Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.

Slides:



Advertisements
Similar presentations
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
Advertisements

EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
1 VALENCIA FEBRUARY 2008 STUDY VISIT ON BEST PRACTICES IN WASTE MANAGEMENT INFRA VALENCIA FEBRUARY 2008 Incineration of Waste.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
INTRODUCTION TO ISO Joan Kithika. OUTLINE DEFINITIONS WHY ENVIRONMENTAL MANAGEMENT? LEGAL OVERVIEW HOW TO MANAGE THE ENVIRONMENT-AN ENVIRONMENTAL.
Resource Conservation and Recovery Act Authorizes EPA to identify hazardous wastes and regulate their generation, transportation, treatment, storage and.
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Consultant: CMDC Joint Venture Application of BAT in IPPC/EIA Experience in EU Member States Per Ponsaing COWI.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Insert Filepath here International Symposium on Environmental Issues Industrial Pollution Control and Risk Management September 28 & Jack O’Keeffe.
GENERAL IDEAS IN AIR POLLUTION CONTROL
Estonian Environment Information Centre The FINAL SEMINAR OF PROJECT LIFETCY98/CY/167 “Integrated Control of Industrial Pollution and Chemical Substances.
R Pharmaceuticals Waste Incineration & Heat Recovery at Roche Ireland Ltd. Andrew Carden.
The IPPC Recast. New environmental requirements for explosives production sites.
Wednesday, 12/12/2007, FYROM Prevention of Contamination from Mining & Metallurgical Industries in FYROM Strategic Plan for Prevention of Contamination.
Grupowa Oczyszczalnia Ścieków Łódzkiej Aglomeracji Miejskiej Fot: U. Czapla Practical aspects of compliance with the Integrated Permit requirements based.
Harmonization and Implementation/Enforcement of Environmental Legislation in the field of Industrial Pollution Control in Latvia Ilze Kirstuka Director.
Group ENVIRONMENTAL ASPECTS IN BUSSINES STRATEGY. THE EXPERIENCE IN ARLITA.
European Commission, DG Environment Unit B.1: Water, Marine and Soil EU Substitution Conference - Hamburg, 13/14 June 2002 Slide 1 EU Conference on Substitution.
Monday, 10/12/2007, SERBIA Prevention of Contamination from Mining & Metallurgical Industries in Serbia Strategic Plan for Prevention of Contamination.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
VOC Emissions Control from Industrial and Commercial Sources Dr. Miriam Lev-On The LEVON Group, LLC SP7: Current Control Strategies for Industrial Emissions.
ENVIRONMENTAL MONITORING AND REPORTING BY ENTERPRISES FEASIBILITY OF DEVELOPING MONITORING GUIDELINES FOR CHEMICAL INDUSTRY IN EASTERN EUROPE, CAUCASUS.
Responsible Care Initiation to Implementation at GPIC
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
SATI TEXTILE GROUP IPPC IMPLEMENTATION 23 March 2012.
Acquis communautaire in Chapter 27 – Environment
The Sevilla process for supporting the implementation of the IPPC Directive Michael Parth Tallinn – Estonia 27 – 28 March 2008.
Egyptian and Italian Cooperation Programme on Environment Best Available Techniques (BAT) Mr. Giorgio Grimaldi Mr. Giorgio de Benedetti 1 Workshop: “Best.
Pollution Prevention Toyota Industrial Equipment Mfg., Inc. December 7, 2011.
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Site visit COVEX Site visit Visit to COVEX, S.A Comunidad de Madrid CONSEJERIA DE MEDIO AMBIENTE, VIVIENDA Y ORDENACIÓN DEL TERRITORIO.
NATIONAL RAILWAY INFRASTRUCTURE COMPANY Safety Inspectorate Inspection Ecology September 2011 Waste management in National Railway Infrastructure Company.
PRTR-online survey. Questions – Items Question 3 – Item 2.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
Energy Efficiency in Industrial and Commercial Facilities 2003 Energy and Environmental Conference September 16, 2003.
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
ROMANIA INTEGRATED POLLUTION PREVENTION AND CONTROL - IPPC MINISTRY OF ENVIRONMENT AND WATER MANAGEMENT PRAHA June 2004 Iuliana Chidu EU Counsellor.
ECENA First Plenary Meeting January, 2006 Zagreb, Republic of Croatia Forthcoming obligation related to implementation and enforcement of EU legislation.
Introduction of international standards in energy sector CF “Centre of sustainable production and consumption” Almaty, July 4-6 Safargaleyeva Guzaliya.
IPPC Amcor Flexibles Reflex - Facility B. IPPC – AFR_B The Facility was qualified as an installation for surface treatment of products using organic solvents,
1 st Program of Experience Exchange INSPECTION – PLANNING AND REPORTING (CURRENT SITUATION IN THE REPUBLIC OF CROATIA IN CORRELATION WITH IPPC) Brijuni,
1IndustrialEmissionsDirective. 2 The European Parliament is discussing the Industrial Emissions Directive as adopted by the Council for the second reading.
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
ISO MONITORING AND MEASUREMENT. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be.
European Regulatory Framework 1st April Faro Alessio Di Paolo.
PRESENTER:Julia Brown Waste Research Management & Training Centre Scientific Research Council CLEANER PRODUCTION TECHNOLOGIES.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
AIR POLLUTION PREVENTION AND CONTROL
IED, BAT and Derogations Richard Wood URS Leeds 22 nd May 2013.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
ENVIRONMENTAL COMPLIANCE STRATEGIES’ ROLE AND IMPACT, ALTERNATIVES AVAILABLE TO SELF POLICE, OR MONITOR COMPLIANCE.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Environmental Regulation.  Complex set of laws  Constantly changing  Cover: Release, treatment, storage and disposal of Hazardous materials Into air,
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
The current legal situation
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Introduction to the philosophy
ENVIRONMENTAL PROTECTION External EHS Expert Panel Workshop
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT

Pagina 1 de 3 CEPSA Química IPPC DEVELOPMENT: KEY DATES YEARPUBLICATION/ACTION 1996/09 Council Directive 96/61/EC of 24th September 1996 concerning integrated pollution prevention and control ("IPPC Directive") 2002/07Transposition to Spanish legislation: Law 16/2002 (IPPC) 2003/02 Publication of Reference Document on Best Available Techniques in the Large Volume Organic Chemical Industry (LVOC BREF) 2004/01Presented documentation to Andalusia Environment Government 2005/04 Obtained “Integrated Environmental Authorization (AAI)” 2007/102007/10/30 Final date for “Integrated Environmental Authorization (AAI) ”

Pagina 1 de 3 CEPSA Química Quality, Safety and Environment Certifications ISO 9001 ISO OHSAS RESPONSIBLE CARE QUALITY ENVIRONMENT RISKS PREVENTION EMASENVIRONMENT DOÑANA 21SUSTAINABILITY At start of IPPC legislation CEPSA Química had established operational procedures to control and minimize pollution

Pagina 1 de 3 CEPSA Química QUIMICA IPPC DEVELOPMENT What’s needed to obtain IPPC permit?: BREF Documents relevant to petrochemical industry : “Large Volume Organic Chemical Industry”, 2003/02. “Cooling Systems”, 2001/12. “Common Waste Water and Waste Gas Treatment and Management Systems in the Chemical Sector”, 2003/02. “Emission from storage of bulk or dangerous materials”, 2003/07. “Monitoring Systems”, 2003/07. “Large Combustion Plants”, 2003/03 Did not exist specific BREF of phenol production (today: first draft in study). Methylamine: BREF LVOC summary of system established in CEPSA Química: BAT. PHENOL/ACETONE: Process via cumene oxidation formed by alkylation: BAT

Pagina 1 de 3 CEPSA Química Control of Air Pollution Emissions QUIMICA IPPC DEVELOPMENT: requirements Fuel: Priority utilization of natural gas. Minimization of Fuel-oil (Voluntary objective) High reduction in SOx and Nox emissios 2004: Only one furnace used FO and NG simultaneously: B-401. New plant that started at 2007: furnace designed only for natural gas. 2008: stopped use of FO. 2009: New furnace B-401N to substitute old B-401. New furnaces: Low NOx burners. B-401 NOx emissions below limits.

Pagina 1 de 3 CEPSA Química IPPC DEVELOPMENT: requirements

Pagina 1 de 3 CEPSA Química QUIMICA IPPC DEVELOPMENT: requirements Control of Air Pollution Emissions Continuous emissions Monitoring system for furnaces > 50 Mw: (B-401/ B-401N) and cogeneration plant. Adaptation of platform and ladder in furnace B-401’s stack for air emission measurements. Design of stacks to optimize dispersion of pollutant.

Pagina 1 de 3 CEPSA Química QUIMICA IPPC DEVELOPMENT: requirements Control of Air Pollution Emissions Minimization of Volatile Organic Compound emissions (VOC’s) (Voluntary objective) Optimization of activated charcoal chambers system to reduce VOC in air from oxidation reactors. New vents absorber of Methylamine plant. Reduction of atmospheric vents from trucks and drums loading. Change of open samplings systems to closed-loops. Pump Seals: Substitution of water systems to gas closed circuits. Establishment of a Leak Detection and repair (LDAR) program.

Pagina 1 de 3 CEPSA Química QUIMICA CEPSA Química has a Cogeneration plant that has an independent IPPC Permit. Reduction of limit to NOx: 500 to 75 mg/Nm3. Change to a gas generator with Dry Low Emissions technology. 8 MM €. Investment 8 MM €. IPPC DEVELOPMENT: requirements Control of Air Pollution Emissions

Pagina 1 de 3 CEPSA Química Control of Waste Water Emissions QUIMICA IPPC DEVELOPMENT: requirements Process water waste is sent to a primary treatment and then goes to the treatment plant where the contaminants are eliminated through a biological cleaning process: Emission point #1 IPPC permit established authorized waste water limits and how they must be controlled. CQ have made Investments to optimize effluent plant in order to improve the quality of the waste water even better than limits: Design and implementation of new system of waste water treatment from new plant that started operation at Optimization of control elements to lower contamination of waste water. New filter system for sludge excess

Pagina 1 de 3 CEPSA Química Control of Waste Water Emissions QUIMICA IPPC DEVELOPMENT: requirements The rainfall water has an independent circuit: Emission point #2 IPPC permit established that water could only be sent at this emission point when it's raining and must be free of contaminants. CEPSA Química had made Investments to take residual water out of rainfall circuit. Implementation of Continuous Flow equipment that allows us to control that rainfall circuit only operates when it’s raining.

Pagina 1 de 3 CEPSA Química Control of Wastes QUIMICA IPPC DEVELOPMENT: requirements IPPC permit established authorized Hazardous waste and regulations about its management. CQ has established techniques and operational controls to minimize wastes. New temporary warehouses has been built to gather the residues. Selective gathering of residues has been improved.

Pagina 1 de 3 CEPSA Química Control of soil and groundwater QUIMICA IPPC DEVELOPMENT: requirements CQ has established techniques and operational controls to avoid this contamination. Special attention to storage: leak proofing of storage tanks, built over pedestal with leaks detectors, bunds,….. Protection of land of Operational areas by use of waterproof concrete.

Pagina 1 de 3 CEPSA Química Other requirements stipulated in the permit QUIMICA IPPC DEVELOPMENT: requirements Internal and external measurements, control and report of air emissions, waste water, wastes…(many of these are indicated on environmental legislation). Audits of compliance of requirements from IPPC permit by administration (each 2 years, measurements including). Establish obligation of Communication: environmental incidents/accidents, changes in process, productive stops…. Realization of annual report of “European Regulation on Pollutant Release and Transfer Registers (E-PRTR)”.

Pagina 1 de 3 CEPSA Química Environment-related operational costs and investments (MM €) YEAR INVESTMENTS 0,1840,7760,5010,5445,2811,43810,024 OPERATIONAL COSTS 4,9636,3507,8678,6404,9425,5726,274 Not including technical changes operational and security that have relation with environment. Not including Cogeneration Plant.

Pagina 1 de 3 CEPSA Química Consumption of water, calorific energy, electricity

Pagina 1 de 3 CEPSA Química And now? QUIMICA IPPC DEVELOPMENT: requirements Validity period of permit is 8 years (will expire in 2013): The documentation for renewal was presented in May, 2012 Requirements of new BREF and new legislation will be included (for example Industrial Emissions Directive) Will establish new BAT and emission levels associated (BAT-AELs): new investments. Will include references to raw materials and energy consumption.

Pagina 1 de 3 CEPSA Química THANKS QUIMICA