Stormwater Management Regulatory Update April 27 | 2010 Idaho Transportation Department Project Development Conference Presented by: Steve Burgos, Brown.

Slides:



Advertisements
Similar presentations
Alaska Association of Harbormasters and Port Administrators Wrangell, Alaska October 26, 2010 Shane Serrano ADEC.
Advertisements

SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
What are TMDLs? and What Might They Mean to MS4 Permittees?
Buffers and Special Water Quality Protections
1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
BEFORE AFTER. New Effluent Limitation Guidelines On November 28th, 2008, the EPA issued a proposed regulation which strengthened the existing National.
Pollutant Trading Discussion 22 July Why Allow Trading? §To make point sources pay §To lure nonpoint sources into doing pollution control so we.
Water Quality Trading Claire Schary Water Quality Trading Coordinator U.S. Environmental Protection Agency, Region 10, Seattle, WA Region 10, Seattle,
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Nebraska Department of Environmental Quality TMDLs 101 An Explanation of the Federal Clean Water Act’s TMDL Requirements and How they Impact Carter Lake.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Env 247 Overview of Stormwater Management March 1, 2011.
STORMWATER PERMITTING UNRAVELED NCMA Water Quality Workshop Feb 19, 2015, Raleigh, NC Bethany Georgoulias, Stormwater Permitting Program.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Total Maximum Daily Loads in MS4 Storm Water Programs.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
Water Quality Reduction Trading Program Draft Rule Language Policy Forum January 29,
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Construction Site Best Management Practices and the Project Design Process.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
MS4 Remand Rule Intergovernmental Associations Briefing September 15, 2015.
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Preparing for Regulatory Change WATER RESOURCES WORKSHOP February 20, 2004 Donald J. Brady, Ph.D.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
Suzanne Trevena EPA Water Protection Division Chair Milestone Workgroup December 4,
Deliberative, Pre-decisional – Do Not Quote, Cite or Distribute 1 Chesapeake Bay Water Quality Trading.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Storm Water Permitting Commission on the Future of Virginia’s Environment August 27, 2001 Department of Environmental Quality.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
San Rafael, California November 12, 2015
Overview of the Total Maximum Daily Load Program.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Maryland’s Nutrient Trading Program How Trading Works John Rhoderick Maryland Department of Agriculture.
City of Clarksville Storm Water Management Manual Revisions 2014.
Anticipated Changes to Oklahoma’s Multi-Sector Industrial Permit for Stormwater Discharges (OKR05)
Stormwater Pollution Prevention Program Compliance
NH MS4 Stormwater Permit -- Guidance for NHDES related provisions
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
John Tinger U.S. EPA Region IX
So I have a TMDL Wasteload Allocation
TPDES Construction General Permit Compliance
Clean Water Act/NPDES Regulatory Updates
Stormwater Construction General Pemit (CGP) TXR150000
Presentation transcript:

Stormwater Management Regulatory Update April 27 | 2010 Idaho Transportation Department Project Development Conference Presented by: Steve Burgos, Brown and Caldwell

ITD PROJECT DEVELOPMENT CONFERENCE Regulatory Updates: New Proposed Construction General Permit: Sneak Preview EPA Guidance on Stormwater and TMDLs MS4 Permits and Impacts of New Guidance ITD’s Initiatives to Address New Requirements Questions Agenda 2

ITD PROJECT DEVELOPMENT CONFERENCE Refresher: Federal Permits for Stormwater Pollution Control Clean Water Act National Pollutant Discharge Elimination System (NPDES) Construction General Permit (CGP) ConstructionIndustrial Multi-Sector General Permit (MSGP) Municipal Municipal Separate Storm Sewer Systems (MS4) Storm Water Management

ITD PROJECT DEVELOPMENT CONFERENCE Proposed CGP is Here! 4 Released April 15, day comment period Final CGP by January 31, 2012 Current CGP is scheduled to expire on June 30, 2011 EPA is proposing extension to current permit through January 31, 2012

ITD PROJECT DEVELOPMENT CONFERENCE Required use of electronic Notice of Intent process; Sediment and erosion controls; Natural buffers or alternative controls; Soil stabilization; Pollution prevention; Site inspections; and Permit termination Proposed CGP Contains New Requirements for: 5 Generally, the proposed permit is more prescriptive and refines requirements to specific values and/or expectations

ITD PROJECT DEVELOPMENT CONFERENCE EPA proposes to increase “waiting period” from 7 days to 30 days for “new sources” New 30-day timeframe accommodates endangered species and historic properties-related reviews Authorization Process / NOIs 6 EPA proposes to maximize use of electronic NOI Potentially requiring operators seek coverage using eNOI system

ITD PROJECT DEVELOPMENT CONFERENCE Buffers – “Operators must ensure that, if any waters of the U.S. are located on or immediately adjacent to the site, any discharges flowing through the area between the disturbed portion of the site and the waters of the United States are treated by an area of undisturbed natural vegetation that alone or with alternative sediment and erosion controls achieves a reduction in sediment loads equivalent to a 50 foot buffer.” Sediment and Erosion Controls Requirements 7

ITD PROJECT DEVELOPMENT CONFERENCE Installation of Controls Prior to Construction: Operators must install and make operational all sediment and erosion controls prior to conducting earth-disturbing activities in any portion of the site, with certain exceptions Sediment and Erosion Control Requirements 8 Entrance and Exit Points: Any entrance and exit points created on the site must be stabilized for a minimum of 50 feet into the site

ITD PROJECT DEVELOPMENT CONFERENCE Permit includes modified stabilization requirements that define more specifically what EPA expects for temporary and final stabilization Criteria are proposed for both vegetative and non-vegetative stabilization Based on the Revised Universal Soil Loss Equation’s (RUSLE) cover management factor, or “C-factor” (erosion control effectiveness) Vegetative: C < 0.05 Non vegetative: C 15% Appendix H provides common C-Factors for specific BMPs Stabilization Requirements 9

ITD PROJECT DEVELOPMENT CONFERENCE Permit includes specific requirements and design standards Install secondary containment or cover activities Inspect all construction vehicles once per week Plastic covering for exposed construction materials Pollution Prevention 10

ITD PROJECT DEVELOPMENT CONFERENCE Numeric Effluent Limits Original proposal: Beginning 8/1/11, effluent limit of 280 NTU will apply to discharges from sites disturbing 20+ acres Beginning 2/2/14, effluent limit of 280 NTU will apply to discharges from sites disturbing 10+ acres

ITD PROJECT DEVELOPMENT CONFERENCE Why are NELs being delayed? National Association of Home Builders (NAHB) filed a challenge to proposed NELs Contested legality of a numeric limit Reminder: Stormwater NPDES Permits typically require management to “Maximum Extent Practicable”

ITD PROJECT DEVELOPMENT CONFERENCE Current Status on NELs After considering issues raised by NAHB EPA filed motion asking Court to vacate numeric limit Remand that portion of the rules back to EPA for reconsideration "Based on EPA's examination of the dataset underlying the 280-NTU limit it adopted, the Agency has concluded that it improperly interpreted the data and, as a result, the calculations in the existing administrative record are no longer adequate to support the 280-NTU effluent limit. EPA therefore wishes to re-examine that number through a narrowly-tailored notice-and- comment rulemaking and, if necessary, revise that portion of the limit before proceeding with its defense of the rule."

ITD PROJECT DEVELOPMENT CONFERENCE Only included as placeholder NEL’s not Included in Proposed CGP 14

ITD PROJECT DEVELOPMENT CONFERENCE For sites discharging to waters impaired for common pollutants associated with construction activities, such as sediment and nutrients Tighter stabilization deadlines (immediately initiate stabilization if construction in an area is inactive for 7 days, as opposed to 14 days) More frequent site inspections (once per week, daily visual inspections) For sites disturbing 10 or more acres at a time, conduct benchmark monitoring of discharge based on receiving water’s water quality criterion Permit also proposes to include additional requirements for waters designated as Tier 2, Tier 2.5, or Tier 3 waters Water Quality-Based Effluent Limits 15

ITD PROJECT DEVELOPMENT CONFERENCE On Friday April 15, IDEQ submitted final Antidegradation Rule Package to EPA for review and approval The Antidegradation Implementation Procedures require three tiers of review for new or expanded NPDES permits Tier I waters (about 2/3 of the permitted discharges statewide) will require review to ensure compliance with water quality standards. Tier II waters (about 1/3 of the permitted discharges statewide), a social and economic analysis justifying the new or expanded discharge. Tier III waters, currently no waters in the state, are not allowed increases from new or existing sources. The final rule can be viewed at: Idaho Anti-Degradation Rule Update 16

ITD PROJECT DEVELOPMENT CONFERENCE If site inspection occurs during discharge-generating rain event EPA proposes to require operators visually assess quality of discharge Inspect for color, odor, floating, settled, or suspended solids Site Inspections 17

ITD PROJECT DEVELOPMENT CONFERENCE Current permit requires corrective action Proposed permit includes specific triggering conditions for corrective action as well as deadlines to fix such problems and document what was done Initiate work to fix the problem immediately after discovery and complete such work by close of next full work day If new BMPs required, 7 day window to install Corrective Actions 18

ITD PROJECT DEVELOPMENT CONFERENCE EPA proposes to include additional requirements that affect when a site may terminate coverage Removal of all temporary stormwater controls Removal of all construction materials, waste, and waste handling devices Notice of Termination 19

ITD PROJECT DEVELOPMENT CONFERENCE Proposed CGP: Questions? Brown and Caldwell 20

EPA Guidance on Stormwater and TMDLs 21

ITD PROJECT DEVELOPMENT CONFERENCE Update to 2002 guidance Four major revisions: 1.Numeric water quality based effluent limitations in stormwater NPDES permits 2.Disaggregating stormwater sources in a WLA 3.Using surrogates to establish TMDL loading capacity 4.Treating load allocations as wasteload allocations 11/12/10 EPA Guidance on Stormwater

ITD PROJECT DEVELOPMENT CONFERENCE Reminder: Clean Water Act Objective “Restore and Maintain the Chemical, Physical, and Biological Integrity of the Nations Waters”

ITD PROJECT DEVELOPMENT CONFERENCE Reminder: TMDLs Focused on Achieving Clean Water Act Goals Instream Criteria TMDLs NPDES Limits Other Control Strategies For example: Offsets, BMPs Use Classification Clean Water Act Goal: “Restore and Maintain the Chemical, Physical, and Biological Integrity of the Nations Waters” (d) Listing (if impairment) 3

ITD PROJECT DEVELOPMENT CONFERENCE Create “objective and accountable means for managing stormwater” Future permits will be written with numeric limits for impairments Most likely tied to TMDL and wasteload allocations assigned to stormwater discharges 1. Numeric Water Quality Based Effluent Limitations in Stormwater NPDES Permits... So What? 25 NOTE: If under an NPDES permit, stormwater is considered a ‘point source’

ITD PROJECT DEVELOPMENT CONFERENCE Traditionally, stormwater given aggregate WLA in TMDLs met through BMPs managed to the ‘Maximum Extent Practicable’ In future, stormwater will be divided into separate sources much like wastewater NPDES permits are assigned to specific WWTP: E.g., ITD District X will be given a stormwater WLA E.g., City of Boise will be given a stormwater WLA Etc. Key question: If point source WWTP are facing stringent limits, what about stormwater? 2. Disaggregating Stormwater Sources in a WLA... So What? 26

ITD PROJECT DEVELOPMENT CONFERENCE 3. Using Surrogates to Establish TMDL Loading Capacity... So What? 27 Often, there is not enough stormwater data to establish relevant wasteload allocations for stormwater sources New TMDLs are using surrogates in lieu of actual water quality data

ITD PROJECT DEVELOPMENT CONFERENCE For stormwater discharges not currently regulated under NPDES Load allocation assigned should include language that the load allocation will transition to a wasteload allocation once the discharge is permitted EX: For TMDLs where MS4 permits are pending (Twin Falls, Moscow, others) 4.Treating Load Allocations as Wasteload Allocations... So what? 28

ITD PROJECT DEVELOPMENT CONFERENCE Example: Lower Boise River TMDL

ITD PROJECT DEVELOPMENT CONFERENCE Lower Boise River TMDL Boise River Pollutant Issues Impairments Bacteria Sediment Temperature Nutrients Mercury Sources Treated wastewater Stormwater Agriculture

ITD PROJECT DEVELOPMENT CONFERENCE Impacts on Treasure Valley MS4 Permittees As TMDL revised, WLA for stormwater is likely for key pollutants MS4s impacted ITD District 3 (Ada and Canyon Co.) ACHD City of Boise City of Nampa City of Caldwell City of Middleton Nampa Highway District Others Boise Nampa-Caldwell Pocatello Idaho Falls Lewiston Coeur D’Alene MS4 Urbanized Areas In Idaho

ITD PROJECT DEVELOPMENT CONFERENCE Stormwater Management Guide Standardized policies and procedures for CGP, MSGP, and MS4 compliance Revised standard erosion and sediment control drawings awings.htm awings.htm ITD SWPPP Template Designer Stormwater Training Revised and updated BMP Manual Coming in 2011 ITD Initiatives to Address Coming Changes 32

Stormwater Management Regulatory Update April 27 | 2010 Idaho Transportation Department Project Development Conference Presented by: Steve Burgos, Brown and Caldwell