T ROOPER W. S MITH, P.E. F REESE AND N ICHOLS, I NC. 10814 J OLLYVILLE R D., B LDG 4, S UITE 100 A USTIN, TX 78759 MINIMIZE YOUR FOOTPRINT AND YOUR MAINTENANCE.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Treatment of Slaughterhouse Wastewater
Anne Arundel County Department of Public Works
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Wastewater Treatment City of London. What is Wastewater? Water used in our communities and businesses leaves as wastewater to be treated and returned.
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
An-Najah National University Civil Engineering Department
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Energy Efficient Design Low Cost State Loan Low-Impact Construction Novato Sanitary District Wastewater Facilities Upgrade Presenter: Beverly James, Manager-Engineer.
An Energy Producing Resource Recovery Plant Concept © Copyright 2011, All Rights Reserved, Filtration Dynamics, Inc. Energy from Wastewater.
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Design of W.W. Collection System
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Surface Water Treatment Plant
Nutrient Management Planner Certification Program Planner Certification Training Dr. Mark Risse Biological and Agricultural Engineering Agricultural Pollution.
Improvement of the Capacity of Drinking Water Treatment Plant in East Quantara (Case Study) Dr. Eng. Ibrahim Khaled El-Sayed Chairman 1North & South Sinai.
Wastewater Treatment & Collection System Improvements.
Muskegon Wastewater Treatment Facility
Wastewater Treatment Plants & Bacteria: Strategies for Compliance Chlorine Contact Chambers; Chlorine Mixing and Contact Time for Ct Harris County Wastewater.
SETTLING TANKS.
Water and Wastewater Treatment Processes Crystal Penton, E.I. Will Larsen, E.I.
Willamette Water Treatment Plant
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Sanitary Engineering Lecture 16
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
WESTERN CARY WATER STORAGE TANK Town of Cary Preliminary Engineering Report Progress Meeting June 8, 2015.
ATTACHMENT C Photographic Report. Photo 1 - Influent Pipe to Wastewater Treatment Plant Photo 3 - Influent Flume for Flow Metering Photo 2 - Chart Recorder.
1 I. Water Supply Networks and Facilities Topic I.4. River Water Intakes: Kinds and Structures Water Intake Kinds General classification: I. According.
1 III. Water Treatment Technologies Topic III. 7. Water Stability. General Arrangement of Water Treatment Plant Water Stability §Stability index (Index.
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
THE HYDROFLOW STAR FILTER
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
Lecture 23 Site Selection. Layout and Design of Grain Storage Systems  Two general (guiding) principles:  closed loop - deliver or receive grain from.
1 II. Sewer Networks and Facilities Topic. II. 12. Detention (Retention) Basins: Kinds and Structures. Sewerage Pumping Stations Detention Basins: Kinds.
Waste Water Treatment Plant. HOW DO TREATMENT PLANTS PROTECT OUR WATER? Wastewater treatment plants: Remove solids, everything from rags and plastics.
OMSAP Public Meeting September 1999 Update on the Boston Harbor Project n In 1999, the $3.7 billion construction project is nearly complete, occupying.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
HYDRO POWER PLANT
Christopher Hill December 6, 2006 CE 679
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
Solving Significant Surge and Water Hammer in a Large Wastewater Lift Station at Fort Bragg, North Carolina November 16, 2015 Randall L. Foulke, PE, BCEE,
November 17, 2015 NC AWWA-WEA Annual conference
Persevering to Get What You Need Mark Estes HCSA Executive Director Scott Ehrhardt P.E, George Anipsitakis PhD P.E, HCSA Maple Ave Regional WWTP Expansion.
December 10, 2009 TOWN OF PALM BEACH WATER COMMITTEE Discussion of Water Plant Options.
CE 356 Fundamental of Environmental Engineering
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
CTC 450 Review WW Collection Systems Types of pipes Installation.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
Town of Enfield : Upgrading the Water Pollution Control Facility & Collection System Jay Sheehan, PE Michael Burns, PE.
Presented By : SONU DEEP ELECTRICAL ENGINEERING.
Electrical energy is a very convenient form of energy and it can be easily Converted into other forms. To meet the ever increasing use of electric power.
Welcome to American-Bath Wastewater Treatment Plant.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
WASTEWATER.
WATER – WASTEWATER TREATMENT EXPERIENCE
Lecture Objectives: Learn about thermal storage systems
IN TAKE WELL.
Manchester’s CSO Program: A Look Behind and a Look Ahead
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
What is an on-lot sewage system?
Maintenance of the On-Lot Sewage System
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Class III Estimate for Regional Consolidation
A Tale of Two Plants: How Combining WWTP and WTP Improvements in Reidsville is Setting the Stage for the Future Kevin Irby, P.E. Kevin Eason, P.E
Southwest Section AWWA 2018 – Baton Rouge, LA
Change Order 5, Contract S03003D01 Engineering Services for SSWRF Post-Secondary Capacity Improvements and Restore ED’s Original Delegated Authority.
Presentation transcript:

T ROOPER W. S MITH, P.E. F REESE AND N ICHOLS, I NC J OLLYVILLE R D., B LDG 4, S UITE 100 A USTIN, TX MINIMIZE YOUR FOOTPRINT AND YOUR MAINTENANCE HEADACHES SELF CLEANING TRENCH TYPE WET WELL DESIGNS

PRESENTATION OBJECTIVES Story Time - Pump Station 13B Introduction to Trench Type Wet Wells Introduction to Self Cleaning Operation Would the design be right for you?

Trinity River Authority – CRWS Treatment Plant Design and Construction of Pump Station 13B Fluid of Interest: Return Activated Sludge – Final Clarifiers – Traveling Bridge Suction Clarifiers – Thin Sludge Firm Capacity – 200 MGD for WWTP – Downrated PS-13 – 50 MGD (North Plant, Trains 1-3) – New PS-13B – 50 MGD (North Plant, Trains 4-6) – Uprated PS-13A – 100 MGD (South Plant, Trains 7-12) PROJECT SCOPE

13A 13 13B

FEASABILITY REPORT PRELIMINARY DESIGN REPORT FINAL DESIGN CONSTRUCTION PHASE HISTORY OF THE PROJECT YEAR 2005 YEAR 2006 YEAR 2007 YEAR 2007 TO 2009

1. Presentation Objectives2. Project Background3. Pump Station Evaluation4. Trench Type Wet Well5. Construction Photos6. Acknowledgements/Questions TOPIC

Dry-Pit/Wet-Pit – Horizontal Non-Clog Centrifugal Pumps (PS-13 and PS-13A) – Vertical Non-Clog Centrifugal Pumps (PS-6 and PS-6A) Wet-Pit – Vertical Turbine Solids Handling Pumps (VTSH) PUMP STATION EVALUATION

Vertical Non-Clog Centrifugal Pumps (PS-6 and 6A) Pump Station 13A Horizontal Non-Clog Centrifugal Pump (PS-13A)

VTSH PUMPS

City of Phoenix, 23 rd Ave. WWTP (36-inch VTSH Pumps)

60-inch Final Clarifier Effluent Line 84-inch Primary Clarifier Effluent Line Electrical Duct Bank Caustic Soda Tank 2-inch to 12-inch Lines 12-foot Roadway LIMITATIONS AT PS-13B SITE Existing Structures and Utilities

DRY PIT VERSUS WET PIT Relocated 84-inch PCE Line Relocated Caustic Soda Building Relocated Pavement Relocated 60-inch FCE Line Footprint of Dry-Pit/Wet-Pit (Horizontal Non-Clog Pumps)

Existing Caustic Soda Storage Facility, 84-inch PCE Line, 60-inch FCE Line and Pavement Remains Unchanged Footprint of Wet-Pit Wet Well (VTSH Pumps)

Pump Station Type Length/WidthDepthPump Cost ($)*OPCC ($)** Horizontal Non- Clog Centrifugal Pump Station (Wet Pit/Dry Pit) 67’/65’26’’$915,000$10.9 million Vertical Non-Clog Centrifugal Pump Station (Wet Pit/Dry Pit) 59’/54’~ 35’$945,000$11.4 million VTSH Pump Station (Wet Pit) 49’/43’29’$1,718,000$9.5 million DRY PIT VS. WET PIT * Total Pump Cost for 3 Pumps ** OPCC: Opinion of Probable Construction Cost

1. Presentation Objectives2. Project Background3. Pump Station Evaluation4. Trench Type Wet Well5. Construction Photos6. Acknowledgements/Questions TOPIC

TRENCH TYPE WET WELL Illustrative View of Kirkland Pump Station (Washington) Invented by D.H. Caldwell in 1964 Improved by Dr. Robert Sanks, Ph.D., P.E. – 1:1 scale model of portion of trench floor Result: >5 fps requirement – 1:3.3 scale model of the Kirkland Pump Center Result: Only a small portion of the sand was ejected at pump down equilibrium Breakthrough – 2 nd Edition of Pumping Station Design – ANSI/HI 9.8 Pump Intake Design

ANSI/HI 9.8 Pump Intake Design (1998)

ANSI/HI 9.8 Pump Intake Design (2012)

Suitable for Design Flows > 3 MGD Pump Intakes, Confined in a Deep, Narrow Ditch Pump Intakes, Substantially Lower Than Upstream Inlet Pipe TRENCH TYPE WET WELL

Suitable for Different Pump Types/Arrangements – Wet Pit or Dry Pit/Wet Pit – Pumps VTSH Submersible Non-Clog Centrifugal Suitable for Different Fluids – Clean Water – Activated Sludge – Raw Wastewater TRENCH TYPE WET WELL Dallas Water Utilities Central WWTP Influent Pump Station (335MGD initial capacity, 425MGD ultimate capacity)

Advantages – Superb Hydraulic Environment for Pump Intakes – Minimum Footprint Size – Small Floor Area (Minimum accumulation of sludge or grit) – Ease and Quickness of Cleaning – Reduced Disposal of Materials Disadvantages – Compact, Minimal Storage Capacity – Increased Depth – Clogging if Pumps Not Used TRENCH TYPE WET WELL

Pump Station Type Length/WidthDepthPump Cost ($)*Cost ($) Wet-Pit Pump Station 49’/43’29’$1,718,000**$9.5 million Trench Type Wet Well Pump Station 57’/18’38’$1,718,000~$8.5 million WET PIT VS. TRENCH TYPE * Total Pump Cost for 3 Pumps ** OPCC: Opinion of Probable Construction Cost

Site Plan – RAS Pump Station 13B

Wet Well Plan Elevation at ’ Wet Well TrenchFlow Splitter

SECTION VIEWS Flow Splitter Trench Water Guide Fillet Sloping Walls

SECTION VIEWS

4 fps (wet pit) 3 fps (dry pit) 1 fps max above trench Illustrative Section of Pump Station 13B – Normal Operation

SELF CLEANING CYCLE Mixes sludge and scum into a mass that is ejected by the last pump. Cleaning Ramp Trench Hydraulic Jump Pump Down 30-60% Flow Components

Illustrative Section of Pump Station 13B – Cleaning Cycle (Pump Down) Cleaning Ramp

Illustrative Section of Pump Station 13B – Cleaning Cycle (Pump Down)

Cleaning Ramp Illustrative Section of Pump Station 13B – Cleaning Cycle (Pump Down)

Cleaning Ramp Illustrative Section of Pump Station 13B – Cleaning Cycle (Pump Down)

1. Presentation Objectives2. Project Background3. Pump Station Evaluation4. Trench Type Wet Well5. Construction Photos6. Acknowledgements/Questions TOPIC

CONSTRUCTION PHOTOS

1. Presentation Objectives2. Project Background3. Pump Station Evaluation4. Trench Type Wet Well5. Construction Photos6. Acknowledgements/Questions TOPIC

Trinity River Authority of Texas ANSI/HI (Hydraulic Institute) Pump Standards, 1998/2012 Pumping Station Design, 3 rd Edition – Editor-in-Chief: Garr M. Jones, P.E. – Co-Editors: Dr. Robert L. Sanks, Ph.D., P.E. Dr. George Tchobanoglouos, Ph.D., P.E. Bayand E. Bosserman II, P.E. Dr. Robert L. Sanks, Ph.D., P.E. (Quality Control) Dr. Joel E. Cahoon, Ph.D., P.E., Montana State University ACKNOWLEDGEMENTS

Contact Information Trooper Smith CLOSING REMARKS / QUESTIONS Is this the right design for you? – Limited on Space? – Solids/grit problem? – Tired of maintenance intensive cleaning? – Don’t prefer dry-pit/wet-pit? Pre-Design Evaluation – Cost Analysis (Life Cycle) – Benefits Analysis – Reference Calls – Site Visits

PUMP STATION 13B TESTING 1 clarifier 16 MGD Sluice gate for proper flow rate Use last pump 2-3 clarifiers MGD 2 pumps at full speed, let turbulence do the cleaning 2-3 clarifiers MGD Sluice gate for proper flow rate Use last pump Scenario 1 Scenario 2A Scenario 2B