EURISOL Transition period 2009-2013 MYRRHA and ISOL@MYRRHA Piet Van Duppen K.U.Leuven and ISOLDE-CERN on behalf of the EURISOL Project Office EURISOL Transition period 2009-2013 MYRRHA and ISOL@MYRRHA
EURISOL What is EURISOL? Multi-user capabilities Up to 150 AMeV for 132Sn 3 x 100 kW targets (REX-ISOLDE, SPIRAL ~ few kW HIE-ISOLDE ~ 10kW, TRIUMF ~ 50 kW) 1 x 4 MW converter (fission) target (SPIRAL-2 ~ 200kW, SPES ~ 100 kW) 3 x post-accelerators: 150 A.MeV 132Sn for secondary fragmentation 1-5 A.MeV Coulomb barrier nuclear physics ~ 1 MeV nuclear astrophysics ~ keV ground states, solid-state physics, etc. Cost: 1.3 B€ 3 235U Design Study finished: ~400 person-yrs, ~ 33M€ - (documents/report available on www.eurisol.org) LINAC: H, D, He and A/q=2 ions up to 1 A GeV
The “Transition” Period (2010-2013) update/shape the physics case/instrumentation perform further R&D for RIB production/acceleration contact with funding and political bodies EURISOL on the ESFRI list and EURISOL Preparatory Phase The EURISOL project office: Overall coordination of EURISOL related actions Yorick Blumenfeld (chair), Alberto Facco, Marek Lewitowicz, PVD The EURISOL collaboration: MoU between all laboratories interested in EURISOL (in preparation)
The “Transition” Period (2010-2013) The EURISOL User Group and the EURISOL Network in ENSAR: EURISOL User Group will federate scientific community and update physics case; elected executive committee: A. Bonaccorso, chair EURISOL Network focuses on R&D at current facilities and fund workshops and town meetings; 105 k€; leader Y. Blumenfeld Task1: R&D coordination (Y. Kadi) Task 2: Physics & Instrumentation (A. Bonaccorso) Workshops/topical meetings – town meetings: Catania 9-11 December 2009 – Nuclei in the r-process region (~40 part.) (http://www.df.unipi.it/~angela/top_all_19dic.pdf) - Valencia 21-23 February 2011 – N=Z region (~70 part.) - Lisbon Fall 2012: town meeting and topical meeting on light nuclei - CERN, Geneva: June 27-28, 2011: EURISOL-NET on R&D coor. - 2013: topical meeting - 2014: Final town meeting
The “Transition” Period (2010-2013) The EURISOL work package in TIARA: - Define/Prepare R&D platforms for EURISOL (270 k€, S. Bousson – Orsay) Requests to NuPNET: R&D through National Funding Agencies (see also S. Gales: NuPECC meeting Paris): - Three proposals submitted: Accelerators – Charge Breeding – Target-Ion Sources systems (requested 1.25 M€) Workpackage 9: Test Infrastructure and Accelerator Research Area
Timescale for EURISOL 2010-2013 : Transition period; contacts with funding agencies and political bodies 2013 : Application to be included in ESFRI list (support from NuPECC) 2013 : Call for preparatory phase 2014-2017 : EURISOL Preparatory Phase 2017-2019 : Preparation of TDR 2020-2025 : Construction 2025 : First Beam
Timeline for European ISOL RIB facilities 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 Existing ISOL facilities REX-ISOLDE, SPIRAL, EXCYT, ALTO, JYFL, … Construction+ commissioning HIE-ISOLDE SPES SPIRAL2 2nd generation ISOL facilities RIBs from 2nd generation ISOL facilities ESFRI List EURISOL Collaboration MoU EURISOL Preparatory Phase Construction + Commissioning TDR RIB Adapted from M. Lewitowicz and P. Butler
Courtesey Lucia Popescu (SCK•CEN, Belgium) MYRRHA at SCK•CEN Copyright © 2011 SCK•CEN Courtesey Lucia Popescu (SCK•CEN, Belgium)
MYRRHA - Concept Total investment (estimation 2009): 960 M€ Sustainable fission energy: Accelerator Driven System (ADS) Fast neutron spectrum: neutron irradiated silicon Health care: production of radioisotopes for nuclear medicine Fundamental research: ISOL@MYRRHA
MYRRHA Project Schedule 2010-2014 Front End Engineering Design 2015 Tendering & Procurement 2016-2018 Construction of components & Civil engineering 2019 On site assembly 2020-2022 Commissioning 2023 Progressive start-up 2024- Full exploitation The project MYRRHA supported by the Belgian government (March 2010) on the ESFRI roadmap (Nov. 2010) on the “European Sustainable Nuclear Industrial Initiative – ESNII” roadmap (Nov. 2010) on the NuPECC roadmap (Dec. 2010)
ISOL@MYRRHA Pre-Conceptual Design protons: 2-4 mA, CW, 600 MeV 2 gap Spoke 352 MHz 5 cell Elliptical 704 MHz Beam splitter 17 MeV 100 MeV 200 MeV 600 MeV ~ 100-200 mA, ~DC ISOL@MYRRHA Ruggedized target: e.g. Ta, UC/C Sustainable 1+ ion source: RFQ cooler and buncher Pure and intense RIBs of ~50-60 keV Low-resolution mass separator High-resolution mass separator
Facility Characteristics based on proven technology (largely based on experience at ISOLDE and TRIUMF) can deliver: pure RIB: selective ionization, chemistry, M/DM > 10.000 intense RIB (x100 compared to the present ISOLDE ‘standard’ RIB) RIB of good ion optical quality optimal experimental conditions/lay-out/support (green-field facility!) extended beam times with stable operation complementary to ISOL and In-Flight facilities => unique possibilities for experiments that: need very high statistics involve many time consuming systematic measurements hunt for very rare events have an inherent limited detection efficiency
ISOL@MYRRHA Project at SCK•CEN ISOL@MYRRHA is an integral part of the MYRRHA project Delivery of the proton beam by MYRRHA Support by ISOL@MYRRHA in house group at SCK•CEN Building an international users group Workshops on R&D for RIB production and the physics case (update) Search for national and international support: ~40 M€ - ISOL@MYRRHA consortium More information: http://isolmyrrha.sckcen.be 2020 Assembly & Installation 2017-2019 Manufacturing of components & construction 2016 Awarding contracts 2021-2022 Commissioning 2012-2015 Front End Engineering Design ISOL@MYRRHA 2023 - Exploitation 2011 Pre- Conceptual