Coles Point Wastewater Treatment Plant

Slides:



Advertisements
Similar presentations
Welcome to Shawnee #2 Wastewater Treatment Plant.
Advertisements

The Barton Springs Part of the Edwards Aquifer: Basic physical and hydrologic characteristics pertinent to permitted discharges Raymond Slade, Jr, Certified.
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Anne Arundel County Department of Public Works
Sustainable Management of Scarce Resources in the Coastal Zone SMART ICA3 – Kick-off Meeting CEDARE, Cairo, 5-6 January, 2003 Case Study Jordan.
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
This presentation is an abbreviated version of the original PowerPoint presentation of June 23, This version was presented at the Commissioners’
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Harris County Onsite Wastewater Reuse Program John Blount, P.E. Director of Planning & Operations.
Septage Bioreactor Landfill
1 Bexar County Water Control and Improvement District # 10 Richard Frenzel General Manager.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
District of Columbia Stormwater Fees October 27, 2008 Apartment and Office Building Association of Metropolitan Washington Brendan Shane DDOE Office of.
The Metropolitan District Clean Water Project Update Connecticut Watershed Network Conference May 11, 2012.
Timeline of Key Milestones and Dates DateKey Milestone February 2007Washtenaw County Drain Commissioner’s Office authorizes a project to identify opportunities.
City of Farmersville, Texas Water and Wastewater Rate Study February 2011.
CUMBERLAND COUNTY BOARD OF COMMISSIONERS April 19, 2010 Presented by: Tom Cooney – Director, Cumberland County Public Utilities Department 1.
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
Cascade Charter Township
3rd Annual Harris County On-site Wastewater Seminar
City of Kimball Stormwater Re-use Project Protecting our Water Resources – a Forum Series for Policy Makers March 30, 2011.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Reclaimed Water–A Sustainable Source for Florida’s Growing Water Needs Larry R. Parsons, Ph.D. Citrus Research & Education Center Lake Alfred Liz Felter.
Land Application Wastewater Systems Provides 2 o Treatment (Biological) Used in combination with pretreatment and primary treatment Often called Natural.
THE BOROUGH OF HIGHTSTOWN ENVIRONMENTAL COMMISSION STORM WATER MANAGEMENT DEMONSTRATION AT THE HIGHTSTOWN HOUSING AUTHORITY.
Failing Septic Systems: Problems and Solutions Protect Our Waters 2003 Legislative Session Minnesota Center for Environmental Advocacy Minnesota Environmental.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
Agricultural Water Rights Workshop "Accessing different water sources" Steve Hirschey and Susan Kaufman-Una, King County November 2, 2010.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
Animal Agriculture and Water Resources in Texas Ned Meister Director of Commodity and Regulatory Activities Texas Farm Bureau Steel Maloney Principal Hydrologist.
Groundwater and Surface Water in a Watershed
Manure Recycling ACP Compost Solutions Workshop February 28, 2007 John Gundlach Manager of Organics Management Inland Empire Utilities Agency.
FreshwaterJeopardy $100 $200 $300 $400 $500 $100$100$100 $200 $300 $400 $500 Freshwater Systems and Resources How We Use Water Quantity of Freshwater Freshwater.
Sediment & Nutrient Management in the L’Anguille River Watershed St. Francis County Cost Share Project Patricia Perry St. Francis County Conservation.
Portland Drinking Water. Bull RunBull Run--Source primary drinking water supply for Portland Located 26 miles from downtown Portland in Sandy River basin,
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
Rivanna Water & Sewer Authority Community Water Supply Mitigation Plan Public Meeting November 2, 2006.
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Investing In Our Future. Statement from Mayor Tom Murphy “The Gillette Regional Water Supply Project is essential for quality of life and economic development.
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
1 NORTH VALLEY REGIONAL WATER AND WASTEWATER PROJECTS MEETING OF THE NEW MEXICO-TEXAS WATER COMMISSION May 19, 2005.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
Oregon Natural Treatment Systems for Wastewater Natural Treatment Systems – A Water Quality Match for Oregon’s Cities and Towns June, 2014 Oregon Department.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
Susan Sylvester Department Director Operations Control Department Mechanics of the Primary Water Management System.
Welcome Bexar County WCID #10 Informational Meeting.
Wastewater Treatment Principles and Regulation. What is Wastewater? Sewage released by residences, businesses and industry Contains liquid and solid components.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
May 18, 2004 City Bond Election. MAY 2004 BOND ELECTION General Election May 18, 2004 Elections City Mayoral Election City Council Election City Bond.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
MWRA WATER SOURCE TOWN MEETING OCTOBER 05, :30 PM NR HIGH SCHOOL PERFORMING ART CENTER.
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Human Impacts Part 2- Watersheds. What’s a Watershed? An area of land that drains into a common body of water.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
City of Farmersville Wastewater Project January 26, 2016 Kimley-Horn and Associates, Inc.
Infrastructure Discussion 1 Mark A. Harral and Raul Rodriquez April 19 th, 2016.
Project Schedule Final SWIM Plans GEBF Funding Request
Reuse “the action of using something again”
Town of Melbourne Beach
By: Lucas Hendrickson, Ian Strasburg, John Koets, and Shenquan Li
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
River Flow into Chesapeake Bay
IMPACT ON WATER March 14, 2018 Andrea G. Green
Georgia Agricultural Metering Program
Wastewater Facilities Upgrade Project
Big Sky Wastewater Facility Plan Update
Presentation transcript:

Coles Point Wastewater Treatment Plant Presentation to Potomac River Basin Commission Friday, October 8, 2010

Master Sewer Plan Westmoreland County Board of Supervisors approved a Master Sewer Plan for Westmoreland circa 1996. Over 70% of our soils are not conducive to conventional septic systems.

Project Study Areas Westmoreland County BOS submitted six (6) projects to RUS for construction. The BOS was asked to prioritize due to limited funds.

Coles Point Study Area Coles Point area was selected as the 2nd priority project. As you saw from the previous aerial view, the creeks and Potomac River created a need for an option other than a point discharge, due to shellfish waters and excessive cost to run a discharge line to the waters of the Potomac River.

Therefore, we elected to construct a spray irrigation system to serve the areas identified in the Master Sewer Plan. The County purchased 137 acres located in Coles Point.

Project Cost Coles Point funded by RUS for an approximate cost of $6,000,000. The funding breakdown was approximately 74% grant and 26% low-interest loan.

Wastewater Treatment Plant The physical plant is a Sequencing Batch Reactor (SBR) permitted at 150,000 gpd. It is capable of being expanded for increased demand as required. The plant was initially constructed with two 3.2 million gallon steel storage tanks (a third was just completed this year with stimulus funding.) This provides us the capacity to hold 180 days of treated effluent.

Wastewater Treatment Plant Our primary spray period is March thru October when we can spray an inch per day and up to 2 inches per week per field. 228,000 gpd or 456,000 gpw During the winter months, we can spray ½ inch per day or 1 inch per week, if the ground is not frozen or snow covered.

Spray Irrigation Fields Our spray irrigation fields total 50 acres with a 200-ft. buffer surrounding them. The fields are planted with Reed Canary Grass that provides a deep root structure and significant nutrient uptake from the effluent. (Although we have had to use commercial fertilizer due to inadequate nutrient levels for the grass.)

Spray Irrigation Fields We are required under our Nutrient Management Plan to add gypsum to the soils in the spring to decrease the sodium effect from the residents’ well-water, which has a hardening effect on the soils. We generally generate 200 round bales of hay annually.

Spray Irrigation Fields The irrigation system is designed for the application of effluent at levels not to exceed the limits established in the permit. During the installation of the additional storage tank, we added an additional line to the spray irrigation fields to allow us to spray two (2) fields simultaneously. This has permitted us to reduce overtime and maximize the discharge of effluent at peak time periods.

Project Outcome We serve 670 EDU’s in the Coles Point area. Prior to the installation of public sewer, the area was prone to condemned shellfish waters, primarily due to failing septic systems and the subsequent runoff into the river and its tributaries. These conditions have been significantly improved in Coles Point.

What have we learned? We have learned a great deal about improving this operation over the past six years. We’ve added mixers to our storage tanks to reduce wait time for chlorination residual to reach permitted level. The addition of the 2nd force main from the storage to spray fields has helped our operations. Getting DEQ to allow us to use rain gauges to denote 1 inch volume rather than meter readings has greatly improved the farming operation.

What have we learned? We can provide a weather forecast almost as well as the weather channel since it is critical to our operation. We are generating increased revenues from our farming operation which help towards the O & M expenses. Running a spray irrigation system requires a lot more diligence than a traditional discharge system. The weather creates the need for us to predicate our schedules around peak spraying periods. Hurricanes are our worst nightmare. Isabel created a situation where we could not spray during peak periods for three (3) months.

Conclusion We believe the final product of this process enhances the environmental impact upon adjacent waters and recharges the water aquifers. As I have told a number of visitors throughout the country who have come to see this operation, it requires a lot of skills beyond the traditional plant operations. It is at times very frustrating in dealing with regulatory bodies who do not fully appreciate the problems of these type of operations, and dealing with the many adverse weather related problems.