Ocean Outfall Pipeline Tertiary Effluent Delivery to Two Golf Courses Using Existing Secondary Effluent Pipeline Presented by Dana K. Ripley and Bahman Sheikh at the 28 th Annual WateReuse Symposium Denver, CO September 16, 2013

Overview l Santa Cruz County Water Supply Background l Scotts Valley Water Recycling System l Scotts Valley 8-mile Ocean Outfall l Pasatiempo Golf Course l Santa Cruz potable water customer since 1929 l “Dual Use” Concept – Secondary and Tertiary Effluent in Single Pipe l Consultation with California Department of Public Health l Pipeline Disinfection Process l CDPH Engineering Report, Review and Final Approval l Current Project Status

Santa Cruz, CA Water Supply Issues l Water Supply Shortage during Drought Conditions: the City could experience a 45% shortfall in water supply during a drought event similar to the one experienced in l Endangered Species Preservation and Habitat Conservation: Since Santa Cruz is predominantly reliant on surface water, future water availability is subject to reduction due to regulatory requirements in place to protect fish. l Water Rights: The City has two water rights applications pending that could potentially affect reservoir operations. Denial of the water rights petitions would result in reduction of surface water supply. l Groundwater Overdraft: An increased demand for ground- water throughout the basin has created overdraft conditions. Source: SCWD 2, December 2010

Drought Curtailment Allocations Source: City of Santa Cruz 2010 Urban Water Management Plan

Santa Cruz County Water Suppliers Source: Kennedy/Jenks Consultants, 2009

Scotts Valley Ocean Outfall Base image and profile: Google Earth, May 2012 imagery Scotts Valley WWTP Pasatiempo Golf Course Santa Cruz/ Scotts Valley joint outfall Santa Cruz WWTP North

Dual Use Concept l Scotts Valley WWTP needs to discharge >1 mgd in winter. l Outfall rated at 4 mgd, but tertiary filter and UV disinfection system rated at 1 mgd. l Dry weather flow in summer less than 0.8 mgd. l Outfall pipe will convey secondary effluent in winter for ocean discharge, and tertiary effluent in summer months for reuse. l Disinfection protocol will be required each spring to convert from secondary to tertiary. l Initiated by Pasatiempo Golf Club, but others may include Valley Garden Golf Course and Santa Cruz Memorial Cemetery. l Dual use of pipeline eliminates need for either on-site tertiary treatment or single purpose dedicated tertiary pipeline. l Cost savings in the range of $5 to $10 million.

2012 SV WWTP Recycle and Discharge

Pasatiempo Golf Club Water Conservation

Pasatiempo Golf Club Turf Reduction March 2007 May 2012

Underground Effluent Storage Source: DN Tanks, Inc. Similar 1.1 MG Circumferentially Pre- stressed Concrete Tank Fully Buried Under Construction

Effluent Storage Fully Buried Source: DN Tanks, Inc. Similar 1.1 MG Pre-stressed Concrete Tank Fully Buried located at Lone Tree Golf Course in Antioch, CA

Why Go to Dual Use? l Options: n New Tertiary Plant--$4-7 Million n New 3-Mile Pipeline--$5 Million n Use Existing Outfall--$0.3 Million l Stubbed-Out Turnouts Available l Turnouts Plumbed to Private Property in Two locations in 1980 l Designed for Plug ‘n Play Connections to On-Site Storage Tank l No Conflict with Ongoing Ops

Annual Cycle of Dual Use: Discharge and Reuse JanFebMarAprMayJunJulAugSepOctNovDec Disinfected Secondary Effluent to Ocean Discharge Disinfected Tertiary Recycled Water Conveyance to Pasatiempo Golf Course Disinfected Secondary Effluent to Ocean Discharge Transition from 2 nd to 3 ry Transition from 3 ry to 2 nd

Consultation with CDPH l Title 22 n Water Quality Criteria at End-of-Treatment Train l Criteria Not Applicable to Transmission Line l However, In the Spirit of Title-22 n Consultation with CDPH n Prepared Engineering Report u Flush or Disinfect the Pipeline u Monitor at End-of-Pipe u Transition Period—Restricted-Access Irrigation, at Night

Transition from Discharge to Reuse l March-April Timeframe l Seasonal Flushing n If Proven Sufficient n Based on Total Coliform at End of Pipe l Seasonal Disinfection n If Necessary

Profile of 12” Outfall to Pasatiempo

Flushing l Fill the Pipe, Remove All Air l Slowly Flush Two Pipe Volumes l Store Flush Water in Storage Tank l Sample for Total Coliform l Decide if Disinfection Is Necessary l Irrigate with Sored Water n Restricted Access--Temporarily

Disinfection Process (If Necessary) l Fill Pipe, Remove All Air l Disinfect with Chlorine or Paracetic Acid (PAA) l 2 Hours Disinfectant Contact l Flush, Keep Flush Water in Storage l Test for Total Coliform l Repeat if Necessary

Consultation with CDPH l Engineering Report l Three Drafts, Each Responding to CDPH Comments l Acceptance Letter from CDPH to RWQCB on 10/11/12 n Signage Plan Required prior to Delivery of Recycled Water

Why Paracetic Acid? l PAA Advantages Over Chlorine n Easy to Work with n Effective at Low Concentrations n Effective / Stable in Biofilm n Industry Standard for Disinfection of Metal Surfaces n No Liquid Hypochlorite Salts (eg. Sodium) n De-Chlorination Unnecessary l PAA Approved in November 10, 2012 by CDPH Acceptance Letter

Future Plans l Engineering Study in Progress n On-site WWTP Replumbing for Tertiary Effluent to Outfall Pump Station n Pressure Reduction Valve in Outfall Pipe n Full Pipe in Downhill Segment of Outfall Pipe for Disinfection l Agreements Among Stakeholders Including Scotts Valley Water District, City of Scotts Valley, and Pasatiempo l Potential Additional Users of Recycled Water Along Outfall Pipe l First Water Recycling Project for Santa Cruz l Likely More Recycling to Follow as Alternative to Desalinization