Vision and Voyages For Planetary Science in the Decade 2013-2022 Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres.

Slides:



Advertisements
Similar presentations
Session 3: Advances in Our Understanding of Mars Searching for Evidence of Past or Present Life on Mars David J. Des Marais NASA, Ames Research Center.
Advertisements

NASA Mission Directorates. 0 NASA's mission is to pioneer future space exploration, scientific discovery, and aeronautics research. NASA’s Mission.
Plutonium-238 for Solar System Exploration Status Leonard A. Dudzinski Program Executive NASA Headquarters, Washington, DC Presentation to NASA Astronomy.
Moonrise Hubble Science Briefing May 1, 2014 Bonnie Meinke, PhD the surprisingly diverse array of moons in our solar system.
Astronomy190 - Topics in Astronomy Astronomy and Astrobiology Lecture 3 : A Tour of the Solar System Ty Robinson.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
Welcome! To The Restructured, Reconfigured, NASA Advisory Council! Introductory slide courtesy of Harrison Schmitt, NAC Chairman.
1 January 17, 2007 NASA IPY Interest NASA has a strong interest in IPY themes Present environmental status of the polar regions Quantify and understand.
What Is Astrobiology And Why Do We Care? Bruce Jakosky Laboratory for Atmospheric and Space Physics University of Colorado at Boulder 9 February 2010.
1 Briefing to the CAA on the Terrestrial Planet Finder (TPF): Finding and Characterizing Earth-like Planets Zlatan Tsvetanov, NASA Program Scientist Charles.
The ionosphere of Mars: A community white paper for the planetary decadal survey Paul Withers (Boston University), J. Espley (NASA/GSFC), R. Lillis (University.
NASA Living with a Star Program Targeted Research & Technology Steering Committee NASA HQ & LWS TR&T Update September 16, 2008 Doug Rowland On Detail to.
Mercury from Mariner 10 outbound 1974 Radius 2,440 km Mars – Two images showing effects of dust storms Radius 3,396 km Mars Rovers, Mars Reconnaissance.
1 NASA Agency Overview NASA’s Vision and Fundamental Physics in Space Paul Hertz Chief Scientist, Science Mission Directorate NASA International Workshop.
The Gas Giants Astronomy 311 Professor Lee Carkner Lecture 16.
The Gas Giants Astronomy 311 Professor Lee Carkner Lecture 16.
Providing Access for US Astronomers to the Next Generation of Large Ground Based OIR Telescopes 1.Scientific Potential 2.Current Design Efforts 3.Complementarity.
NASA Missions. The Moon APOLLO (1963 – 1972) Goal: To put a man on the Moon Apollo 8 and 10: Orbited Moon Apollo 11 – 17 (except 13): Landed on Moon.
This PowerPoint is all about space and different planets. It will all so talk about the different objects in space.
Mars Program Update James L. Green Acting Director, Mars Exploration Program NASA Headquarters May 13, 2014 NOTE ADDED BY JPL WEBMASTER: This content has.
© 2011 Pearson Education, Inc. Chapter 6 The Solar System.
Planetary Science Decadal Survey David H. Smith Space Studies Board, National Research Council Mars Exploration Program Analysis Group Providence,
“ PHOBOS - SOIL ” Phobos Sample Return Mission 1. goals, methods of study A.Zakharov, Russian academy of sciences Russian aviation.
© 2010 Pearson Education, Inc. Chapter 7 Our Planetary System Earth, as viewed by the Voyager spacecraft.
Solar System J. Wunderlich, Ph.D. Image from
SolarSystem2012: The Planetary Science Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey MEPAG Monrovia, CA, 30.
JAXA’s Space Exploration Scenario for the Next Twenty Years - Science Strategy - Masato Nakamura Steering Committee of Space Science Institute of Space.
Solar System Missions Division Solar Orbiter Next major Solar and Heliospheric mission ESA ILWS flagship Now with the Inner Heliospheric Sentinels.
SMD Suborbital Science in the Planetary Science Division Philippe Crane Planetary Atmospheres Discipline Scientist LCANS Meeting 28 April 2007.
Our Solar System and Its Origin. 6.1 A Brief Tour of the Solar System Our Goals for Learning What does the solar system look like?
Earth, as viewed by the Voyager spacecraft. © 2010 Pearson Education, Inc. 7.1 Studying the Solar System Our goals for learning:  What does the solar.
© 2010 Pearson Education, Inc. Chapter 7 Our Planetary System Earth, as viewed by the Voyager spacecraft.
National Aeronautics and Space Administration International Engagement & Partnerships: Building on the Past, Boldly Collaborating for the Future Goddard.
1 Planetary Science Division Update Presentation at the Planetary Data System James L. Green Director, Planetary Science Division March 28, 2007.
1 Planetary Science Division Update Presentation to the Planetary Data System Management Council James L. Green Acting, Director PSD (on detail from GSFC)
Exo-Planet Task Force (ExoPTF) Jonathan Lunine (LPL) Stephen Ridgway (NASA)
Planetary Motion By Carol Greco. Why do planets move the around the sun the way they do? First you need to understand that scientists have discovered.
© 2011 Pearson Education, Inc. Chapter 6 The Solar System.
John Peoples for the DES Collaboration BIRP Review August 12, 2004 Tucson1 DES Management  Survey Organization  Survey Deliverables  Proposed funding.
2011: TWO MAJOR DEVELOPMENTS IN ASTRONOMY AND THE SPACE PROGRAM.
LIFE: Traceability Matrix Team Members JPL: P. Tsou, I. Kanik NASA Ames: C. McKay UoW: D. Brownlee Mission Cost Since formal costing is yet to be performed,
Brian Dewhurst Feb 9, 2007 Board on Physics and Astronomy NRC Astrophysics Update AAAC Feb 8-9, 2007 Brian Dewhurst BPA Staff.
Mars in the Planetary Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman,
Presented to Kepler Pre-Launch Educator Workshop January 31, 2009 Shari Asplund Discovery and New Frontiers Programs Education and Public Outreach Manager.
Mars Exploration Program Response to: Vision and Voyages for Planetary Science in the Decade Michael Meyer MEPAG June 2011 Lead Scientist, Mars.
INTO THE NEW YEAR January 3, Objectives Reaffirm principles –China’s interest in exploring ESIP structure prompted review of ESIP evolution (more.
MATT Report Feb. 20, Philip Christensen (Chair) Lars Borg (ND-SAG Co-Chair) Wendy Calvin (MSO SAG Chair) Mike Carr Dave Des Marais (ND-SAG Co-Chair)
Evaluating New Candidate Landing Sites on Mars: Current orbital assets have set the new standard for data required for identifying and qualifying new Mars.
MEPAG September 2010 Doug McCuistion Director, Mars Exploration Program.
PROPOSED 2018 Joint Rover Mission Plans for Proposed 2018 NASA & ESA Joint Rover Mission Landing Site Selection Matt Golombek Mars Exploration Program.
ADASS the Planning and Scheduling Perspective Roadmap: - How planning and scheduling fits in at ADASS - ADASS planning and scheduling posters and presentations.
Goals for this Meeting: Day 1 Day 2 Update the community on progress in the exploration of Mars, including NASA and the European Space Agency (missions.
MEPAG Meeting October 4, 2012 Monrovia, CA Dave Des Marais, MEPAG Chair NOTE ADDED BY JPL WEBMASTER: This content has not been approved or adopted by,
Lecture Outlines Astronomy Today 7th Edition Chaisson/McMillan © 2011 Pearson Education, Inc. Chapter 6.
NASA Missions. The Moon APOLLO (1963 – 1972) Goal: To put a man on the Moon Apollo 8 and 10: Orbited Moon Apollo 11 – 17 (except 13): Landed on Moon.
CSRP NASA Workshop NASA’s Revised Budget. CSRP NASA Workshop NASA’s New Vision and Objectives (as of January 14, 2004)  VISION  The fundamental goal.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
ST9 TPWS OSS Science Needs Overview Robert M. Nelson Lead Scientist New Millennium Program Offcie California Institute of Technology, Jet Propulsion.
The Galileo Mission. What is it? The Galileo was a spacecraft. It was the first Jupiter Orbiter and was sent in It is a NASA spacecraft mission.
Jim Bell Cornell University The Planetary Society July 30, 2009 Mars Exploration : Rationale and Principles for a Strategic Program Preliminary.
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
Nick Weber ZONES OF HABITABILITY AROUND NORMAL STARS.
Planetary Science Decadal Survey David H. Smith Space Studies Board, National Research Council Mars Exploration Program Analysis Group Arlington,
HNRS w/ Dr. H. Geller Physical Origins
Recent and future space missions
James L. Green Acting, Director PSD (on detail from GSFC)
Recent and future space missions
HNRS w/ Dr. H. Geller Physical Origins
Visions and Voyages: The Planetary Decadal Survey
Presentation transcript:

Vision and Voyages For Planetary Science in the Decade Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey Steve Squyres Cornell University Chairman, Planetary Science Decadal Survey

2 What Is A Decadal Survey? Once every ten years, at the request of NASA and NSF, the National Research Council carries out a “decadal survey” for planetary science. The decadal survey involves broad participation from the planetary science community. It is the primary scientific input that NASA and NSF use to design their programs of planetary science and exploration. Once every ten years, at the request of NASA and NSF, the National Research Council carries out a “decadal survey” for planetary science. The decadal survey involves broad participation from the planetary science community. It is the primary scientific input that NASA and NSF use to design their programs of planetary science and exploration. This decadal survey applies to the decade from 2013 to 2022.

3 Science Comes First: All recommendations must be first and foremost science-driven. Community Involvement: Solicit community input throughout the process. Transparency and Openness: Make the process as open and visible to all interested members of the community as possible. Science Comes First: All recommendations must be first and foremost science-driven. Community Involvement: Solicit community input throughout the process. Transparency and Openness: Make the process as open and visible to all interested members of the community as possible. Guiding Principles

4 The decadal survey was governed by a “Statement of Task”. The Statement of Task was provided by NASA and NSF, with input from OMB. The Statement of Task emphasized that all recommendations should be science-driven. It also placed a strong emphasis on recommending a plan that can be carried out in full using funding projected to be available. The decadal survey was governed by a “Statement of Task”. The Statement of Task was provided by NASA and NSF, with input from OMB. The Statement of Task emphasized that all recommendations should be science-driven. It also placed a strong emphasis on recommending a plan that can be carried out in full using funding projected to be available. Statement of Task

5 Steering Group Steve Squyres, Chair Larry Soderblom, Vice Chair Vice Chairs of Panels 9 others Steering Group Steve Squyres, Chair Larry Soderblom, Vice Chair Vice Chairs of Panels 9 others Inner Planets Panel Ellen Stofan, Chair Steve Mackwell, Vice Chair 10 others Inner Planets Panel Ellen Stofan, Chair Steve Mackwell, Vice Chair 10 others Outer Planet Satellites Panel John Spencer, Chair Dave Stevenson, Vice Chair 10 others Outer Planet Satellites Panel John Spencer, Chair Dave Stevenson, Vice Chair 10 others Mars Panel Phil Christensen, Chair Wendy Calvin, Vice Chair 9 others Mars Panel Phil Christensen, Chair Wendy Calvin, Vice Chair 9 others Outer Planets Panel Heidi Hammel, Chair Amy Simon-Miller, Vice Chair 9 others Outer Planets Panel Heidi Hammel, Chair Amy Simon-Miller, Vice Chair 9 others Primitive Bodies Panel Joe Veverka, Chair Hap McSween, Vice Chair 10 others Primitive Bodies Panel Joe Veverka, Chair Hap McSween, Vice Chair 10 others Committee Organization

6 Inputs From The Community The goal of the decadal survey is to seek out the community’s views, and build a consensus around those views. More than a dozen town hall meetings were held: AGU (twice), LPSC (twice), DPS (twice), EPSC, RAS, AbSciCon, NLSI, LEAG, VEXAG, OPAG, MEPAG, CAPTEM, etc. The community submitted 199 white papers with 1669 individual authors and endorsers. The white papers were the main input to the decadal process, and many white paper authors were invited to present at panel meetings. Open sessions of meetings were webcast and put online. Draft report was reviewed by 18 peer reviewers. The goal of the decadal survey is to seek out the community’s views, and build a consensus around those views. More than a dozen town hall meetings were held: AGU (twice), LPSC (twice), DPS (twice), EPSC, RAS, AbSciCon, NLSI, LEAG, VEXAG, OPAG, MEPAG, CAPTEM, etc. The community submitted 199 white papers with 1669 individual authors and endorsers. The white papers were the main input to the decadal process, and many white paper authors were invited to present at panel meetings. Open sessions of meetings were webcast and put online. Draft report was reviewed by 18 peer reviewers.

7 Crosscutting Themes The community inputs led to identification of three Crosscutting Themes for planetary science: - Building New Worlds: Understanding solar system beginnings - Planetary Habitats: Searching for the requirements for life - Workings of Solar Systems: Revealing planetary processes through time The report expands on these themes, identifying key scientific questions for each. The community inputs led to identification of three Crosscutting Themes for planetary science: - Building New Worlds: Understanding solar system beginnings - Planetary Habitats: Searching for the requirements for life - Workings of Solar Systems: Revealing planetary processes through time The report expands on these themes, identifying key scientific questions for each.

8 Building New Worlds What were the initial stages, conditions and processes of solar system formation and the nature of the interstellar matter that was incorporated? How did the giant planets and their satellite systems accrete, and is there evidence that they migrated to new orbital positions? What governed the accretion, supply of water, chemistry, and internal differentiation of the inner planets and the evolution of their atmospheres, and what roles did bombardment by large projectiles play? What were the initial stages, conditions and processes of solar system formation and the nature of the interstellar matter that was incorporated? How did the giant planets and their satellite systems accrete, and is there evidence that they migrated to new orbital positions? What governed the accretion, supply of water, chemistry, and internal differentiation of the inner planets and the evolution of their atmospheres, and what roles did bombardment by large projectiles play?

9 Planetary Habitats What were the primordial sources of organic matter, and where does organic synthesis continue today? Did Mars or Venus host ancient aqueous environments conducive to early life, and is there evidence that life emerged? Beyond Earth, are there modern habitats elsewhere in the solar system with necessary conditions, organic matter, water, energy, and nutrients to sustain life, and do organisms live there now? What were the primordial sources of organic matter, and where does organic synthesis continue today? Did Mars or Venus host ancient aqueous environments conducive to early life, and is there evidence that life emerged? Beyond Earth, are there modern habitats elsewhere in the solar system with necessary conditions, organic matter, water, energy, and nutrients to sustain life, and do organisms live there now?

10 Workings of Solar Systems How do the giant planets serve as laboratories to understand the Earth, the solar system and extrasolar planetary systems? What solar system bodies endanger and what mechanisms shield the Earth’s biosphere? Can understanding the roles of physics, chemistry, geology, and dynamics in driving planetary atmospheres and climates lead to a better understanding of climate change on Earth? How have the myriad chemical and physical processes that shaped the solar system operated, interacted, and evolved over time? How do the giant planets serve as laboratories to understand the Earth, the solar system and extrasolar planetary systems? What solar system bodies endanger and what mechanisms shield the Earth’s biosphere? Can understanding the roles of physics, chemistry, geology, and dynamics in driving planetary atmospheres and climates lead to a better understanding of climate change on Earth? How have the myriad chemical and physical processes that shaped the solar system operated, interacted, and evolved over time?

11 Process and Timeline Steering Group 3, Irvine Feb 22-24, 2010 Steering Group 3, Irvine Feb 22-24, 2010 Steering Group 4, DC Jul 13-15, 2010 Steering Group 4, DC Jul 13-15, 2010 Mars 3, Boulder Apr , 2010 Mars 3, Boulder Apr , 2010 Primitive Bodies 3, Knoxville Apr 26-28, 2010 Primitive Bodies 3, Knoxville Apr 26-28, 2010 Giant Planets 3, Boston May 4- 6,2010 Giant Planets 3, Boston May 4- 6,2010 Satellites 3, Boulder; Apr 12-14, 2010 Satellites 3, Boulder; Apr 12-14, 2010 Steering Group 1, DC Jul Steering Group 1, DC Jul Steering Group Conference Calls Inner Planets 1, DC Aug , 2009 Inner Planets 1, DC Aug , 2009 Mars 1, Tempe Sep 9-11, 2009 Mars 1, Tempe Sep 9-11, 2009 Primitive Bodies 1, DC Sep 9-11, 2009 Primitive Bodies 1, DC Sep 9-11, 2009 Giant Planets 1, DC Aug 24-26, 2009 Giant Planets 1, DC Aug 24-26, 2009 Satellites 1, DC Aug 24-26, 2009 Satellites 1, DC Aug 24-26, 2009 Inner Planets 2, Irvine Oct 26-28, 2009 Inner Planets 2, Irvine Oct 26-28, 2009 Mars 2, Pasadena Nov 4-6, 2009 Mars 2, Pasadena Nov 4-6, 2009 Primitive Bodies 2, Irvine Oct 28-30, 2009 Primitive Bodies 2, Irvine Oct 28-30, 2009 Giant Planets 2, Irvine; Oct 26-28, 2009 Giant Planets 2, Irvine; Oct 26-28, 2009 Satellites 2, Irvine; Sep 21-23, ‘09 Satellites 2, Irvine; Sep 21-23, ‘09 Mission Studies and Cost Estimation Steering Group 2, Irvine Nov 16-18, 2009 Steering Group 2, Irvine Nov 16-18, 2009 Steering Group 5, DC Aug 3-4, 2010 Community White Papers Inner Planets 3, Boulder Oct 26-28, 2009 Inner Planets 3, Boulder Oct 26-28, 2009

12 Mission Studies Based on the science identified via white papers and other community inputs, 25 mission candidates were chosen for detailed study. Studies were performed by APL, GSFC, and JPL. Each study team included at least one science representative from the appropriate panel. The studies involved considerable time and effort. All study reports have been posted on the Web and are included in the decadal survey report. Based on the science identified via white papers and other community inputs, 25 mission candidates were chosen for detailed study. Studies were performed by APL, GSFC, and JPL. Each study team included at least one science representative from the appropriate panel. The studies involved considerable time and effort. All study reports have been posted on the Web and are included in the decadal survey report.

13 Cost and Technical Evaluations After studies were completed, high- priority mission candidates were subjected to a detailed Cost and Technical Evaluation (CATE) by Aerospace Corporation. CATE estimates are based on multiple methodologies, including actual costs of analogous past missions, to avoid the optimism inherent in other cost estimation processes. The result is some sticker shock! But realism is essential. All costs are in $FY’15. After studies were completed, high- priority mission candidates were subjected to a detailed Cost and Technical Evaluation (CATE) by Aerospace Corporation. CATE estimates are based on multiple methodologies, including actual costs of analogous past missions, to avoid the optimism inherent in other cost estimation processes. The result is some sticker shock! But realism is essential. All costs are in $FY’15.

14 Mission Prioritization Criteria - Science return per dollar - Programmatic balance - Technological readiness - Availability of appropriate trajectories Process - All priorities and recommendations were guided strongly by community inputs. - Prioritization within the subject area of each panel was done by the panel. - Cross-panel prioritization was done by the steering group. - All priorities and recommendations were arrived at by achieving strong consensus. Criteria - Science return per dollar - Programmatic balance - Technological readiness - Availability of appropriate trajectories Process - All priorities and recommendations were guided strongly by community inputs. - Prioritization within the subject area of each panel was done by the panel. - Cross-panel prioritization was done by the steering group. - All priorities and recommendations were arrived at by achieving strong consensus.

15 It All Has To Fit (Data and projections provided by NASA)

Recent Developments

17 Recommendations of the Decadal Survey

18 Continue missions in development, and missions in flight subject to senior review. Discovery: - MESSENGER (in flight) - Dawn (in flight) - Kepler (in flight) - GRAIL (in development) New Frontiers: - NF-1: New Horizons (in flight) - NF-2: Juno (in development) - NF-3: TBD (to be selected soon) Others: - Cassini (in flight) - ODY/MRO/MER (in flight) - MSL/MAVEN (in development) - LADEE (in development) Continue missions in development, and missions in flight subject to senior review. Discovery: - MESSENGER (in flight) - Dawn (in flight) - Kepler (in flight) - GRAIL (in development) New Frontiers: - NF-1: New Horizons (in flight) - NF-2: Juno (in development) - NF-3: TBD (to be selected soon) Others: - Cassini (in flight) - ODY/MRO/MER (in flight) - MSL/MAVEN (in development) - LADEE (in development) Ongoing and Approved Missions

19 Increase the NASA planetary R&A budget by 5% above the total finally approved FY’11 expenditures in the first year, and then by 1.5% above inflation each successive year. All subsequent recommendations are consistent with this funding increase. Increase the NASA planetary R&A budget by 5% above the total finally approved FY’11 expenditures in the first year, and then by 1.5% above inflation each successive year. All subsequent recommendations are consistent with this funding increase. Research and Analysis Program

20 Technology Development Technology development is fundamental to a vigorous and sustainable program of planetary exploration. A planetary exploration technology development program should be established, and carefully protected from incursions on its resources. This program should be funded at 6-8% of the total NASA Planetary Science Division budget. All recommendations are consistent with this level of technology funding. Technology development is fundamental to a vigorous and sustainable program of planetary exploration. A planetary exploration technology development program should be established, and carefully protected from incursions on its resources. This program should be funded at 6-8% of the total NASA Planetary Science Division budget. All recommendations are consistent with this level of technology funding.

21 The Discovery Program has produced spectacular and cost-effective science, and can continue to do so well into the future. The Discovery Program

22 Continue the Discovery program at its current funding level, adjusted for inflation, with a cost cap per mission also adjusted for inflation (i.e., to $500 million FY’15). Assure a regular, predictable, and rapid (≤ 24-month) cadence of Discovery AOs and selections. No recommendations are made for Discovery mission priorities; this is left to the AO and peer review process. Continue the Discovery program at its current funding level, adjusted for inflation, with a cost cap per mission also adjusted for inflation (i.e., to $500 million FY’15). Assure a regular, predictable, and rapid (≤ 24-month) cadence of Discovery AOs and selections. No recommendations are made for Discovery mission priorities; this is left to the AO and peer review process. The Discovery Program

23 Joint mission with ESA: NASA provides most of the science payload, and the launch. Carry out this mission as long as this division of responsibilities with ESA is preserved. Joint mission with ESA: NASA provides most of the science payload, and the launch. Carry out this mission as long as this division of responsibilities with ESA is preserved. Mars Trace Gas Orbiter

24 New Frontiers missions can address high priority and technically complex science goals that are beyond the capabilities of Discovery missions. The New Frontiers Program

25 The New Frontiers program of PI-led strategic missions has been a success, and should continue. Change the New Frontiers cost cap to $1.0 billion FY’15, excluding launch vehicle costs. Select New Frontiers missions NF-4 and NF-5 in the decade The New Frontiers program of PI-led strategic missions has been a success, and should continue. Change the New Frontiers cost cap to $1.0 billion FY’15, excluding launch vehicle costs. Select New Frontiers missions NF-4 and NF-5 in the decade The New Frontiers Program

26 Select NF-4 from among: - Comet Surface Sample Return - Lunar South Pole-Aitken Basin Sample Return - Saturn Probe - Trojan Tour and Rendezvous - Venus In Situ Explorer No relative priorities among these are assigned. If the selected NF-3 mission addresses the goals of one of these, remove that one from the list. Select NF-4 from among: - Comet Surface Sample Return - Lunar South Pole-Aitken Basin Sample Return - Saturn Probe - Trojan Tour and Rendezvous - Venus In Situ Explorer No relative priorities among these are assigned. If the selected NF-3 mission addresses the goals of one of these, remove that one from the list. New Frontiers 4 Selection

27 For NF-5: - The remaining candidates from NF-4 - Io Observer - Lunar Geophysical Network Again, no relative priorities are assigned. For NF-5: - The remaining candidates from NF-4 - Io Observer - Lunar Geophysical Network Again, no relative priorities are assigned. New Frontiers 5 Selection

28 1.Begin NASA/ESA Mars Sample Return campaign: Descoped Mars Astrobiology Explorer-Cacher (MAX-C) 2.Detailed investigation of a probable ocean in the outer solar system: Descoped Jupiter Europa Orbiter (JEO) 3.First in-depth exploration of an Ice Giant planet: Uranus Orbiter and Probe 4.Either Enceladus Orbiter or Venus Climate Mission (no relative priorities assigned) 1.Begin NASA/ESA Mars Sample Return campaign: Descoped Mars Astrobiology Explorer-Cacher (MAX-C) 2.Detailed investigation of a probable ocean in the outer solar system: Descoped Jupiter Europa Orbiter (JEO) 3.First in-depth exploration of an Ice Giant planet: Uranus Orbiter and Probe 4.Either Enceladus Orbiter or Venus Climate Mission (no relative priorities assigned) Flagship Missions (in priority order)

29 Flagship Priority 1: MAX-C The view expressed by the Mars community is that Mars science has reached a point where the most fundamental advances will come from study of returned samples. MAX-C will perform in situ science and collect and cache samples, beginning a three-mission campaign to return samples from Mars. Mars Sample Return is enabled by ESA participation throughout the campaign. Of the three missions in the campaign, only MAX- C is recommended for The campaign is multi-decadal, and its priority is based on its anticipated total science return and total cost. The view expressed by the Mars community is that Mars science has reached a point where the most fundamental advances will come from study of returned samples. MAX-C will perform in situ science and collect and cache samples, beginning a three-mission campaign to return samples from Mars. Mars Sample Return is enabled by ESA participation throughout the campaign. Of the three missions in the campaign, only MAX- C is recommended for The campaign is multi-decadal, and its priority is based on its anticipated total science return and total cost.

30 The Need For A Descope The CATE estimate for the cost to NASA of MAX-C/ ExoMars is $3.5 billion. This is too large a fraction of the planetary budget. Fly MAX-C only if it can be conducted at a cost to NASA of ≤ $2.5 billion FY’15. Descopes must be equitable between NASA and ESA. It is critical that the partnership with ESA be preserved. If the goal of $2.5 billion cannot be achieved, MAX-C should be deferred to a subsequent decade or cancelled. The CATE estimate for the cost to NASA of MAX-C/ ExoMars is $3.5 billion. This is too large a fraction of the planetary budget. Fly MAX-C only if it can be conducted at a cost to NASA of ≤ $2.5 billion FY’15. Descopes must be equitable between NASA and ESA. It is critical that the partnership with ESA be preserved. If the goal of $2.5 billion cannot be achieved, MAX-C should be deferred to a subsequent decade or cancelled. No alternate plan for Mars exploration is recommended. If MAX-C cannot be carried out for a cost to NASA of ≤ $2.5 billion then other Flagship missions take precedence.

31 Europa’s probable ocean may be the best candidate in the solar system beyond Earth for a presently habitable environment. Orbital tour of Jupiter system, followed by km Europa orbit Instrumentation to characterize Europa’s tidal flexure, the thickness of the ice shell, and the character of the surface and subsurface. Europa’s probable ocean may be the best candidate in the solar system beyond Earth for a presently habitable environment. Orbital tour of Jupiter system, followed by km Europa orbit Instrumentation to characterize Europa’s tidal flexure, the thickness of the ice shell, and the character of the surface and subsurface. Flagship Priority 2: JEO

32 The Need For A Descope The CATE estimate for the cost of JEO is $4.7 billion. This is too large a fraction of the planetary budget. Fly JEO only if changes to both the mission and the NASA planetary budget make it affordable without eliminating other recommended missions: - This will require a reduction in the mission’s scope and cost - JEO will require a new start that increases the overall budget of NASA’s Planetary Science Division The CATE estimate for the cost of JEO is $4.7 billion. This is too large a fraction of the planetary budget. Fly JEO only if changes to both the mission and the NASA planetary budget make it affordable without eliminating other recommended missions: - This will require a reduction in the mission’s scope and cost - JEO will require a new start that increases the overall budget of NASA’s Planetary Science Division Immediately begin an effort to find major cost reductions in JEO, with the goal of minimizing the necessary planetary science budget increase. JEO science would be enhanced by conducting the mission jointly with ESA’s proposed Ganymede Orbiter mission. Immediately begin an effort to find major cost reductions in JEO, with the goal of minimizing the necessary planetary science budget increase. JEO science would be enhanced by conducting the mission jointly with ESA’s proposed Ganymede Orbiter mission.

33 Flagship Priority 3: Uranus Orbiter and Probe Uranus and Neptune belong to a distinct class of planet: the Ice Giants - Small hydrogen envelopes - Dominated by heavier elements - The only class of planet that has never been explored in detail Orbiter to perform remote sensing of planet’s atmosphere, magnetic field, rings, and satellites. Atmospheric entry probe. Potential for new discoveries comparable to Galileo at Jupiter and Cassini at Saturn. Uranus is preferred over Neptune for for practical reasons involving available trajectories, flight times, and cost. Uranus and Neptune belong to a distinct class of planet: the Ice Giants - Small hydrogen envelopes - Dominated by heavier elements - The only class of planet that has never been explored in detail Orbiter to perform remote sensing of planet’s atmosphere, magnetic field, rings, and satellites. Atmospheric entry probe. Potential for new discoveries comparable to Galileo at Jupiter and Cassini at Saturn. Uranus is preferred over Neptune for for practical reasons involving available trajectories, flight times, and cost.

34 Technology Development Priorities High priority missions for future study and technology development: - Titan Saturn System Mission - Neptune Orbiter and Probe - Mars Sample Return Lander and Orbiter High priority missions for future study and technology development: - Titan Saturn System Mission - Neptune Orbiter and Probe - Mars Sample Return Lander and Orbiter

35 The Cost-Constrained Program

36 The Recommended Program (JEO costs shown do not include descope)

37 If Less Funding Is Available… Descope or delay Flagship missions. Slip New Frontiers and/or Discovery missions only if adjustments to Flagship missions cannot solve the problem. Place high priority on preserving R&A and technology development funding. Descope or delay Flagship missions. Slip New Frontiers and/or Discovery missions only if adjustments to Flagship missions cannot solve the problem. Place high priority on preserving R&A and technology development funding.

38 Implications Protect R&A, Technology, Discovery and New Frontiers. Fly a 2018 NASA/ESA Mars mission only if: - The cost to NASA is no more than $2.5 billion. - It leads realistically to sample return. If Mars ‘18 does not meet these criteria, second priority is JEO. (There is no recommended “Plan B” for Mars.) If JEO is not affordable, third priority is Uranus Orbiter and Probe ($2.7 billion). If UOP is not affordable, fourth priority is Venus Climate Mission ($2.4 billion) or Enceladus Orbiter ($1.9 billion). Protect R&A, Technology, Discovery and New Frontiers. Fly a 2018 NASA/ESA Mars mission only if: - The cost to NASA is no more than $2.5 billion. - It leads realistically to sample return. If Mars ‘18 does not meet these criteria, second priority is JEO. (There is no recommended “Plan B” for Mars.) If JEO is not affordable, third priority is Uranus Orbiter and Probe ($2.7 billion). If UOP is not affordable, fourth priority is Venus Climate Mission ($2.4 billion) or Enceladus Orbiter ($1.9 billion).

39 Launch Vehicle Costs Launch vehicle costs are rising, and tend to be a larger fraction of mission costs than they once were. Steps can be considered to reduce launch costs: - Use dual manifesting (two missions on a single launch). - Make block buys across NASA, or with other agencies (e.g., DoD). - Exploit technolgies that reduce flight system mass, allowing use of smaller launch vehicles. Steps can be considered to reduce launch costs: - Use dual manifesting (two missions on a single launch). - Make block buys across NASA, or with other agencies (e.g., DoD). - Exploit technolgies that reduce flight system mass, allowing use of smaller launch vehicles.

40 Plutonium-238 JEO should switch to Advanced Stirling Radioisotope Generators (which require substantially less plutonium) for power production. ASRG development should receive attention comparable to a flight project. JEO should switch to Advanced Stirling Radioisotope Generators (which require substantially less plutonium) for power production. ASRG development should receive attention comparable to a flight project. The amount of plutonium-238 available for spacecraft power systems is shrinking alarmingly. Without a restart of plutonium-238 production, it will be impossible for NASA to carry out important planetary missions, particularly in the outer solar system. The amount of plutonium-238 available for spacecraft power systems is shrinking alarmingly. Without a restart of plutonium-238 production, it will be impossible for NASA to carry out important planetary missions, particularly in the outer solar system. ASRG

41 Interaction With Human Exploration Some solar system bodies are likely targets of future human exploration: - The Moon - Asteroids - Mars and its moons It is vital to maintain the science focus of peer-reviewed NASA missions to these bodies. Some solar system bodies are likely targets of future human exploration: - The Moon - Asteroids - Mars and its moons It is vital to maintain the science focus of peer-reviewed NASA missions to these bodies. Both the Space Science program and the human exploration program can benefit from carefully crafted intra-agency partnerships (LRO is a good recent example).

42 Data distribution and archiving: - Maintain and upgrade Planetary Data System capabilities. Education and outreach: - Set aside ~1% of each flight project budget for education and outreach activities. Telescope facilities: - Continue NASA support for IRTF, Keck, Goldstone, Arecibo, and VLBA. The Deep Space Network: - Expand capabilities to meet requirements of recommended missions. - Maintain high-power X and Ka band uplink, and S, X, and Ka band downlink at all three complexes. Sample curation and laboratory facilities: - Consider the full costs to NASA of receiving and curating samples when planning sample return missions. - Before samples return, establish a program to develop instruments and facilities for sample analysis. Data distribution and archiving: - Maintain and upgrade Planetary Data System capabilities. Education and outreach: - Set aside ~1% of each flight project budget for education and outreach activities. Telescope facilities: - Continue NASA support for IRTF, Keck, Goldstone, Arecibo, and VLBA. The Deep Space Network: - Expand capabilities to meet requirements of recommended missions. - Maintain high-power X and Ka band uplink, and S, X, and Ka band downlink at all three complexes. Sample curation and laboratory facilities: - Consider the full costs to NASA of receiving and curating samples when planning sample return missions. - Before samples return, establish a program to develop instruments and facilities for sample analysis. Supporting NASA Activities

43 National Science Foundation Ground-based observatories supported by NSF are essential to planetary astronomy. Continued NSF support for ground-based observatories is crucial. NSF’s Office of Polar Program supports important meteorite collection and planetary analog studies in Antarctica. This support should continue. NSF also funds laboratory research that is important to planetary science. Expanded NSF funding of laboratory research in planetary science is recommended. The Large Synoptic Survey Telescope (LSST) has the potential to make major contributions to planetary science, particularly for studies related to the origin, evolution, and dynamics of primitive bodies. Timely completion of LSST, and its use for planetary science, are strongly encouraged. Ground-based observatories supported by NSF are essential to planetary astronomy. Continued NSF support for ground-based observatories is crucial. NSF’s Office of Polar Program supports important meteorite collection and planetary analog studies in Antarctica. This support should continue. NSF also funds laboratory research that is important to planetary science. Expanded NSF funding of laboratory research in planetary science is recommended. The Large Synoptic Survey Telescope (LSST) has the potential to make major contributions to planetary science, particularly for studies related to the origin, evolution, and dynamics of primitive bodies. Timely completion of LSST, and its use for planetary science, are strongly encouraged.

44 Upcoming Events Town hall meetings: - Mountain View, CAMarch 15 - College Park, MDMarch 25 - Boston, MAMarch 26 - Boulder, COMarch 29 - Tucson, AZMarch 30 - New York, NYMarch 31 - St. Louis, MOApril 6 - Pasadena, CAApril 12 - Chicago, ILApril 13 - Orlando, FLWeek of March 28 Analysis group briefings: - OPAG, Alexandria VAMarch 17 - MEPAG, LisbonJune 16 International briefings: - EGU, ViennaApril 4 - JpGU, Chiba CityWeek of May 23 Town hall meetings: - Mountain View, CAMarch 15 - College Park, MDMarch 25 - Boston, MAMarch 26 - Boulder, COMarch 29 - Tucson, AZMarch 30 - New York, NYMarch 31 - St. Louis, MOApril 6 - Pasadena, CAApril 12 - Chicago, ILApril 13 - Orlando, FLWeek of March 28 Analysis group briefings: - OPAG, Alexandria VAMarch 17 - MEPAG, LisbonJune 16 International briefings: - EGU, ViennaApril 4 - JpGU, Chiba CityWeek of May 23

45