MT Department of Environmental Quality (DEQ) Water Protection Bureau February 12, 2014 Christine Weaver.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

NDEQ Industrial Storm Water General Discharge Permit Presentation for: Nebraska Aviation Symposium January 27, 2011 By: Bill Imig, Environmental Scientist.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
NPDES NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM What SC private landowners should know before applying forestry pesticides Presented By: Joey Ferguson,
Certification of Compliance By Evita Lagard
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
EPA Vessel General Permit Washington Department of Ecology Randall Marshall or
Public Health Pesticides and the Clean Water Act: Current Status Joseph M Conlon Technical Advisor.
PGP Scenario #2 You are automatically covered. You do not have to submit a NOI.
Understanding the NJ Fertilizer Law for Turf Applications Jim Murphy Extension Specialist in Turfgrass Management.
Nov Private Pesticide Applicator Certification.
1 Private Pesticide Applicator Certification Joe Educator Extension Office Any County Mary Weedperson Any County Weed & Pest Mark A. Ferrell Extension.
Your Name A + G or J Your Company’s Name MN PIE – City Your Legal Signature Today’s date All.
What is NPDES? “National Pollutant Discharge Elimination System”
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
NPDES Pesticide General Permit NPDES Pesticide General Permit In October 2012, the DOH issued a NPDES General Permit to authorize point source discharges.
Structural Pesticide Ordinance Development In A Tribal Community Presented At The 17th Annual Region 9 Tribal EPA Conference October 21-23, 2009 Barry.
WNV Pesticide Regulations Brian Rowe Pesticide Section Manager Michigan Department of Agriculture.
PGP Scenario #4 You are not qualified for PGP coverage. You may need an Individual NPDES Permit.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Form I-9 Process An Online Training for Supervisors and Designees Presented by Human Resources Revised November 2009.
NPDES Primer for Executive Officers of Wastewater Facilities Indiana Department of Environmental Management Office of Water Quality Compliance Branch.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
Montana Pesticide Education & Safety Program (MT PESP) mtpesticides.org.
1 CITY OF LOS ANGELES BIOSOLIDS MANAGEMENT PROGRAM IN KERN COUNTY, CALIFORNIA LEA/CIWMB ANNUAL CONFERENCE AUGUST 1-3, 2006 MONTEREY, CA Diane Gilbert Jones.
Concentrated Animal Feeding Operation (CAFO) Regulations - Update Meg Collins Colorado Livestock Association & Landon Gates Colorado Farm Bureau Water.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
National Pollutant Discharge Elimination System (NPDES) NPDES in effect on November 1, 2011 Presentation by : Tom Janousek, Pest Consulting Services, Omaha,
PGP Scenario #3 You are not automatically covered. You must submit a NOI.
PGP Scenario #1 PGP Does Not Apply to You. Will you be applying a pesticide to a State water or will the pesticide get into a State water during its.
 Why are we here?  Without regulations, rivers used to catch fire. Rules and Regulation.
Under what common law theories can polluters be held liable? Under what common law theories can polluters be held liable? What is an environmental impact.
 Nuisance.  Person liable if they use their property in a manner that unreasonably interferes with others’ rights to use or enjoy their own property.
© 2013 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Board of County Commissioners PUBLIC HEARING June 8, 2010.
Presentation to the HELLENIC MEDITERRANEAN PANEL HELLENIC MEDITERRANEAN PANEL (Athens, Greece - 23 October 2008)On US DISCHARGE STANDARDS -The NPDES Program-
Inspection Directions: An EMS Approach to Inspecting for Section 608 and 609 Compliance.
Proposed Rule for Preventive Controls for Animal Food.
Proposed Rule: 21 CFR 507 Proposed Rule for Preventive Controls for Animal Food 1.
Board of County Commissioners PUBLIC HEARING June 29, 2010.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
NPDES Permit Application and Annual Fees NPDES Permits NPDES Permits are issued for the discharge of municipal, industrial, or commercial (non- storm.
Dick Wiechman, EPA region 7 Nebraska Project Officer Tribal Pesticide Program Manager.
1 1 Poultry Slaughter Exemptions Under the Federal Poultry Products Inspection Act and the SC Poultry Products Inspection Law SC Poultry Products Inspection.
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
Applicator Training April 2011 Elise Doucette. Legal Decisions 2008 The Nat’l Cotton Council of Am, et al. v. EPA. As a result, a NPDES permit is required.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Private Applicator Training Understanding Pesticide Law Theresa Schrum Plant Science Specialist, District 2 Montana Department of Agriculture.
P ESTICIDE NPDES P ERMIT – D O Y OU N EED O NE ? Darin LeCrone & Leslie Lowry Illinois Environmental Protection Agency.
30 Texas Administrative Code Chapter 210, Subchapter E Presented by Kara Denney September 23, 2015.
California Healthy Schools Act
Stormwater Pollution Prevention Program Compliance
Chesapeake Bay Program
National Environmental Policy Act of 1969
The Clean Water Acts of 1977, 1981, & 1987
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
Overview of US EPA & State Manure Management Regulations
General NPDES Permit for Pesticide Application Point Source Discharges
2018 Environmental Trade Fair Shannon Gibson
Presentation transcript:

MT Department of Environmental Quality (DEQ) Water Protection Bureau February 12, 2014 Christine Weaver

Unlawful to discharge to state waters without a valid wastewater discharge permit

 MT DEQ Water Protection Bureau is the responsible agency in Montana, except EPA has jurisdiction within Indian Reservations.  Program is called the Montana Pollutant Discharge Elimination System (MPDES)  Some exemptions…

 FIFRA was historically the only national pesticide regulation.  EPA did not believe application of pesticides to water was regulated as discharge of a pollutant.  Federal Court January 2009 decision - pesticides discharged to water are pollutants that require a wastewater discharge permit.

 Court Decision means: wastewater discharge permits are required for all biological pesticide applications, and chemical pesticide applications that leave a residue in water.  Became effective November 1, 2011

 Illegal to apply pesticides to water without a wastewater discharge permit. Federal – EPA’s Pesticide General Permit (PGP), e.g. within Indian Reservations Delegated States –In Montana, DEQ is responsible for PGP. Montana Department of Agriculture is not involved in the PGP – MDA retains existing pesticide regulatory authority.

Montana’s 308 Authorization program existed since Authorizations allowed ‘temporary exceedence’ of water quality standards for application of pesticides. State law , MCA still on the books – but MT PGP replaced the 308 program in 2011.

 PGP = Wastewater discharge permit Regulates pesticide application to surface waters Montana’s PGP developed in conformance with national requirements. Responsible party must submit request (NOI) to be covered under the General Permit. “ Insurance” Protects against citizen lawsuits

Anyone that discharges any pesticide into or over “state surface waters” in Montana (no threshold for applicability). Exception: EPA regulates within boundaries of Indian lands, through the national PGP Responsible party = “owner/operator”

“State waters” means a body of water, irrigation system, or drainage system…The term does not apply to: (i) ponds or lagoons used solely for treating, transporting, or impounding pollutants; or (ii) irrigation waters or land application disposal waters when the waters are used up … and the waters are not returned to state waters.

Do not need to apply for coverage under PGP if pesticide application is:  Not to state water: wastewater lagoons and non- returning irrigation canals are not regulated by DEQ.  Not a point discharge:  Storm water discharge  Spray drift  Applications made “near” (but NOT in or over) state surface water  DEQ will not authorize the discharge of a pesticide that is not labeled for use in water under FIFRA

“…means a person who owns, leases, operates, controls, or supervises a point source. For the MT PGP, this could include: Entity with control over the financing or decision to perform pesticide applications, (i.e., county weed control district, BLM); or Entity with day-to-day control (i.e., pesticide applicators).

 Decide if you are subject: Plan to apply pesticide to state water? Are owner/operator?  Complete Notice of Intent (NOI) for coverage under the General Permit

Will the pesticide application occur in one county or multiple counties? What type(s) of pesticide use patterns and what is the total annual acreage that you intend to treat for each?  Tier I (no threshold) vs. Tier II

Include: (1) state surface waters that contain water at the time of pesticide application, and (2) conveyances with a hydrologic surface connection to state surface water at the time of pesticide application.  Count each pesticide application activity as a separate activity. For example, applying pesticides twice a year to a ten acre site should be counted as twenty acres of treatment area.

 Submit fee  Submit complete Notice of Intent (NOI) Form  Comply with PGP

 Less than Annual Threshold (Tier I) Single-County $50 Multi-County$100  Greater than Annual Threshold (Tier II) Single-County $500 Multi-County$1200

 Real-time authorization (authorized upon DEQ’s receipt of complete NOI package).  DEQ will send letter of acknowledgement to all applicants, including NOI #MTG870xxx.  Authorized for five years/General Permit renewal unless terminated (Form NOT). Current General Permit expires October 31, 2016

 A principal officer for the designated owner/operator must certify the NOI.  Certification attests to accuracy & completeness of NOI, as well as compliance with PGP.

 Tier I – general requirements for all owners/operators subject to PGP.  Tier II – includes above, PLUS additional regulatory requirements for “over threshold” (larger) owner/operators.

Apply pesticides within labeled rates and/or in accordance with pesticide use directions under FIFRA and other state pesticide requirements.

Document the rationale for determining the type & amount of pesticide used  Satisfied by having the pesticide label available.

 Adverse incident reporting required within 24-hrs & follow-up written report within 5 days of becoming aware of an adverse incident.  Adverse incident = unusual or unexpected effects on nontarget organisms.

Records to be maintained: Copy/access to MT PGP NOI Copy DEQ Authorization Letter MAINTAIN RECORDS FOR 3 YEARS

Additional requirements for larger owner/ operators:  Pesticide management plan  Maintenance  Calibration (and recordkeeping)  Annual Report (AR-3)

 PDMP must be reviewed at least annually and updated as needed.  May reference existing documents such as Integrated Pest Management (IPM) Plans and weed control plans as appropriate.

 Ensure pesticide application equipment is maintained in proper operating condition by inspecting, cleaning and repairing such equipment on a regular basis. Applicant determines & documents what maintenance is required.

 Ensure pesticide application equipment is calibrated in order to have effective pesticide application and pest control by adhering to any manufacturer’s conditions and industry practices. Applicant determines what manufacturer’s conditions and industry practices apply to their equipment and maintains calibration records.

 Conduct appropriate visual monitoring: spot checks for adverse incidents, such as fish kills or distressed macro- invertebrates assessments during pesticide application when feasible post-application assessment for efficacy if normally performed.

Tier II applicants must submit an annual report:  Form AR-3 - due to DEQ each year by January 28 th

In addition to Tier I basic records, Tier II applicants must also maintain:  PDMP, including updates  Pesticide application information  Copies of or access to documentation of equipment calibration records  Post-application monitoring including any unusual or unexpected effects identified to non-target organisms MAINTAIN RECORDS FOR 3 YEARS

 DEQ is responsible for renewing the PGP.  Each owner/operator is responsible for submitting updated NOI prior to permit expiration date (unless authorization termination already requested through Notice of Termination (NOT) form).

 Website to keep current  Contact : Christine Weaver at or Jeff Ryan at or