0 Wastewater Strategy “Not to Waste our Water”. S TRATEGY O BJECTIVES C OLLECT AND TREAT ALL WASTEWATER ACCORDING TO NATIONAL STANDARDS AND REGIONAL AGREEMENTS.

Slides:



Advertisements
Similar presentations
Rudolf Frauendorfer Asian Development Bank
Advertisements

Water policy development in Uganda
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
IPN-ISRAEL WATER WEEK (I2W2)
Improving Water Quality: Controlling Point and Nonpoint Sources Chapter 15 © 2004 Thomson Learning/South-Western.
Sustainable Regional Water Resource Management By: Tucson Regional Water Coalition and Southern Arizona Leadership Council.
Recycling for the Future – The Dublin Waste Management Plan Mary O’Reilly RPS Consulting Engineers.
Use of wastewater in agriculture in St. Kitts Author/s: Country flag Mr. Ian Chapman Mr. Dennison Paul Mr. Gerry Moise Mr. Alexander Riley.
PPP’s IN NIGERIA: Prospects in the Water Sector
Our Water, Our Resource, Our Responsibility Module 2: Water Management Unit 1: Roles, Responsibility and Legislation Muckno Mill Lough.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
National IWRM plans; links with Water Supply and Sanitation Palle Lindgaard Jørgensen Technical Secretariat Yerevan, 13 December 2006.
IWRM in EECCA countries Palle Lindgaard Jørgensen Technical Secretariat Helsinki, May 2007.
Safe Drinking Water and Sanitation Theme 1. Global Status Regional distribution of global population not served with improved water supply and improved.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
The TNA Process in Costa Rica Experiences and lessons learned Francisco Sancho Advisor TNA
Safe Use of Wastewater in Agriculture UN-Water at IFAT 2012 Water reuse in Agriculture in the Arab region Situation, needs and challenges Eng. Khaldon.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
“Community Based Approach to Local Development ”Project: Strategic context, nature, objectives and key characteristics.
BUILDING SUSTAINABILITY: PARTNERSHIPS AND FINANCE by S. Adrian Ross Senior Programme Officer PEMSEA.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
I NVESTMENT FOR P UBLIC S ERVICES : H OW TO B ETTER S UPPORT THE G ROWTH OF T HESE S ECTORS 21 J ANUARY 2015 Valeria Ronzitti – General Secretary.
National Policy and Strategy for Agriculture, Forestry and Fisheries 15 March, 2004.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Cooperation on Transboundary Waters: A Challenge for Europe and Other Regions of the World Dr. Stephen F. Lintner World Bank.
LIFE THIRD COUNTRIES Development and Implementation of an Integrated System for the Control and Monitoring of the Urban Wastewater Treatment Plants in.
Wastewater Production, Treatment, and Use in Swaziland Saneliso Makhanya Third Regional Workshop ‘Safe Use of Wastewater in Agriculture’, September.
The Management Strategy for the Bulgarian Part of the Black Sea and its Coastal Lakes Lyudmil Ikonomov Executive Director, Institute for Ecological Modernisation.
Kitakyushu Initiative for a Clean Environment: Capacity Building for Urban Air Quality Management Mushtaq Ahmed Memon and Hidefumi IMURA 3 rd Thematic.
CSC 6 February 2008 The Don Catchment as an Opportunity Facilitating Answers to ICM Dr. Jonathan Hillman.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
DEREL TEMPUS DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING DEVELOPMENT OF ENVIRONMENTAL AND RESOURCES ENGINEERING LEARNING.
WASTE WATER STATISTICS IN TURKEY Tülay AKICI Environmental Statistics Division State Institute of Statistics, TURKEY April,
Sewage Infrastructure Development in Israel The water Authority The Sewerage Infrastructure Development Administration.
SWITCH Training Kit: Pilot Training, Muñoz, July 2010 Wastewater Management in the City of the Future Wastewater and sustainable urban water management.
6 th World Water Forum – Time for Solutions Wastewater Management RT - Introduction Wastewater management and reuse is a major practical solutions for:
Integrated Water Management Valentina Pryazhinskaya Water Problems Institute of the Russian Academy of Sciences Problems and Challenges: Conflicting interests.
SADC PPP Network Infrastructure and Development Goals Facts About Infrastructure Kogan Pillay Head SADC PPP Network 7 March 2014.
Resource and Waste Management in ALBANIA Ministry of Environmental, Forestry and Water Administration & Institute.
Group Work IWRM Integrated River Basin Management.
Seminar “American Expertise and technology for the water and wastewater sector” 11 April 2011 Business Opportunities in the Romanian water and wastewater.
INTRODUCTION 2.EUROPEAN UNION HARMONIZATION PROCESS 3.LEGISLATION STUDIES 4.ADMINISTRATIVE STRUCTURE 5.IMPLEMENTATION PROCESS.
National Environmental Investment Strategy - NEIS Ana Petrovska Regional Environmental Centre for Central and Eastern Europe.
Liaoning Province Recycling Economy Development Plan By Changhua Wu amd Ernie Lowe Dalian, September 2002.
Botswana Integrated Water Resources Management – Water Efficiency (IWRM-WE) Project Michael Ramaano IWRM/WE Project Manager, Tel:
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
Outcomes of the Namibia Water investment Conference Mr Abraham Nehemia Under Secretary for Water Affairs and Forestry 14 September 2012 Ministry of Agriculture,
Strategy of economic and social development of St. Petersburg until 2030 Committee for Economic Policy and Strategic Planning of St. Petersburg
Current Status of Recycling Most large investment in regional infrastructure during drought coming to completion NSW Office of Water working with ARWCE.
Addressing the double challenge EU accession process, an opportunity to address water sector challenges 2016 Danube Water Conference 12 May 2016, Vienna.
The National Framework for Waste Management in Norway Conference on Waste Management, Sibiu, 3-4 November 2009 Barbro Thomsen, Senior Adviser.
Effluent Treatment Plant. Introduction The effluent treatment plant (ETP) is a method that is used to treat the emanation coming out from many areas of.
Water Charge Instruments for Environmental Management in Latin America: from Theoretical to Practical Issues Mexico Country Case Lilian SAADE HAZIN and.
Economic Regulation of Irish Water
National Administration “Romanian Waters” NARW Bucharest - Romania
U.S. Department of Housing and Urban Development
Regional Workshop on e-waste
Overview on Renewable energy in Bulgaria
An example of Finland's approach to wastewater treatment for households in rural areas Kimmo Tiilikainen Minister of the Environment Finland
70% We need to reimagine urban water management – ESPECIALLY IN DEVELOPING COUNTRIES With climate change and exponential population growth in cities, traditional.
Republic of Kazakhstan Priority Issues in 7 Major River Basins
progress of the water reform in bulgaria
Integrated Bilateral Agreement (IBA) 2018 to 2028
The SWITCH Approach to Integrated Urban Water Management
Kazakhstan Water Management Country Status Factsheet
Moldova GEF Environmental Infrastructure Project
Environment in Cohesion Policy framework for
Presentation transcript:

0 Wastewater Strategy “Not to Waste our Water”

S TRATEGY O BJECTIVES C OLLECT AND TREAT ALL WASTEWATER ACCORDING TO NATIONAL STANDARDS AND REGIONAL AGREEMENTS R EUSE TREATED WASTEWATER FOR AGRICULTURE, INDUSTRY, AND AMENITY IN LINE WITH NATIONAL HEALTH AND SAFETY STANDARDS R ECOVER COST BASED ON THE ‘ POLLUTER PAYS ’ PRINCIPLE 1

M AIN S ECTOR I SSUES 1.N O CLEAR POLICY WITH RESPECT TO : a.S ELECTION OF TREATMENT PLANT SIZES AND TECHNOLOGIES b. TREATMENT TECHNIQUES ESPECIALLY IN RURAL AREAS c. POPULATION PROJECTION YEARS 2.F RAGMENTED APPROACH WITH RESPECT TO COLLECTION AND TREATMENT 3.N O CONSIDERATION FOR RE - USE OF TREATED EFFLUENT 2 4.L ACK OF PRE - TREATMENT POLICY FOR INDUSTRIAL WASTEWATER 5.E XCESSIVE DELAYS FOR PROJECTS COMPLETION MOST PROJECTS TAKE MORE THAN 10 YEARS TO BE COMPLETED 6.N O WASTEWATER FEES TO COVER THE OPERATION AND MAINTENANCE OF THE SECTOR 7.P OOR LEGAL AND INSTITUTIONAL FRAMEWORK

C URRENT S ITUATION G ENERATED WASTEWATER : 310 MILLION CUBIC C OLLECTED WASTEWATER : 60% T REATED : 8% O PERATIONAL TREATMENT PLANTS : 4 C OMPLETED TREATMENT PLANTS BUT NOT OPERATIONAL : 7 U NDER CONSTRUCTION : 6 U NDER D ESIGN : 17 R EQUIRE F UNDING : 20 I NVESTMENTS TO DATE : 1.5 B ILLION USD A DDITIONAL FUNDS REQUIRED FOR 54 SCHEMES : 1.7 B ILLION USD A DDITIONAL FUNDS FOR UNCOVERED AREAS

Sector targets 1.Increase the present wastewater collection (60%) and treatment (8%) to 80% collection and treatment by 2015, and 95% collection and treatment by Increase reuse of treated effluent from zero percent in 2010 to 20% by 2015, and 50% by Secondary treatment and reuse of all inland wastewater by 2020, and secondary treatment and reuse of coastal wastewater where reuse is economically justified by Pre-treatment of all industrial effluents by Full recovery of O&M costs by 2020 following the ‘polluter pays’ principle.

S TRATEGIC INITIATIVES INTEGRATED AND PRIORITIZED INFRASTRUCTURE INVESTMENT PROGRAM TO RAPIDLY INCREASE WASTEWATER COLLECTION, TREATMENT AND REUSE RATES L EGAL, REGULATORY AND POLICY MEASURES TO SET AND REGULATE STANDARDS I NSTITUTIONAL MEASURES TO DEFINE RESPONSIBILITIES AND TO CREATE CAPACITY FOR SERVICE DELIVERY F INANCIAL MEASURES FOR VIABILITY AND AFFORDABLE SERVICES O PTIMIZE PRIVATE SECTOR PARTICIPATION 5

I NVESTMENT SUMMARY I NVESTORS S HORT – M EDIUM T ERM (M ILLION US$) L ONG T ERM (M ILLION US$) T OTAL (M ILLION US$) G OVERNMENT OF L EBANON D ONORS P RIVATE S ECTOR M UNICIPALITIES A VAILABLE AT CDR680- T OTAL 1,8951,2133,108 6

7

Major Achievements 1- Projects 2- Master Plans

12 Projects in 8 Regions Benefiting at least 25% of the Population

C HEKKA, K OURA AND B ATROUN WASTEWATER NETWORKS

S OUWAYJANI /C HOUF T REATMENT P LANTS

C OASTAL K ESERWAN, J EITA, K FARDEBIANE, AND H RAJEL WASTEWATER SCHEMES

R EVISED LOCATION FOR B OURJ H AMMOUD TREATMENT PLANT

5 Regional Master Plans

B ATROUN M ASTER P LAN

BAABDA AND ALEY MASTER PLAN

K ESERWANE M ASTER P LAN

J BEIL M ASTER P LAN