Estimating Allowable Phosphorus Load to Chatfield Reservoir Jim Saunders WQCD Standards Unit 10 April 2008.

Slides:



Advertisements
Similar presentations
2005 Stream Phosphorus TMDLs to be proposed in July 5th NJR The NJDEPs Division of Watershed Management is seeking stakeholder input on proposed phosphorus.
Advertisements

28 NOVEMBER 2011 SUSTAINABLE WATER MANAGEMENT PLAN TASK 1 – DETAILED WORK PLAN.
TMDL Development for the Floyds Fork Watershed Louisville, KY August 30, 2011.
Agricultural and Biological Engineering SWFREC, UF/IFAS Immokalee.
Water Quality Standards Program Status of Numeric Nutrient Criteria (NNC) Division of Environmental Assessment and Restoration.
EPA’s Guidance on Nutrient Criteria Development
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
Prioritization Workgroup Summary. Workgroup Topics Nutrient results What is a watershed? What is a TMDL? Prioritization methods Basin framework and management.
Questions to answer What is the overall modeling approach (after calibration and background scenarios)? What are the WLA assumptions? How will Avista’s.
The Wisconsin River TMDL: Linking Monitoring and Modeling Ann Hirekatur, Pat Oldenburg, & Adam Freihoefer March 7, 2013 Wisconsin River TMDL Project Team.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Line Efficiency     Percentage Month Today’s Date
Confluence at the Confluence Chatfield Watershed Authority September 22, 2014.
Water Policy in the US and the EU K H Reckhow and C Pahl-Wostl Part I: US Total Maximum Daily Load Program.
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Spring  Types of studies ◦ Naïve before-after studies ◦ Before-after studies with control group ◦ Empirical Bayes approach (control group) ◦ Full.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Model Application for WQS Review Process December 14, 2011 Laura Weintraub.
Hydrologic Statistics
Approaches to Seasonal Drought Prediction Bradfield Lyon CONAGUA Workshop Nov, 2014 Mexico City, Mexico.
1 IDEM Overview of March 14, 2008 Draft Antidegradation Rule Presented at the April 29, 2008 Antidegradation Stakeholder Meeting.
Analysis of Raleigh’s Drought Triggers May 8, 2013 and.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Focus Group Meeting: September 27, 2013 Truckee River Water Quality Standards Review.
Cowichan Lake Storage Assessment – 2015 Final Results Craig Sutherland, M.Sc., P.Eng. July 27, 2015.
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
Shashin Amatya Yi Gao Lauren Reuther INFSYS-6833 Group B Homicide.
Evaluation of Load Translator for Chatfield Reservoir Jim Saunders WQCD Standards Unit 14 February 2008.
Chatfield Reservoir Water Budget Jim Saunders and Jamie Anthony WQCD, Standards Unit 13 Dec 2007.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
Chatfield Reservoir Hydrologic Scenario Development Jim Saunders WQCD Standards Unit 13 March 2008.
Chatfield Reservoir Phosphorus Budget Jim Saunders and Jamie Anthony WQCD, Standards Unit 13 Dec 2007.
Confidential AECOM Environment Draft TMDL for pH Compliance for Barr Lake and Milton Reservoir October 20, 2009 Draft TMDL Review Meeting.
Options, Futures, and Other Derivatives, 4th edition © 1999 by John C. Hull 14.1 Value at Risk Chapter 14.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
Time-Series Forecast Models  A time series is a sequence of evenly time-spaced data points, such as daily shipments, weekly sales, or quarterly earnings.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Lake Powell Operations CRFS Spring 2015 March 25, 2015.
1 Upper Basin Snowpack as of 3/26/2014
Jan 2016 Solar Lunar Data.
Learning objectives To understand the water balance
Japan proposal on schedule
Average Monthly Temperature and Rainfall
Before-After Studies Part I
Mammoth Caves National Park, Kentucky

Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Prepared by Lee Revere and John Large
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
Calendar Year 2009 Insure Oklahoma Total & Projected Enrollment
Electricity Cost and Use – FY 2016 and FY 2017
A Climate Study of Daily Temperature Change From the Previous Day
SC SC SC WS SC S HIS Background document Seminar document
Tutorial 1 Inferential Statistics, Statistical Modelling & Survey Methods (BS2506) Pairach Piboonrungroj (Champ)
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Sep Oct Nov Dec Jan Feb Mar Apr May

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

Estimating Allowable Phosphorus Load to Chatfield Reservoir Jim Saunders WQCD Standards Unit 10 April 2008

Roadmap for Technical Review MonthTopic Sep-07Technical comparison of existing control regulations Oct-07Existing chlorophyll target, incl magnitude, frequency, duration Nov-07Evaluation and discussion of concentration translator Dec-07Water budget and appropriate concentrations for each flow source as precursor to common set of phosphorus loads Jan-08Phosphorus load estimates; produce common set by source Feb-08Evaluation and discussion of load translator Mar-08Hydrologic considerations for TMAL Apr-08Discuss chlorophyll-phosphorus-load linkages as basis for proposal Jun-08WQCD to finalize proposal and circulate Jul-08Notice due Nov-08WQCC RMH

Today  Components and problems  Basis for modeling  Estimates of allowable load  Options for standards

Some Assembly Required…  Standards and goals  Concentration translator (chl-phos)  Load translator Input concentration Retention coefficient  Hydrologic scenario

What’s “broken”?  Chlorophyll goal met consistently  Phosphorus standard is not  They’re supposed to be hard-wired  Is phosphorus irrelevant or is the expectation (straight line) wrong?

Real Issue: too Great Expectations  We expect phosphorus to be a perfect predictor of chlorophyll – to explain all variation in chlorophyll Based on capacity to explain variation among lakes  It doesn’t – much variation is not explained by phosphorus alone In one lake, variation among years comes from many factors

Big Picture for Phosphorus

Phosphorus in Lakes  Nutrient enrichment causes excessive algal abundance  Chlorophyll-phosphorus data from many lakes show strong pattern  In most lake restorations, reducing phosphorus reduces chlorophyll  In case of non-attainment, focus on phosphorus simplifies implementation TMDL development WQBEL determination

Back to Chatfield Data: Distillate or Stew?  Begin with all data Extract essence of chlorophyll-phosphorus relationship with linear regression (ignore unexplained variation) Or, throw all data in the pot and stir well. Assume that any sample equally representative (retain all variation)  How strong are predictors?

Defining What Is Known  Responsiveness of algae to phosphorus captured in each sample (chl:TP)  Retention coefficient measured each year  Create set of all values observed in Chatfield  Assume each measured value equally likely to occur next year or years after….

Deterministic Modeling Approach watershedlakealgae Phosphorus LoadPhosphorus ConcChlorophyll Outcomes111 Datum

Probabilistic Modeling Approach Outcomes1414*14=196millions watershedlakealgae Phosphorus LoadPhosphorus ConcChlorophyll

Probabilistic Model  1 hydrologic scenario  14 input conc.; random draw  14 retention coeff; random draw  Yields 196 “years” of in-lake summer TP conc [=input*(1-R)]  Draw 6 response ratios from set of 83 and take average (millions)  Match summer TP with ratio at random, 10,000 times  Examine distribution of chlorophyll  Adjust input concentration and repeat

What’s the Allowable Load? Assume 1-in-5-yr exceedance frequency  Option 1: 13,655 lbs/y at median inflow Retain the existing phosphorus standard (0.027 mg/L) Reduce chlorophyll standard (11 ug/L) Defend existing water quality conditions  Option 2: 21,438 lbs/y at median inflow Preserve existing chlorophyll standard (17 ug/L) Accept a relaxed phosphorus standard (0.042 mg/L)

Additional Changes and Clarifications in Regulation 38  At least 3 samples from summer months (Jul-Sep)  Samples must be representative of the mixed layer  The allowable exceedance frequency is once in 5 years  The intent of the phosphorus standard is to ensure attainment of the chlorophyll standard

Tasks to be Addressed Later, If Commission adopts Division proposal  Partitioning of allowable load between the two main basins (South Platte and Plum Creek  Allocation of loads within each basin according to the usual format of TMDLs = LA+WLA+MOS  Review of WLAs as appropriate

Next Steps  Discuss relative merits of regulatory options; select one for proposal  Continue discussing technical issues  Meet with Board to outline process and progress  Circulate draft proposal