The Bellarine Railway Geelong Steam Preservation Society The Blues Train at Suma Park - Feb 2013.

Slides:



Advertisements
Similar presentations
Lesson 34: Trains Go on Rails! new words think about it text.
Advertisements

Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
Pacer Preservation Society Preserving a Pacer for the future Developments & Progress Peter Dickinson PPS Vice-Chairman.
Manitoba School Bus Pre-Trip Inspection
Boiler Operation Procedures
CE 515 Railroad Engineering
The Bellarine Railway Geelong Steam Preservation Society The Blues Train at Suma Park - Feb 2013.
PURBECK RAILWAY CIRCLE. Show No.6: “The Birth, Life and Death of “MOTALA” by Mike Walshaw Swanage Railway Signal & Telegraph Dept.
Assembled Vehicle Inspection (AVI) Process
Rise of the Railways Resource provided by © Midland Railway Study Centre, The Silkwww.mylearning.org Mill, Derby's Museum of Industry.
STI Test Facility: Photos Taken in Test Area and Two Labs: 18 May 2006.
Bob cat Skid steer loader
On March 14, 2007, our Locomotive Shop staff replaced two tires on the main drive wheels of the Canadian Pacific The old tires were “sweated” off,
Modifications to the Lionel 0-6-0t Switcher
DMK Mechanical Services Ltd Pipework Solutions… Service Excellence.
By Nicole and Keith. How does a steam locomotive work? Fire is produced in the firebox which burns wood, coal or oil. Hot gases released by the combustion.
Nelson Hydro Downtown Conversion July 26, 2010 Project Overview.
King Fahd University of Petroleum and Minerals Mechanical Engineering Department Coop Training : Central Heavy Equipment Department In Aramco King Fahd.
On March 14, 2007, the Steamtown Locomotive Shop staff replaced two tires on the main drive wheels of the Canadian Pacific The old tires were 'sweated'
Alistair Murdoch Key Account Manager Finning UK Ltd.
Click to edit Master title style Slide 1 Improving the Operational Safety of Road Going Heavy Vehicles in Mining Operations A Case Study 22 nd to 25 th.
Module 4: Railway Equipment
1 26th May 2011 Tonbridge Station Julie Houghton.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Coal, Steam, and Iron Ingredients for an Industrial Revolution.
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
XIAJING GENG HONG W. LI QINGSONG TANG SIYU WU How do Steam Locomotives work?
Periodic Maintenance Periodic Maintenance : The “Life Blood” Of The Service Department.
Department of Infrastructure, Energy and Resources COTMA Conference August 08 Craig Hoey Rail Safety Unit.
Autoclaves in the School of Life Sciences at Warwick Janine Kimpton – Technical Services Centre Manager Dave Hibberd – Workshop & Infrastructure Manager.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part III – Aircraft Ground Training Section 2 –
Operations Railroad Communica- tions Hazmat & Safety Personnel.
PPT PROCEDURES TO USE A TRACTOR PPT
How It Works Diesel Locomotive Air Breaking Dynamic Breaking.
Burton Cotton Gin Museum The Oldest Operating Cotton Gin in America.
Revision. Why coal was so important It was the fuel of the time It was used for heating houses I It generated steam to power railways, ships and machines.
Second Lesson.  By the end of the 17th century, wood was becoming less available. England and Ireland had once been covered by deciduous forests. For.
{. Transportation revolutionized the distribution of products, the mass movement of people, and the spreading of ideas/cultures by creating a more effective.
What tests are necessary to make sure your kegs are being cleaned, sanitized and filled correctly By Andrew J. Brewer
Mechanized Equipment. Subpart G, Most Frequently Cited (1999) (a)(9)(ii) No reverse alarm signal on earthmoving equipment (a)(9)(I) No.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
TAIL LIGHT CLEANING SPRAYS FOR WATER CARTS Queensland Mining Industry Health & Safety Innovation Awards Presentation by: Brett Illguth 4 August 2006 THIESS.
Auto Mechanics Tools Piston Ring Compressor.
NUMI MINOS MINOS Far Detector Installation & Commissioning Jeff Nelson MNHEP DoE Visit September, 2002.
Regional Response Team IX EPA Southern California Office Signal Hill, CA 8/13/2014 Presented by: Neil Gambow - COO Kelso Technologies Inc.
Heat Engines A gasoline engine is a form of a heat engine, e.g. a 4-stroke engine INTAKE stroke: the piston descends from the top to the bottom of the.
George Stephenson. EARLY LIFE George Stephenson was born on 9 June His home was at Wylam, near Newcastle-upon-Tyne. Near where he lived there were.
RAIL TRANSPORT. 1.1 BACKGROUND OF RAIL TRANSPORT.
1 3E-03 Fire Syringe RAPID COMPRESSION IS ADIABATIC GIVING RAPID RISE OF AIR TEMPERATURE IN THE CHAMBER WHICH EXCEEDS THE IGNITION TEMPERATURE OF THE FLAMMABLE.
Heavy Rescue Partnership Bob Dagless Head of Emergency Response.
George Stephenson. About George Stephenson’s life George Stephenson was an engineer. He built steam locomotives for the first railways. Sometimes people.
George Stephenson was an engineer. He built steam locomotives for the first railways. Sometimes people call him 'the Father of the Railway'.engineerlocomotives.
George Stephenson. Early life George Stephenson was born on 9 June His home was at Wylam, near Newcastle-upon- Tyne. Near where he lived there were.
Hydraulic System Components
INSTALL INSULATION IN BOILER PLANT PROJECT SECTIONS: 1.VALVE JACKETS 2.BOILER REFRACTOR JACKETS 3.PIPING INSULATION / PVC.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
1 Address: UIC Safety Database (SDB) System and Results.
GE Transportation Freight, Fuel, & Emissions Introduction to Engineering Design EDGSN 100 Section 002 The Inglorious Brezniaks / (Team 2) (Mahesh P. Pai,
Mechanized Equipment 1.
Truck Brake Systems.
George Stephenson  Why is he famous? George Stephenson was an engineer. He built steam locomotives for the first railways. Sometimes people call him 'the.
GEORGE STEPHENSON.
Energy Agriculture Power and Technology
OBJECTIVES Discuss the procedure recommended for brake drum removal.
The Basics of Overhead Crane Pre-op Inspections
ACPA – Safety Chairman’s Award
Stoughton Parts Sales 2019 Customer Appreciation Event
Presentation transcript:

The Bellarine Railway Geelong Steam Preservation Society The Blues Train at Suma Park - Feb 2013

The Bellarine Railway Geelong Steam Preservation Society Built in 1919, by Andrew Barclay, (B/N 1543) Kilmarnock, Scotland; Pozieres was one of a group of locomotives acquired by BHP for operations in and around the smelters at Port Pirie. The locomotive is named after a WW1 battlefield where the ANZACs fought in Pozieres was preserved after it was retired by BHP and transferred to the Puffing Billy Preservation Society Museum at Menzies Creek in In 2009, three locomotives were released by PB from the Museum to The Bellarine Railway including Pozieres and these locomotives arrived at Queenscliff 6 September 2009 and the following illustrates the restoration that followed: Restoration of Pozieres commenced in early 2010 and it was moved to the Queenscliff Workshop 23 Feb Restoration included a full strip down of the locomotive, removal of tanks, cab, wheels, and all underframe gear. Both pistons were broken and were renewed. The wheels were machined to a new flange profile and axles were tested Boiler was inspected, numerous stays replaced plus patches in the throat plate. Springs and running gear were overhauled The steam brake was replaced with a No4 brake and Westinghouse C type air compressor fitted Locomotive was fitted with a turbo generator and full lighting Tanks and coal bunker were heavily rebuilt. Cab was rebuilt including a varnished timber ceiling Hydrostatic lubricator installed, as well as lubrication centralisation between the frames. Locomotive was cosmetically overhauled Pozieres underwent a hydro-test and was then steamed, to the satisfaction of the Boiler Inspector in July It moved under its own steam in August 2011 and after testing and trials was accredited for passenger operations by Public Transport Victoria in October Pozieres officially entered service on 29 October 2011 in a celebration shared with the members of the Puffing Billy Preservation Society and Museum. Since then Pozieres has travelled approx kilometres without incident on The Bellarine Railway, and is a proud addition to the societies fleet of 13 steam locomotives.

The Bellarine Railway Geelong Steam Preservation Society Pozieres at Menzies Creek; Winched onto the low loader, Rolled off at The Bellarine Railway

The Bellarine Railway Geelong Steam Preservation Society 1604 in as-purchased cndition prior to lifting at Rosewood Top L: New Air brake installation Top Centre: First fire in nearly 50 years Top Right, Bottom Left: Steam Test Bottom Centre: Setting the safety valves

The Bellarine Railway Geelong Steam Preservation Society First Moves Pozieres moved for the first time under its own power August 2011

The Bellarine Railway Geelong Steam Preservation Society 1604 in as-purchased cndition prior to lifting at Rosewood The Pozieres restoration team – Joe Atkinson, Doug Lee, Wayne Pickett (Manager) and Darcy Peterson

The Bellarine Railway Geelong Steam Preservation Society 1604 in as-purchased cndition prior to lifting at Rosewood Pozieres is a fine representative of a typical British Industrial locomotive, with an historic significance to the Anzac tradition. The locomotive served BHP for many years and will continue to thrill future generations in its new operational home on The Bellarine Railway