Systems Engineering Breakouts George Angeli. Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans.

Slides:



Advertisements
Similar presentations
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Advertisements

Plans for LSE-130 through CD-2 Gregory Dubois-Felsmann SLAC National Accelerator Laboratory.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
Software Quality Assurance Plan
Verification Planning and Compliance Matrices Brian Selvy Wednesday, August 13, :30 – 5:00 p.m. Phoenix West Conference Room.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Using UML, Patterns, and Java Object-Oriented Software Engineering Royce’s Methodology Chapter 16, Royce’ Methodology.
May 17, Capabilities Description of a Rapid Prototyping Capability for Earth-Sun System Sciences RPC Project Team Mississippi State University.
Project Change Management
SE curriculum in CC2001 made by IEEE and ACM: Overview and Ideas for Our Work Katerina Zdravkova Institute of Informatics
Group Members JimyLeah Castro - Data Analysis Jeremy Chan - Hardware Architecture Eric Lee - Software Development Sae Yoon - Signal Analysis.
An framework for model-driven product design and development using Modelica Adrian Pop, Olof Johansson, Peter Fritzson Programming Environments Laboratory.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
Software Developer By: Charlie Edwards Period 6 th Mrs. Truong.
Configuration Management Managing Change. Points to Ponder Which is more important?  stability  progress Why is change potentially dangerous?
Utilities Planning Group CIP Tracking System Jim Broome, PE Chief Engineer.
Control Software Integration German Schumacher T&S Software Lead.
Framework for Compliance, Verification, and Non-Conformance George Angeli LSST All-Hands Meeting Bremerton August 17, 2015.
LSST Scheduler status Francisco Delgado Sr. Software Engineer Telescope & Site.
Software Quality Assurance Activities
Verification and Validation on LSST Brian Selvy LSST All-Hands Meeting Bremerton August 17, 2015.
Software System Engineering: A tutorial
Configuration Management (managing change). Starter Questions... Which is more important?  stability  progress Why is change potentially dangerous?
PROJECT MANAGEMENT ITERATION REPORT Iteration:2014.xx Date:mm/dd/yy.
LSST Scheduler requirements
Observing Cadences Workshop Organized by NOAO and LSST w/
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
Eighth Hour Lecture 7:30 – 8:20 pm, Thursday, September 13 Workflows of the Process (from Chapter 8 of Royce’ book)
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Overview of LSST Tools and Simulations.
LSST: Preparing for the Data Avalanche through Partitioning, Parallelization, and Provenance Kirk Borne (Perot Systems Corporation / NASA GSFC and George.
1 FINAL DESIGN REVIEW | TUCSON, AZ | OCTOBER 21-25, 2013 Name of Meeting Location Date - Change in Slide Master Title of Presentation Andrew Connolly LSST.
KS3 Phase4 Client Server Monitoring System October 1, 2008 by Stephen, Seema, Kam, Shpetim.
Example Template for Project Presentation
Lecture Introduction to Software Development SW Engg. Development Process Instructor :Muhammad Janas khan Thursday, September.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
LSST Scheduler construction plan Francisco Delgado Sr. Software Engineer Telescope & Site.
The Active Optics System S. Thomas and the AO team.
November 2013 Review Talks Morning Plenary Talk – CLAS12 Software Overview and Progress ( ) Current Status with Emphasis on Past Year’s Progress:
Copyright © 1997 Pangea Systems, Inc. All rights reserved. Pathway Tools Training Course.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
Design of an Integrated Robot Simulator for Learning Applications Brendon Wilson April 15th, 1999.
Software Project Management (SEWPZG622) BITS-WIPRO Collaborative Programme: MS in Software Engineering SECOND SEMESTER /1/ "The content of this.
K-12 Teaching Application Support and Software Ongo-08 Client Dr. John Lamont Prof. Ralph Patterson Advisor Dr. Gregory Smith Team Members Sean Boyle Tony.
Proposal: staged delivery of Scheduler and OpSim V1 (2016) meet most of the SRD requirements – Deliver a system that can be extended with an improved scheduler.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
System Performance Metrics and Current Performance Status George Angeli.
VirtualWorks Format and Objectives The engineering process of VirtualWorks encompasses a set of functions to build a software system in line with the.
East Africa Tradeoff Analysis Workshop. Workshop Program Program Monday Introduction to TOA approach Tuesday AM Conceptual framework Tuesday PM Introduction.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Project Life Presented by Chuck Ray, PMP ITS Project Manager.
CS646: Software Design and Architectures Introduction and Overview †  Definitions.  The general design process.  A context for design: the waterfall.
1 Board Telescope & Site Tucson, Arizona July 18-20, 2011 LLST Control Software Review Resources Tucson, January
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
Commissioning Planning
Verification Matrix Process
Role of The Software Development Plan (SDP)
Systems Engineering, Verification, and Commissioning for LSST George Z
LSST Commissioning: FY18 Planning
Chuck F Claver LSST System Scientist & Commissioning Lead
Write less; please more pictures!
OCS Scheduler Status Francisco Delgado T&S Software Manager
NCSA Plan for DPP: Construction and Operations of the LSST Data Facility Don Petravick, Paul Domagala, Margaret Johnson Joint Technical Meeting March.
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
OCS Scheduler Status Francisco Delgado T&S Software Manager
Software & Hardware for Wavefront Estimation Pipeline Development Te-Wei Tsai Software Engineer Joint Technical Meeting March 6, 2017.
Software Development Process
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT– WEEK 4 Mumtaz Ali Rajput +92 – 301-
Enhanced State Estimation by Advanced Substation Monitoring
Key Issues and Today’s Goals
Presentation transcript:

Systems Engineering Breakouts George Angeli

Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans for detailed commissioning activities Middleware Software Demonstration – Dave Mills Overview of the Java / C++ APIs; introduction to salgenerator tools Demonstration of Telemetry, Command/Ack/Response simulator Release schedule 3:30pm Technical Operations Concepts – Chuck Claver Tech Operations Concept Document: scope and outline Specific areas of detailed development Exploiting PhoSim for DM Algorithm Development – Chris Walter Simulating sensor effects Algorithms to correct for them

Wednesday 11am Integrated System Database – Andy Connolly Requirements for the integrated systems database and use cases Prototype schema and design of the database Discussion of the design, needs and implementation plan 1:30pm System Performance Metrics/Status – George Angeli Overview and IQ budget IQ Simulation status Throughput budget & estimates 3:30pm Modeling the Cerro Pachon Sky – Chuck Claver Review of current assets running on Cerro Pachon Summary of Visible All Sky Camera data analysis What is needed by simulations and how do we get there? Verification and Compliance Matrices – Brian Selvy LSST V&V Process (LSE-160) review V&V Implementation methodology in SysML Overview of Verification Compliance Spreadsheets

Thursday 11am Visualization Tools, Project-Wide Standards – Gregory Dubois- Felsmann Data visualization needs Visualization tool standards PhoSim Science Applications – John Peterson 1:30pm OpSim Schedule and Development – Andy Connolly 3:30pm Using PhoSim to help with LSST Construction – John Peterson Technical status update of phosim by myself Using phosim in system engineering Verification of PhoSim with prototype sensor data Operational Configuration – Paul Lotz System-wide approach for configuring software components Commands, keys, databases