Wastewater Treatment Project Update May 15, 2013.

Slides:



Advertisements
Similar presentations
Green Growth, Green Economy and the SEEA 17 th London Group Meeting Stockholm, Sweden September 2011.
Advertisements

Agreement between the Village of Owego and Inflection Energy.
Taskforce Meeting March 4, Focus on food waste Also other organics such as leaves and yard waste and agricultural wastes Food waste about
District of West Vancouver October 28, 2013
Decentralised Wastewater Management
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Wastewater Treatment Presenter: Marius Caprariu Introducing IBI Group December 2012.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
KING COUNTY & BROWN GREASE Local sewer agencies have a need to address restaurant grease trap waste. In response, there is the potential of a renewable.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Regional Water Service Development Cost Charges Update October 2014 Bryan Shoji, P.Eng. General Manager, Infrastructure Services.
Stave Lake Water Supply & Treatment Project. Existing Water Supply System Norrish Creek Cannell Lake 19 Groundwater Wells.
STATUS OF CARLSBORG SEWER PROJECT Carlsborg Community Advisory Council Bob Martin June 6, 2013.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
Charlie Lake Sewer Collection System & Lagoon Upgrades Thursday June 20 th, 2013.
Revised FY 2007 & Proposed FY 2008 Operating & Capital Budgets Retail Rates Committee January 4, 2007.
2014 MUNICIPAL BUDGET. It is the expectation of the Council to develop community driven policy whose intent will be to ensure a safe, clean, secure environment,
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Australian Government Emissions Reduction Fund. Central component of the Government's Direct Action Plan Funding of $2.55 billion Additional funding to.
Fort Bliss Energy, Water, and Solid Waste Sustainability Initiatives Draft Environmental Impact Statement (EIS) Public Meetings June & 13, 2013.
DEPARTMENT OF HUMAN SETTLEMENTS- SANITATION INPUTS ON NATIONAL WASTE MANAGEMENT STRATEGY 29 MAY 2012 By Mandisa Mangqalaza.
CCME Canada-wide Strategy for the Management of Municipal Wastewater Effluent Manitoba Consultation Greenwood Inn December 6, 2007.
Carbon Management Board 27 th May 2011 ETHOS – Waste to Heat Project CARBON MANAGEMENT BOARD – May 2011.
1. How the budget works Niagara Region's budget has three components, the operating budget, which is similar to your day-to-day costs like gas, groceries.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
Sustainable Water Infrastructure Ivy Anderson Andey Nunes.
Property of the Township of Madawaska Valley 2015 MUNICIPAL BUDGET.
Canada as the Water Solutions Country Defining the Opportunities A summary of Canada as the Water Solutions Country, a 2013 report published by the Blue.
SUSTAINABILITY TEAM | May 19, 2010 Illinois APA, September 24, 2010.
SECRET Green Procurement Office of Greening Government Operations May 4, 2006.
Fiscal Sustainability and Local Governments MFABC FINANCIAL FORUM MARCH 26, 2015 LYNDA GAGNÉ, PHD, CPA(CGA) ASSISTANT PROFESSOR, UNIVERSITY OF VICTORIA.
2009 Budget City of Melfort An Overview of the 2009 Budget.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation Prepared for: District of Squamish and Project Sponsors Prepared by: Compass Resource.
1 Sechelt Water Resource Centre Operational Report 26 August 2015.
BORDER ENVIRONMENT COOPERATION COMMISSION Mitigating Impacts on Water Resources: Environmental Infrastructure Investment.
May 5, 2015 Water Resources Meeting Heather Gutherless Jefferson County Planning & Zoning
DATA ANALYSIS, VERIFICATION AND WRITING OF THE STATE OF WASTE MANAGEMENT IN THE CITIES REPORT 2013 Presentation By: Sandile Tyatya LTE Energy(Pty)Ltd 7:
Phoenix Convention Center Phoenix, Arizona Net Zero for the Army Reserve Sustainability Track Getting to Net Zero: Energy, Water and Waste Amy Solana Pacific.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
DRA Perspective on What Recycled Water Applications from Investor- Owned Utilities Should Contain and How They Should be Evaluated CPUC Water Recycling.
Quality Based Selection The Best Practice for Selecting Professional Consultants [DATE]
THE ROLE OF ECONOMICS IN THE IMPLEMENTATION PROCESS WFD "eco procedure" in practice.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
Overview of the NSF 375 Draft Sustainability for the Water Treatment and Distribution Industry October 30, 2012.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Clean Watersheds Needs Survey (CWNS) 2012 Gap Approach Option June 22, 2010.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
CAYUCOS TOWN MEETING BUSINESS RELATIONSHIP BETWEEN CSD AND CMB CURRENT BUSINESS RELATIONSHIP FUTURE BUSINESS RELATIONSHIP AS PROPOSED BY CMB ALTERNATE.
Campus Energy Use Intelligent Infrastructure for Energy Efficiency May 25, 2007 Peter Cooper Dept of Facilities, Manager of Sustainable Engineering and.
Hernando County’s Utilities Infrastructure Opportunity through the American Recovery and Reinvestment Act of 2009 (the Federal Stimulus Package)
Jervis Inlet Resort & Spa INFRASTRUCTURE OVERVIEW.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
Sustainable Water Infrastructure through Innovative Financing
PUBLIC MEETING 2017 Water and Sewer Budget December 13th, 2016.
Squamish Neighbourhood Energy Utility: Final Feasibility Presentation
Water Reclamation Plant Feasibility Study Update May 28, 2014
CAPITAL AND RATE SUPPORTED OPERATING BUDGETS
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
City of Noblesville Wastewater Utility
Tajiguas Resource Recovery Project Doing More with Our Waste
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
Capital Construction Project Update March 12, 2019
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Wastewater Treatment Project Update May 15, 2013

Status Preliminary design complete Detailed design being finalised Public works relocated Site prep to begin late May Construction proper in June Completion for October 2014

PROJECT COSTS & FINANCING - Baseline Position - Project Costs Costs $1.0m Contract price $21.3 PST $ costs $1.3 Contingency$0.5 TOTAL COSTS $ 25.0 Funding Available Sechelt Funding $ 8.9 Sewer Treatment Reserves $4.9 Sewer Treatment DCCs 1.5 Unrestricted Operating Surplus 2.5 Other governments $11.2 Gas Tax Funding $8.0 Building Canada Funding 3.2 Other sources $2.5 Loan $2.5 Repay over 5 years using sewer reserve surpluses FUNDING AVAILABLE $25.1

Why is it “so expensive” Because we are doing high level (“tertiary”) treatment This added about $5m to the cost... However...

Why are we doing high level treatment? Enables widest range of options for reuse of water. 90% reduction in contaminant load to Trail Bay Avoids $3m outfall expansion In keeping with Federal and Provincial policies which encourage the use of reclaimed water Goal was set in Sechelt’s 2011 Sustainability Action Plan

Sustainability Action Plan Other goals of the Plan; Reduce noise and smell to the greatest extent possible Pursue opportunities to recover resources from treated effluent Maximise energy efficiency, reduce water consumption Base infrastructure decisions on full life cycle costs Ensure that municipal infrastructure is integrated and energy efficient and has the lowest environmental impact possible. Liquid Waste : “to treat effluent to the highest levels”

Proposal Evaluation ProponentLocationTanksOperating Cost (ranking) Capital Cost* Overall Ranking Maple Reinders EbbtideCovered (greenhouse) 2$21.3m1 BLot LUncovered3$22.1**2 CLot LCovered4$26.8**3 DLot LUncovered5 (highest cost) $18.1**4 EEbbtideEnclosed in building 1 (lowest cost) >$305 * For comparison, all capital costs assume biosolids composting by Salish Soils Need to add $3.2m of DoS costs to all bid prices to get the “Project Cost” **Base bid, Lot L projects include new, relocated, odour controlled pump station at Ebbtide

Location of Ganges WWTP, Salt Spring Island

Questions?