Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.

Slides:



Advertisements
Similar presentations
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Advertisements

Status of Wastewater Implementation February 20, 2013 Elizabeth Wood Monroe County, Sr. Administrator – Sewer Projects.
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
1 Informational Meeting March 5, 2003 Perry Township Administration Building Delmar Addition/Glenn Avenue Sewer Improvement Area.
Article 41 Wastewater Planning Capacity Study To determine whether the Town will vote to adopt a resolution supporting the Town Manager’s allocation of.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
“Nucor Road Industrial Corridor – Sanitary Sewer Project” Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th,
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
Membrane Softening Water Treatment Plant completed in –Upper Floridan groundwater wells provide the source water for treatment. –Treatment process.
MassDEP Municipal Services
Districts In Good Standing. Origins Discussed at November 2010 meeting Approved by the Soil and Water Conservation Commission during January 2011 meeting.
Connecticut Department of Energy and Environmental Protection.
Saving With Solar: LESSONS FROM THE MORRIS HYBRID Power Purchase Agreements MODEL April 18, 2013 ASES ANNUAL CONFERENCE BALTIMORE, MARYLAND.
Council Workshop, February 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0.
2009 Payable 2010 Levy Certification Independent School District 196 Rosemount-Apple Valley-Eagan Public Schools December 14, 2009 Educating our students.
1 TOWN OF LOCKPORT FINANCIAL REVIEW Focus on the Sewer Plant and Sewer Collection Service.
City of Rehoboth Beach Wastewater Treatment Facilities A Historical Narrative June 16, 2008 Presented by Bob Stenger, Superintendent Rehoboth Beach Wastewater.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Fridley Public Schools ISD #14 Public Hearing for Taxes Payable in 2012.
DECEMBER 2014 Hastings School District # 200 Truth In Taxation.
SCHOOL BUILDING AID PROGRAM CHANGES 2014 AND BEYOND.
ESPLOST Update Savannah-Chatham County Public Schools May 2, 2007.
Connecticut Department of Energy and Environmental Protection.
Energy and Air Quality Conference April 5, 2004 Innovative financing, support, and solutions for Implementing Energy Projects.
5/29/021 Informational Meeting May 29, 2002 Perry Township Administration Building Fourth Street/Bowman Road Sewer Improvement Area.
Council Workshop, June 24, Image Date: 1/15/2014 Future WWTF No. 2 Capacity 2.0 MGD., Expandable to 6.0 MGD. Future WWTF No. 2 Capacity 2.0 MGD.,
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
1 Maribor Wastewater Treatment Plant Presentation of PPP Model in Maribor - Slovenia Conference Danilo ŠALAMON – Chief of the Infrastructure projects Department.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
THE FOSTER GROUP TFGTFG GLWA Capital Improvement Program Summary and Financing Observations January 26, 2016.
Public Information Meeting Wastewater Treatment January 26, 2016.
Discussion of Priority Activities for Next Eighteen Months Action Plans.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Heritage Park Area Mandatory Connection Final Information Meeting March 14, 2016.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 Energy/Compost Facility Action Plan City Council Meeting July 2, 2012.
Wastewater Treatment and Disposal Upgrade Nampa Wastewater Advisory Group Meeting #10 October 9, 2012.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
CFW Caldwell Flores Winters, Inc. Facilities Planning, Public Finance, Program Administration Calistoga Joint Unified School District Financing Options.
1 BIOSOLIDS SHORT AND LONG RANGE PLANNING Utilities Department Orange County Board of County Commissioners January 11, 2011.
Loan Programs.  What is the PFA?  How does PFA financing work?  What is the Capital Financing Program?  What is the State Revolving Fund Program?
Marquis Hills Area Information Meeting December 7, 2016
Waste Discharge Permit: Paradise Irrigation District
Chromium 6 Regulation Corrective Action Plan October 6, 2015
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Marquis Hills Area Information Meeting December 7, 2016
Woodbridge Township School District Referendum 2017
Perris Water Filtration Plant Membrane Upgrade – Phase I
GOMER SEWER IMPROVEMENT AREA
Springbrook Estates Sewer Improvement Area Informational Meeting
Stormwater Management Program
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Woodbridge Township School District Referendum 2017
Article 41 Wastewater Planning Capacity Study
St. Marys Intracoastal Gateway.
Delta Water Supply Project
BAT Work Group.
SWAC – Agenda 10/23/18 Chapter 6 – Alternative Technology – Draft Findings 2. Chapter 7 – Draft Landfill Disposal Existing Disposal System Disposal Options.
Early Funding (Regulations Section 6010)
Athletic Field Improvements
Presentation transcript:

Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008

History July 2001 –Discharge Permit Renewal Application March 2002 – Referendum for Addition March 2003 – Start construction for Addition August 2003 – NJDEP issues new permit –Permitted Flow reduced, new limits for Copper, Zinc and Phosphorus September 2003 – District Adjudicates Permit conditions 2004 – District conducts process evaluations on STP 2005 – District evaluates options to meet new limits

6 months required to prepare design & contract documents NJ DEP will require 3 – 6 months for permit review & approvals, which are complicated by the NJ Highlands Legislation Minimum 1 year to construct facilities

Design Options Alternative 1 – Modify 50-year old STP –Install new chemical addition & filtration at existing activated sludge plant Alternative 2 – Construct New STP –Install Membrane Bioreactor (MBR) activated sludge plant with chemical addition Alternative 3 – Discharge to Groundwater –Install new MBR plant & groundwater disposal field Hauling, Septic Disposal & Connection to regional treatment facility were also considered

Construction Cost Estimates Alternative 1 – Modify STP –$1.6 Million Alternative 2 – New STP –$1.6 Million Alternative 3 – Groundwater Discharge/New STP –$3.0 Million + Soft

Project Schedule Spring 2006 – Initiate design September 2006 – Submit Contract Documents & Permit Applications to NJ DEP January 2007 – Advertise for Bids April 2007 – Start Construction April 2008 – Complete Construction May – July 2008 – Start-up & Testing September 1, 2008 – Meet Final Permit Limits

Funding Options Build into district budget within Cap –Displaces $350K existing programs Separate ballot referendum question –Eligible for Debt Service

Funding Sources NJ Environmental Infrastructure Trust - low interest (~2%) loan with up to a 20 year term. Morris County Improvement Authority can provide a market rate loan (~4%). Traditional Issuance of Bonds – Eligible for State Aid Debt Service

Consequences If Referendum Fails Existing STP will not consistently meet new permit limits Discharge violations will result in mandatory civil administrative penalties Name of Violator will be published in Newspaper Mandatory Penalties range from $1,000 - $50,000 per violation

Grant Funds Available Township has a US EPA $1.1 Million Grant, of which 55% funded through EPA and 45% will need to be financed locally through the Trust or County or Traditional Bond Issuance program.

Range & Scope of Potential Cost to Taxpayers Minimum Exposure = $1,495,000 Maximum Exposure= $2,100,000