INTEGRATING WILDLIFE AND AQUATIC ORGANISMS IN LARGE DESIGN AND CONSTRUCTION PROJECTS Terry Brennan, PE Tonto National Forest August 30, 2006.

Slides:



Advertisements
Similar presentations
Moffatt Thomas Lower Boise River Wetlands Restoration Project Sponsor:Pioneer Irrigation District Presenter: Scott L. Campbell Legal Counsel for Pioneer.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
Presentation by: LT Environmental, Inc.. Why Stormwater Matters Water is a precious resource that must be protected. Flood-defensive measures will protect.
Innovative Approaches to Wildlife/Highway Interactions The “Seven Dwarfs”
Tennessee Department of Transportation ITS Mobility and Operations Summit Performance Measures November 18 – 19, 2009.
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
State Resource Assessment (SRA) Peter Bautista WATCAC January 2012.
 Sandra Q. Larson, Iowa Department of Transportation.
Environmental Project Commitments The Alberta Experience
PENNSYLVANIA CODE Title 25.Environmental Protection Chapter 102 Erosion and Sediment Control Clean Streams Law-Act 394 of To preserve and improve.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Oregon’s Federal Aid Highway Programmatic.
1 C E T A S Range of Alternatives Presentation Date Project Name Project location (city, county) ODOT Key Number:
Earth Disturbance Programs  Chapter 102 –Erosion Control & NPDES Permits  Chapter 105-General Permits  Dirt & Gravel Roads Program.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Jan 22-24, 2007 Transportation Research Board U.S. Army Corps of Engineers Wilmington District North Carolina’s Interagency Agreements to Streamline Project.
Breewood Stream Restoration Montgomery County Capital Improvement Project to Stabilize the Breewood Tributary November 14, 2012 Sligo Middle School.
Range Practices 1 Objectives and Range Practices under FRPA & Objectives & Objectives The Focus is on Results.
West Virginia University Natural Stream Restoration Program An Interdisciplinary Program Focusing on Research, Education, and Professional Services in.
Environmental Quality Incentives Program (EQIP) Grazing – Our Most Commonly Used Conservation Practices.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Center for Watershed Protection USDA Forest Service, Northeastern Area, State and Private Forestry How to estimate future forest cover in a watershed.
The Field Office Technical Guide and Other Technical Resources CNMP Core Curriculum Section 2 — Conservation Planning.
Project Learning Tree Project Learning Tree is an award-winning environmental education program designed for teachers and other educators, parents, and.
Georgia Adopt-A-Stream Introduction Georgia Adopt-A-Stream 2 Martin Luther King Jr. Dr. SW Suite 1462 East Atlanta, Georgia
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Natural Resource Information Systems Aquatic Organism Passage Managing your Data in INFRA and NRIS Water Brian Sanborn USFS – NRIS Water/Air Region 9 –
Interim Headwater Drainage Feature Guideline: Protecting HDFs through Urbanization Laura C.R. Del Giudice, B.Sc., M.F.C., Senior Planning Ecologist.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
How Do You Choose A Bank Protection Method? A delicate balance is required, as demonstrated here by Roundman Chosen method (or combination of methods)
Natural Resources Conservation Service Tom Krapf Assistant State Conservationist NRCS - Wisconsin The Regional Conservation Partnership Program.
Municipal GIS Applications JOHN C. CHLARSON, P.E. UNIVERSITY OF TENNESSEE MUNICIPAL TECHNICAL ADVISORY SERVICE FURE.
APPLYING CONSERVATION TO THE TEXAS LANDSCAPE Norman Bade, NRCS State Resource Conservationist Conservation Provisions of the 2002 Farm Bill (Farm Security.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Making the Connection Between Water and Land Use Judy Corbett, Executive Director Local Government Commission Smart Growth gets Water-wise.
Environmental & Natural Resources EN4.01 – Describe careers in the environmental and natural resources industry.
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
JTA Section 18 Steering Team Meeting Environmental Performance Standards.
A 5-Part Workshop Series Preventing Stormwater Pollution at Your Public Works Facility.
1 C E T A S Purpose and Need Presentation Date Project Name Project location (city, county) ODOT Key Number:
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
State of the Forest: Data harmonization and management Helping us to know whether we are getting the job done.
Maximizing Impact / Minimizing Impact: Balancing Human and Environmental Concerns through Site Access Design Lee-Anne Milburn Department of Landscape Architecture.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
RIPARIAN PROPER FUNCTIONING CONDITION A Tool for Integrating the Fundamental Sciences into Collaborative Decision-Making.
Environmental & Natural Resources EN4.01 – Describe careers in the environmental and natural resources industry.
Proposition 1 Workshop: the Grant Application Process July 2015.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
…empowering communities through modeling and adaptive management Adaptive Management Conservation Strategies for Restoring Ecosystems.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
Conservation Provisions of the 2002 Farm Bill Farm Security and Rural Investment Act of 2002.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
Regional Peer Learning Workshop: Accelerated Landscape Restoration Siuslaw Stewardship Model and Collaborative Engagement.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Introduction to the Regional Conservation Partnership Program (RCPP) June 10, 2016 Carol Rivera– Program Manager An Equal Opportunity Provider and Employer.
USDA -Natural Resources Conservation Service
Critical Linkages: Identifying Culvert Replacement Priorities to Maintain Connectivity of Cold Water Streams in the Face of Climate Change Scott Jackson,
Project Learning Tree Project Learning Tree is an education program designed for teachers and others working with youth from pre-school through 12th grade.
Chesapeake Bay Program Budget & Finance Workgroup Meeting
INDOT Storm Water Management
2018 SPECIAL AWARDS.
Latin America and Caribbean Region
Federal-aid Highway Program
Presentation transcript:

INTEGRATING WILDLIFE AND AQUATIC ORGANISMS IN LARGE DESIGN AND CONSTRUCTION PROJECTS Terry Brennan, PE Tonto National Forest August 30, 2006

Who am I? From the Tonto National Forest ADOT (Arizona Department of Transportation) Program Manager 4 Full Time Forest Service Personnel all paid for by ADOT under Agreement Working with ADOT projects for the last twelve years

Optimum Standards Fish/ aquatic organism passage River/stream continuity Wildlife passage

CTIP PROJECT SUMMARY Agency: US Forest Service Project Title: Aquatic Organism Passage Training Description: Conduct courses on inventory and assessment procedures, FishXing software use, including ranking the crossings for biological significance. Conduct courses on site assessment and design including geomorphic and biological considerations, stream simulations. Accomplishment/Status To Date: Workshops on stream simulation design are being held at five locations in FY Contact: Technology & Development Center

Designing for Aquatic Organism Passage at Road-Stream Crossings Salem Missouri May 15-19, 2006 The Missouri Chapter of the American Fisheries Society, USDA Forest Service, and the Missouri Department of Conservation will co-sponsor a continuing education workshop May 15-19, in Salem Missouri. The workshop is designed for interdisciplinary three or four person teams including engineers, hydrologists, fish biologists, and aquatic ecologists. Attendees are encouraged to arrange their own teams, but individuals will be accommodated. Course Goals: Participants in this intensive interdisciplinary workshop will learn the necessary skills to design stream-crossing structures that will accommodate aquatic organism passage, provide more natural stream processes and channel function, and maximize the long-term durability and stability of the structure. Although the primary design approach at this workshop will be stream simulation, other design approaches will be discussed and compared. Participants will work in interdisciplinary teams throughout the workshop to resolve aquatic organism passage scenarios at different stages of the site assessment/ design process. A one day field trip to multiple road-stream crossing sites will complement and reinforce workshop materials as participants identify, assess, and discuss the various aquatic, geomorphic/hydrologic, and engineering issues at each site. One of the visited field sites will be used in a class design exercise. Workshop Objectives: Relate the importance of maintaining aquatic and semi-aquatic organism passage and ecosystem connectivity through road crossing structures, including the transport of water, woody debris, and sediment.

d_Wildlife/Interim_Guidelines_for_Aquatic_Organism_Passage_Through_Strea m_Crossing_Structures_in_Vermont.pdf d_Wildlife/Interim_Guidelines_for_Aquatic_Organism_Passage_Through_Strea m_Crossing_Structures_in_Vermont.pdf d_Wildlife/Interim_Guidelines_for_Aquatic_Organism_Passage_Through_Strea m_Crossing_Structures_in_Vermont.pdf d_Wildlife/Interim_Guidelines_for_Aquatic_Organism_Passage_Through_Strea m_Crossing_Structures_in_Vermont.pdf htm

NOW WHO SAYS WE HAVE A CONNECTIVITY PROBLEM

How To Get To Win / Win For Large Construction Highway Projects

Objective: To Build or reconstruct a linear feature that has the least impact on the Natural Environment

Highway 260 realignment. Clearing stage.

So what’s a win/win definition? Highway proponent Project accomplished on time and within budget Resource Agency Enhances or at least minimizes the impact of the project

Getting to WIN / WIN Identify your desired future conditions Be early in the project Think Construction and Contractors Activities What can I take home?

Desired Future Conditions What are you wishing you could do? –Trailhead –Water for public use –Interpretive Site –Fence a riparian –Environmental past abuse repaired –Less roadkill of animals –Wildlife water source –Reconstruct a wetland

Be Early –It’s important Build a solid foundation

Be Early –It’s important Build a solid foundation Timeframe – Important steps can easily be two years before ground disturbing activity Identify your issues and concerns And Get them into the NEPA Document –Animal migration corridors –Key/critical habitat –Generalities not necessarily specifics

Getting to WIN / WIN Impacts that need to be addressed By the Land Management Agency And what’s in it for me?

Material Balance Waste –Interpretive sites –Contractor staging areas Borrow –Boat Ramp Safety obstacle –Reconstruct Wetland – Wildlife Pool in Mo 147,000 cy borrow

Water Construction –May require up to 1MM + gallon per day

Water Resource Management

Water for Compaction

Solutions that we have used on the Tonto National Forest Commercial or private well Surface water from reservoirs Excess surface water from Creek during winter runoff Effluent treatment plant CAP canal

Staging Areas Allow the contractor to put footprint of your project in place –NEPA clearances completed Might get paved Water Needed intersection Utilities

Access Identify where you will allow and what remains at contract completion

Choose Low Maintenance materials for solutions Fix it right the first time More money available in STP than in other sources later Bioengineering solutions Pure engineering answer vs Natural Material

Give all the criteria and info you have For a crossing –How High? –How long? –Skylight? –Cover Requirements for smaller species

Erosion Control Develop SWPPP as part of the contract documents Is there a use for Sedimentation Basins after project completed, ie WL drinker? Erosion Control vs Sedimentation Control –Allow sediment basins to be outside of the footprint of the permanent disturbance

Bridge Impacts Even thought you have a bridge, not all bridges are constructed alike… –Attached is a quick guide on the advantages /disadvantages and impacts of different types of structures

Contract Documents Plans and Specs –Include everything you can think of (including those mentioned today) and have a solution that is defensible in the contract

Take home How to get to Win / Win When it comes to schedule or budget, schedule is usually more critical to an engineer There seems to always be more money, but the public expects timely progress. Targets (scheduled construction) are critical

Take home How to get to Win / Win Get agreements of impacts in contract before contractor starts construction

Take home How to get to Win / Win FHWA is a good partner –FHWA is trying to be better stewards through their actions and guideance –Exemplary Ecosystem Initiative Projects Get your project ideas here and then implement them See what might be possible

Take home How to get to Win / Win Co-sponsor award applications for Highway agency Give them all the credit