An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation.

Slides:



Advertisements
Similar presentations
Critique of PU A&T Site Plan Alain L. Kornhauser, PhD 11/29/
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
Full Kornhauser. Full Kornhauser Issues Not surprisingly, tunneling to Palmer Square is no easy matter. The tunnel route must go under road infrastructure,
Index The Region: East Tunnel 8 Av / Fulton St IND – Completed8 Av / Fulton St IND – Completed 8 Av / Fulton St IND – Service8 Av / Fulton St IND – Service.
Module 3 SMART PARKING. Module 3 Smart Parking Introduction This is one of seven Transit Oriented Development training modules developed by the Regional.
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
The Role of Universities in Advancing Advanced Transit Alain L. Kornhauser Chairman, Advanced Transit Association (ATRA) Professor, Operations Research.
1 PRINCETON FUTURE January 11, 2011 PRINCETON BRANCH TRANSPORTATION ISSUES Jack May.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Silver Line: Coming Soon Serving Reston to Largo via the District of Columbia Washington Metropolitan Area Transit Authority October 19, 2013 Presentation.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
Addressing The Dinky Terminus Must Move Issue Alain L. Kornhauser Montadale Circle Township.
The Role of Universities in Advancing Advanced Transit Alain L. Kornhauser Chairman, Advanced Transit Association (ATRA) Professor, Operations Research.
Circulation Solutions that Preserve the Current Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
RET565 – Construction Technology & Infrastructure Dr AHMAD HILMY ABDUL HAMID School of Housing, Building & Planning.
Access & Circulation to a Moved Dinky Terminus Alain L. Kornhauser 24 Montadale Circle Princeton Township.
1 WHY STREETLINE? The Clemson University Story: A holistic approach to creating sustainable, cost effective parking and transportation management solutions.
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
{ Increasing Campus Safety in Parking Lots Prepared By: Hilary Palmer, Audrey Richards, Jordan Korte and Cecilia Carrillo.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Module 3 SMART PARKING 1. Module 3 Smart Parking Goals for Smart Parking Balance parking supply and demand Consider innovative parking management policies.
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
Connie Ruth, EPA Best Workplaces for Commuters The Advantages of Excellent Commuter Benefits Why your University or College Should Achieve the Best Workplaces.
10 Easy Ways Arlington Provides Excellent Transit Information to Customers National Capital Region Transportation Planning Board Regional Bus Subcommittee.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Urban Planning & Community Design Considerations in an Era of Driverless Cars By Alain L. Kornhauser Professor, Operations Research & Financial Engineering.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Write down one word that comes into your thought when you read the following word: 15 Feb 2008 R. Shanthini Transport.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Portland North Small Starts Alternatives Analysis Coordination Meeting June 15, 2009.
Circulation Solutions for Alexander-University Congestion Alain L. Kornhauser 24 Montadale Circle Princeton Township.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
September 25, 2010 Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale Circle.
Alain L. Kornhauser, PhD Professor, Operations Research & Financial Engineering Director, Program in Transportation Faculty Advisor, Princeton Autonomous.
Chittenden County Park and Ride and Intercept Plan Public Meeting February 17, 2010.
Calle Real Campus Design Guidelines. Five-Step Process 1999 Board Direction, create a five phase process--- –Phase 1: Determine Space Needs –Phase 2:
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Slides for Nov 1 Planning Board Meeting. The Arts Campus Can be built without touching the Dinky.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
September 30, 2010 Whereas, Ultimate Accessibility Through Modernization and Extension of the Dinky to Palmer Square Alain L. Kornhauser Resident, Montadale.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Why a Bus Transit to Workplace Study? COST TO OWN A VEHICLE.
Safety Is Everyone’s Responsibility May Today’s Agenda Central Corridor Light Rail Overview Safety Outreach Program –Do’s and Don’ts –Safety video.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Complete Streets Training
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
Regional Roads Committee
Center City Connector 101.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Big-time Implications of SmartDrivingCars (…Trucks & Buses)
Advanced Transit Automation:
A&M Association of Commuter Transportation July 31, 2007
SmartDrivingCars & Older People:
Making Sure We’re on the Same Page…
Big-time Implications of SmartDrivingCars (…Trucks & Buses)
Analysis of Walk Distances to Major Venues from existing and proposed station locations by Alain L. Kornhauser 12/18/12 Format of labels: Name (Walk Distance.
Regional Rail What is Missing? Metro-North NJ Transit LIRR
Advanced Transit Automation:
Radical Improvements for the Area's Transportation System
Presented at Princeton Future Princeton Public Library, Princeton NJ
Presentation transcript:

An Advanced Transit Alternative for The Princetons Alain L Kornhauser 24 Montadale circle Board Chair Advanced Transit Association Founder ALK Transportation Technologies, Inc. Professor, Operation Research & Financial Engineering Director, Transportation Program Faculty Advisor, Princeton Autonomous Vehicle Engineering

What Exists Today The general problem – Transportation corridors form barriers to pedestrian movements – Solutions: Soften the barrier – Locally reduce the speed of the Transport systems and created pedestrian and vehicle crossings. That is typically the least cost solution, and tends to deliver the least value. Eliminate the barrier – Elm Drive public road running through the campus: University bought it and closed it. – College road ran into the campus, closed it. – Original Dinky station at Blair Arch: Move it out of the way – Create a grand entrance into Princeton between the Passenger and Freight Buildings, Move it – Desire “E-W” pedestrian access from Forbes and access to Parking Garage: Move it. – Provide grade separation; Place the transport system above or below the pedestrian system » Park Avenue North of Grand Central Station was elevated above the NY central tracks » For years I’ve suggested that Washington road be placed in a cut then covered between College Walk and Williams Street. The added value tom the campus would easily outweigh the costs however, there are some that believe that Washington Road will eventually go the way of Elm Drive so that it is un

What Exists Today The specific problem – Two right-of-ways, Alexander Road and The Dinky, penetrate Princeton University lands, thus forming two barriers to pedestrian and vehicular accessibility. – Because Alexander Road serves cars, little is being done about that barrier, except some distant thoughts that it should be diverted to Springdale road; heaven forbid!! – Princeton is essentially 99 & 44/100% Auto captive – What we have now is as much as we are going to do with the automobile, are there other opportunities? We are maxed out by the automobile. Can we have substantially more visitors, more employment more commercial activity – The University is insisting that the Dinky has to move, again! Are there other solutions?

What Exists Today The Opportunity – Two right-of-ways, Alexander Road and The Dinky, penetrate Princeton University lands, thus forming two barriers to pedestrian and vehicular accessibility. – Because Alexander Road serves cars, little is being done about that barrier, except some distant thoughts that it should be diverted to Springdale road; heaven forbid!! – The University is insisting that the Dinky has to move, again! Are there other solutions?

The Visionary Solution Take advantage of the 100 vertical feet of grade change between the Canal and Nassau Street. Re-grade the tracks into a progressive cut so that it passes under Faculty Road, continues below grade to the current station and all the way to Blair Arch, tunnels under Blair Arch and between Alexander Hall/Presbyterian Church and Holder to an underground terminus under the Kiosk at Palmer Square. The section between Blair Arch and the Lot 7 garage is covered to restore the existing pedestrian environment between 1901 and Little, and all of the pedestrian amenities of Arts Plaza and provide for all of the E-W pedestrian movement Other sections could be covered as needed when needed further south The vehicular technology upgraded to automated technology as exists today at JFK – Provide demand responsive shuttle 20/7 operation meeting EVERY train with minimal transfer time. – Readily construct an intercept parking facility at Route 1 with Capital costs: $50 - $100M costs, with Incremental Community Benefits at least $100M. O&M costs equivalent to today’s Dinky but serve more than twice as many riders – 2,500 users per day: 1,000 Princeton->NEC commuters (walk&ride, bike&ride, kiss&ride, park&ride); 400 reverse commuters NEC->Princeton; 300 WW/Princeton Jct ->Princeton commuters; 500 US1Parking->Princeton; 300 day-trippers NEC-> Princeton – Average fare of $2/ride generates $10k/day operating revenue; opportunities for secondary revenue of possibly $5k/day. Incremental Benefits : – Cross-platform super-convenient minimal-delay transfer brings the Princeton Junction train station to the center of Princeton. – Places the center of Princeton within Walk access Manhattan, Newark Airport, Newark, Trenton, New Brunswick, all stops along the River Line, Philadelphia, Washington DC. – Opportunity to capture visitors and commuters at new US 1 parking facility substantially reduces congestion on Alexander Road, Washington Road, Princeton Pike and Nassau Street. – Service to Nassau Street allows system to become mode-of-choice to Princeton for those living within walk&ride and bike&ride of Princeton Jct train station. – Creates a synergy between Princeton Jct Transit Village and Princeton.