Power Quality: A Closer Look Joe Watson APPA – Engineering & Operations Technical Conference April 18, 2005.

Slides:



Advertisements
Similar presentations
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
Advertisements

DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Asia Geospatial Forum, PWTC, Kuala Lumpur 25 th September 2013.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Spencer Murray, Sr. Telecom Eng. Distribution Automation.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
CityWorks: Electric Reliability & Advanced Meter Fort Collins
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com Challenges and Solutions for Large-Scale PV Integration on RPU’s Distribution.
FUTURE IN ENERGY. The biggest co-generation high efficiency power plant in Romania, built in Suceava Investment value: over EUR 90 mil Used fuels: natural.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
The Smart Grid Power Quality Power Reliability Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept all rights.
Power Distribution Harmonics Case Study of 285-3F Chiller Plant Michael W. Harmon Principle Engineer Savannah River Nuclear Solutions, LLC Savannah River.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Rulemaking PacifiCorp Responses to ALJ Ruling May 26, 2015.
…While Investing To Achieve Excellence In Reliability 30% Transmission capital investment 03-06; $ millions Distribution capital investment 03-06; $ millions.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
AFCI Reaction to Utility Events. CenterPoint Energy 35 KV Distribution Capacitor Bank – Switched through an automated system.
APPA Engineering and Operations Technical Conference Atlanta, Georgia April 13-18, 2007 “Nailing the Basics” Earns Princeton, IL RP3 Diamond Award.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
SWEDE - April 26 th, Bastrop Tommy Nylec Austin Energy Fusing and Fault Indicator Applications.
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
4/22/2017 WHAT IS THERMOGRAPHY?
APPA 2005 E&O Technical Conference Memphis, TN April 19, 2005
Lecture 1 – Power Quality INTRODUCTION TO POWER QUALITY Power Quality phenomenon-Terms and definitions-Various Power events in power quality - causes for.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Monitoring EMS Infrastructure Ann Moore San Diego Gas & Electric September 13, 2004 EMS Users Group Meeting-St. Louis.
Failure Analysis of the PSTN: 2000 Patricia Enriquez Mills College Oakland, California Mentors: Aaron Brown David Patterson.
2. Terms and definitions1 # Voltage Sags and Interruptions.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Oncor Electric Delivery Intelligent Grid at Oncor Electric Delivery SWEDE Conference Alan Bern – SCADA / Automation Manager May 1, 2008.
Situational Awareness UPDEA - Workshop. Awareness of the Situation 25,623 Alarms in 8 Hours 53 Alarms / min (average) 80% Are consequential Things to.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Steady State Analysis Of A Microgrid Connected To A Power System
Submitted to: Submitted by:
2006 TRANSMISSION CUSTOMER FORUM September 21, 2006 Andrew J. Dearman, III Executive Vice President & Chief Transmission Officer.
132KV GSS PIPAR CITY JODHPUR
McGranaghan/Sabin US Session 2 Block 3 Question 8 Barcelona May Calculating System Events and Using Voltage Sag Benchmarking as a System Performance.
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
WELCOME!. Who is T&T Power Group? WELCOME! Who is T&T Power Group? What can we do for you?
Distribution systems basic techniques and radial networks.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Austin Energy Elevated Requests for High Reliability Service South West Electric Distribution Exchange (SWEDE) May 8, 2015 David Tomczyszyn, P.E. – Distribution.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
About Georgia Transmission Corporation (GTC)
Power Quality at Solar Distributed Generation Facilities
Utility Needs and Smart Grid for Major Storm Events
SUB-STATIONS.
Inverter Disconnects During Transmission Disturbances
Advanced Fuse-Saving Techniques
35kV Assessment SWEDE 2007 May 10, 2007.
An-Najah National University
Nathan Kassees, P.E. Sr. Engineer Oncor Electric Delivery
TxMAG presentation
Presentation transcript:

Power Quality: A Closer Look Joe Watson APPA – Engineering & Operations Technical Conference April 18, 2005

 One of the nations largest 4 service utility providers. ElectricityNatural Gas WaterWastewater  603,025 total customers for all combined services over 470 sq. miles. Electric = 194,369 customers  1,978 employees for all 4 utilities.  Generate up to 77% of our own electricity (633 MW).  More than 2900 miles of distribution lines (70% ug vs. 25% nation avg)  More than 220 miles of transmission lines  19 Transmission Substations, 40 Distribution Substations …just a few facts

Springs Utilities’ Customers  High Tech / R&D  Intel, Atmel, Honeywell, Kaman Science, LSI Logic, Lockheed Martin, Mitsui, Quantum, Ramtron, UTMC Aeroflex, Vitesse  Data/Call Centers  HP, MCI, Oracle, FedEx, Progressive Insurance, T Rowe Price, Qwest  Manufacturing  Western Forge, Metso Minerals, Schlage Lock  Military Installations  NORAD, Fort Carson Army Base, Peterson Air Force Base, Air Force Academy

Springs Utilities’ PQ History  BMI – 8010 PQ Nodes (1993)  Portable Monitoring  Metrosonic PA7, Metrosonic MR4, Dranetz 658, Dranetz-BMI Power Platform  SquareD - Power Logic (1998)  Power Measurement – ION (1999)  Enterprise Software  ION 7700  ION 8500

Where to Monitor  Power Measurement - ION  Monitors at every transmission substation (115kV or 230kV but not 34.5kV) 27 locations  Monitors at customer sites Expand program to offer PQ monitoring service 3 locations Helps to troubleshoot Enhanced Service equipment such as Automatic Transfer and Static Transfer Switches

Communication Challenges  How do we communicate with meters?  RS232  RS485  Phone / Modem  Spread Spectrum radios  Internet

Communication Challenges  How do we communicate with meters?  RS232  RS485  Phone / Modem  Spread Spectrum radios  Internet

What to do with the system?  Disturbance Paging  Disturbance Database  Fault Locating  Waveform Analysis  System Protection / Relaying  Preventative Maintenance  First Response

What to do with the system?  Disturbance Paging  Page includes time stamp, device, magnitude and duration of event  Notify Enhanced Service Engineer on standby as well as other CS Utilities’ personnel.  Provide proactive response to most important customers.  Indicated a system-wide or isolated event.

What to do with the system?  Disturbance Database  First used an Excel database but soon switched to Access  Data is qualified (ie. Was it really an event?)  Compare event with “Outage Database” and “Event Messanger”  The following data is logged: Date/Time Magnitude/Duration Which phases were affected Load affected Event path Cause category and description Event location (grid x-y) Protective Device which operated Outage report number

What to do with the system?  Disturbance Database  Hope to develop indices in order to help rank Capital and O&M projects Outage indexes: SAIFI - System Average Interruption Frequency Index (…how many outages in a year, interruptions/year) SAIDI - System Average Interruption Duration Index (…how many minutes in a year, minutes/year) CAIDI - Customer Average Interruption Duration Index (…how long each outage, minutes/interruption) RBM (Reliability Benchmarking Methodology) index: SARFI %V - System Average RMS Frequency Index Threshold (…how many sags/swells in a year, sags(or swells)/year at threshold level)

What to do with the system?  Disturbance Database  Ranking Substations 12RM6  2004 data  27 events  Zero sags outside ITIC 34NP13  2004 data  56 events  4 sags outside ITIC

What to do with the system?  Disturbance Database  Ranking by category (all events below 90% nominal)  Could also be ranked below 80%, 70%, etc.

What to do with the system?  Fault Locating  Use fault levels and phases to help troubleshoot

What to do with the system?  Waveform Analysis  Use fault levels and phases to help troubleshoot

What to do with the system?  Waveform Analysis  Use fault levels and phases to help troubleshoot Delta/Wye Single phase fault will appear as a phase to phase fault

What to do with the system?  Waveform Analysis  Use fault levels and phases to help troubleshoot

What to do with the system?  System Protection and Relaying  Use fault levels to determine if protection worked as designed. Delta/Wye

What to do with the system?  Preventative Maintenance  Calculating fault on breakers to determine when maintenance is required.  Looking for trends or repetitive events.

What to do with the system?  Preventative Maintenance

What to do with the system?  Rapid Response  Economic Development in Colorado Springs has group of individuals from different departments (Fire, Police, Utilities, etc.) to provide information to companies interested in locating in Colorado Springs.  Many companies are interested in reliability data – outage AND power quality.  Customer meetings  Data is used to document events and discuss with customers.

2001 to Current Summary of Disturbances 1A A A&B - 82

2001 to Current Summary of Disturbances HV01A - 40 HV02A - 13 HV01 A&B Sag due to ATO transfer after event on feeder serving 1A. 2.Technician accidentally tripped ATO. 3.PT fuse failed in LS switchgear.

HV01A & HV02A Exposure (since May 2001)  North Plant – 36 events  34NP2 – 13 Platte bus – 1 12PL PL2 - 7  34NP12 – 2  34NP  34NP20 – 13 13HL1 – 7 13HL2 - 2  34NP24 – 2 12C2 – 1  Rampart – 4 events  34RM2 – 1  34RM3 – 3 12RV4 – 2 12RV5 – 1 Oak Valley Craigmoor Platte Holland Park Rusina Digital Oak Valley Ind Prk Cust Sub North Plant Rampart

Questions?