Introduction to the Mini-Pilot Treatment System CEEN 572 Environmental Engineering Pilot Plant Laboratory.

Slides:



Advertisements
Similar presentations
Clean Water Treatment Wastewater treatment.
Advertisements

Amherst , MA, Drinking Water System Atkins Water Treatment Plant
Often water is prescreened, treated with ozone, or pre-chlorinated before entering the coagulation basin (depending on the quality of the water). Coagulation.
Environmental Engineering 343
North Texas Municipal Water District Water Treatment Process.
American Water Raw Water Quality Not Textbook? Just Pilot! Iron Removal with High pH Raw Water March 27, 2008 Sandy Kutzing, P.E., CDM Eric Hahn, P.E.,
Filtration by Douglas Rittmann, Ph.D., P.E.
CE 370 Filtration.
Phosphorus Removal at Sand Creek Water Reuse Facility by Duane “Bear” Steib and Kathy Bill/City of Aurora Steve Polson/CH2M HILL by Duane “Bear” Steib.
Benjamin C. Whitehead, PE Benjamin J. Klayman, PhD, PE Case Study: Commissioning New Rapid Sand Filters at Donald K. Shine Water Treatment Plant.
Surface Water Treatment Plant
ETL Multi Media Grey Water Filters and Pre Reverse Osmosis Filtration.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering Water Treatment Plant Design alum Flocculation Clear Well Sedimentation.
Filter Loading and Backwash Rates Well Yields and Chlorine Dosage in Waterworks Operation Math for Water Technology MTH 082 Lecture Chapter 4 & 8- Applied.
Drinking Water and the Lake There are 40+ plants utilizing Lake Michigan Water Illinois, Wisconsin, Michigan, Indiana Sizes of 1 MGD to 1 BGD Designed.
Monroe L. Weber-Shirk S chool of Civil and Environmental Engineering WTP Project Safety, Expectations, Economics, Logic Raw water To waste F1F1 F1F1 S1S1.
Conventional Surface Water Treatment for Drinking Water.
Molalla Water Treatment Plant Field Trip 4/24/07 Molalla Water Treatment Plant Field Trip 4/24/07.
1 Filter Backwash Recycling Rule FBRR Final: June 8, 2001.
Surface Water Treatment Plant. Fig 4-8: Flow Diagram of conventional surface water treatment plant (“filtration plant”)
Water Treatment Stations Tue. (am) Tue. (pm) Wed. (am) Wed. (pm) Thur. (am) Thur. (pm) Station 1Mini-pilot (CO 166 Greenhouse - Liz) Station 2NF.
1 III. Water Treatment Technologies Topic. III. 5. Micro-mesh Screens. Filters: Kinds, Constructions and Operation Micro-mesh Screens I. Purpose §For plankton.
Water Treatment CE 326 Principles of Environmental Engineering Department of Civil, Construction and Environmental Engineering Iowa State University March.
Fields Of Activity Industrial water treatment Waste water treatment – recycling and upgrading Fine Cyclonic separations for cosmetics and oil industries.
IMPROVED AND INOVATIVE RURAL WATER SUPPLY DESIGN CONCEPTS
FILTRATION CE326 Principles of Environmental Engineering
1 Full-Scale Testing of Innovative High Rate Filter Media for Plant Expansion Bob Raczko, P.E. United Water.
Filtration. Filtration Single Media Rapid Sand Dual Media Rapid Sand.
ENCE 667 Project Performance Measurement Patuxent Water Treatment Plant Upgrade schedule analysis Presented by: Luis Rubio Isobo Tariah.
E NVIRONMENTAL E NGINEERING 441 Lecture 5: Water Treatment (3) Sedimentation & filtration Philadelphia University Faculty of Engineering Department of.
PERFORMANCE OF A GRANULAR ACTIVATED CARBON BIOFILTER IN LOW STRENGTH WASTEWATER TREATMENT D. S. Chaudhary, H. H. Ngo and S. Vigneswaran Environmental Engineering.
Managing Cryptosporidium Risk. 2 Risk Assessment All stages of the process need to be examined Catchment Source Treatment Distribution Consumer’s premises.
Water treatment at the Avenue. The Avenue Coke Works Processed coal to produce coke Coke used as a smokeless fuel and in the steel-making industry Wastes.
Sustainability through innovation in water analysis
SEDIMENTATION & FILTRATION
Sand Filtration. Tipe: Slow sand filtration Rapid (gravity) sand filtration Rapid (pressure) sand filtration.
Objective In this lesson we will answer the following questions: How does filtration fit into the water treatment process? How does filtration clean water?
The Los Angeles Aqueduct Filtration Plant An Overview of Facilities and Operations.
University of Wyoming Environmental Engineering Senior Design Team Leah Birgen Brent Brouillard.
 Asia’s largest environment solutions provider, with a strong international presence  Total water & environment management solutions for all sectors.
Filtration Processes Introduction
On removing little particles with big particles
Zeosorb - The Clean Solution. AMAZING REVOLUTION!! LATEST STATE OF THE ART 3 IN 1 SOLUTIONS Zeosorb FOR YOUR WATER FILTERATION UNITS.
Chemical Engineering Department Government Engineering College Bhuj Prepared by: Kumar Satyam Guided By: Prof. Sejal J. Solanki Chemical.
Water Filtration Plant Improvements Project Summary
SEDIMENTATION & FILTRATION
Groundwater Pilot Treatment System Update May 2017
Amherst , MA, Drinking Water System Atkins Water Treatment Plant
Hub 4 Water Media Filters
Sand Filtration Qomarudin Helmy.
What’s New in Water Treatment?
Inventory and Tertiary Treatment of Effluent from Textile Industries in Bangladesh The use of a new system combining an enhanced coagulation, flocculation.
Hub 4 Water Carbon Filters
EPCOR Water Services Inc.
Regen Media Filter & Filter Media Task Group Update
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
Lecture # 11 Water treatment:.
ENG421 (9ab) – Filtration Filtration Types of Filters Filter Media
Pilot testing services and a case study to reduce organics Devendra Borikar, Laura Zettler, Jeff Avedesian, Lindsay Ariss, Luc Léonard, Denis Dolbec,
Three choices: Surface water Groundwater
Enhancing Rapid Sand Filtration by Backwashing with Alum
FILTRATION III EXAMPLE
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
Treatment – Sediment Filters
ENG421 (9c) – Filtration Filtration – design examples.
FILTRATION I.
Arsenic Lisa Miller Water Quality Engineer Golden State Water Company
Skid Mounted Water Treatment Plant
National Optimization Goals
Presentation transcript:

Introduction to the Mini-Pilot Treatment System CEEN 572 Environmental Engineering Pilot Plant Laboratory

Mini-Pilot Treatment System  Mimics both conventional and direct filtration plant Direct filtration  skip sedimentation  Appropriate for low-turbidity source water  The min-pilot mimics CSM’s pilot system at the Golden WTP  Partially automated treatment system  Critical operating steps Startup Backwashing Dose adjustments Data retrieval

 Anthracite coal (1.55) and quartz sand (2.65)  More depth is utilized Dual-Media Filter

0.5 – 2 mm Anthracite

Dual-Media Filter

Headloss Through Clean Granular Filters  Net available head = filter design headloss – clean- bed headloss  Insignificant in slow sand and pre-coat filtration, but important in rapid filtration

Rapid Filtration – Filter Run  Effluent turbidity characterized by three distinct segments:  Ripening media conditioning (15 min - 2 hr) Sometimes contain two peaks Size and duration can be reduced by proper backwashing procedure Filter-to-waste line  Effective filtration Steady state turbidity <0.1 NTU Gradual increasing in head loss  Breakthrough Filter can’t hold more particles Effluent turbidity increases Headloss increases

Rapid Filtration – End of Filter Run  Can be triggered by several events and lead to backwash:  Breakthrough  Headloss Increases beyond the available head through the process Rapid filters are typically designed with m (6-10 ft) available head If in specific cases neither are reached within several days: utility initiate backwash after a set period of time

Mini-Pilot Treatment System

Mini-Pilot Flow Diagram Feed Tank KMnO 4 Flocculation Basin turbidimeter pH Chlorine pH adjustment Overflow Coag. Backwash Lines Backwash Waste V-1 V-2 V-3 V-2 V-5 V-4 V-10 V-14 V-13 V-12 V-11 V-9V-7 V-8V-6

Supervisory Control And Data Acquisition (SCADA) System

Mini-pilot Control Panel

Recovery of Logged Data

Startup Procedure STARTUP: STEP√DESCRIPTION 1 Check the water level in the feed drums. If the water level is low, prepare to switch to the next drum. 2 Check that the chemical feed containers are full and that the tubings are fully submerged. 3 Open V-1 and close V-2, V-3, V-4, V-5, V-6, V-7, V-8, V-9, V-11, V-12, V-13, and V Position V-10 to send water from the desired column to the turbidimeter, and adjust V-7 and V-9 accordingly. 5 Start the submerged feed pump and check that the flow into the flocculation basin is smooth. 6 Start the SCADA system. 7 If the flocculatiion basin is empty, stop the mixers and turn them on again when the impellers are submerged. 8 Start the coagulant dosing pump and adjust the appropriate flowrate. 9 Start the KMnO4 dosing pump and adjust the appropriate flowrate. 10 Start the mixers again and adjust their G. Start with 40, 10, When the water level reaches the 3rd compartment overflow gate, open V-2 and V S l o w l y open V-4 and V-5 and adjust overflowrate to gpm/sqft. 13 Adjust SCADA settings. 14 Adjust V-1 so that the overflow from the flocculation basins is minimal. 15 Check pH in compartment 1 and adjust by adding lime to the feed tank.

Operation Procedure OPERATION: STEP√DESCRIPTION 1 Frequently check the water level in the feed drum. If water level is low, prepare to switch to the next drum. 2 To switch feed drum: stop the feed pump/s; close V-1; turn off the KMnO 4 and coagulant dosing pumps; transfer the pump/s into the next drum; start the pumps; open and adjust V-1; start the KMnO 4 and coagulant dosing pumps. 3 Frequently check the turbidity level; if the level exceeds 0.3 NTU, perform column backwashing. Also, once in a while take sample from the filtrate that is routed to the turbidimeter and check turbidity on the desktop instrument 4 Frequently switch the feed to the turbidimeter (V-10) to check the filtrate turbidity of the second column. NOTE: make sure to select the measured filter column in the SCADA system because the datalogger does not distinguish between columns... 5 Frequently check the level of chemicals in the chemical containers and add stock solution if necessary 6 Obtain samples for Mn analysis at predetermined times. Samples should be taken from the feed tank and from the filtrate of each column (V-6 and V-8) 7 Occasionally check that the water level in the flocculation basins is OK and adjust V-1 to provide minimum overflow from the flocculation basin. 8 Check the pH at the flocculation basins and feed tank occasionally, and log data manually.

Backwashing Procedure BACKWASHING: STEP√DESCRIPTION 1 Stop the NaOH and chlorine dosing pumps, if they are operating. 2 Turn off V-2 and V-4 if you are backwashing filter column 1 or turn off V-3 and V-5 if you are backwashing filter column 2. 3 Fully open V-13 if you are backwashing filter column 1 or fully open V-14 if you are backwashing filter column 2. 4 Start the feed line for backwashing. 5 S l o w l y open V-11 (backwashing of filter 1) or V12 (backwashing of filter 2) and start backwashing. If a plug of media rises up quickly close V-11 or V-12 and slowly open it again until full fluidization is established. MAKE SURE that the expansion stops at least 2" below the head of the column. 6 Before completing the backwashing, reduce the flowrate through the filter column (V-11 or V-12) until the flow stops to establish a good mixing layer between the sand and anthracite. 7 Turn on V-2 if you backwashed filter column 1 or turn on V-3 if you backwashed filter column 2. 8Turn off V-13 if you backwashed filter column 1 or turn off V-14 if you backwashed filter column 2. 9 S l o w l y open V-4 if you backwashed filter 1 or V-5 if you backwashed filter 2 and adjust overflowrate to gpm/sqft. 10 Start the NaOH and chlorine dosing pumps, if they are provided. 11 Check turbidity and follow Operation Procedures.

Shutdown Procedure SHUTDOWN: STEP√DESCRIPTION 1 Perform backwashing procedure on both filter columns. 2 Stop all dosing pumps. 3 Turn off V-1. 4 Stop the feed pump/s. 5 Start emptying the flocculation basin and continue filtering until there is a 3-4" headspace in each column. 6 Turn off V-4 and V-5. 7 Stop the mixers. 8 Empty the floculation basin and pump the sludge with ShopVac. 9 Retrieve data from the datalogger and turn off the SCADA program.

Mini-Pilot Flow Diagram 1 2 Feed Tank KMnO 4 Flocculation Basin Coagulant turbidimeter Chlorine Backwash Lines Backwash Waste pH pH adjustment V-1 Overflow V-3 V-2 V-5 V-4 V-10 V-14 V-13 V-12 V-11 V-9V-7 V-6 V-8