1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

Cleco Transmission Planning Summit 2013
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
Cleco Transmission Planning Summit 2012
Entergy Louisiana, LLC (North) 2010 to 2012 Draft Construction Plan
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Midwest Energy, Inc. Transmission Planning and Expansion
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 Entergy Arkansas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
1 New Orleans, LA July 29, 2008 Randy Helmick Vice President, Transmission Entergy Services Inc. Entergy Transmission Planning Summit.
Freeport Area Master Plan Project
2016 RTP Update November, 2016 RPG Meeting.
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Local Area Planning Update to TRANSAC – June 29, 2017
Presentation transcript:

1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004

Harelson Weiner Coly-Loblolly-Hammond Line Construction Carryover: Build parallel line

3 Coly-Loblolly-Hammond Line Construction LoblollyFairgroundsColy Hammond 69 kV 230 kV To Lockhart 69 kV To Polyform 69 kV 69 kV 230 kV Phase II: Install 230\69 kV auto from Harelson Phase I: Build at 230 kV and operate at 69 kV To Vignes 230 kV To Jaguar 230 kV To Moler 230 kV To French Settlement 230 kV To Ponchatoula 230 kV To Independence 115 kV Phase II: Build Loblolly-Hammond 230 kV Phase I: $3.62 MM with ISD 2004 Phase II: $11.4 MM with ISD 2007 See ELI-South Presentation for Phase II details

EGSI-LA Transmission Reliability Projects McManus 69 kV: Capacitor Bank Addition ASI Improvement Plan: Conway-Panama (2005 ISD) Carryover Coly-Vignes (2006 ISD) SEE ELI Presentation Loblolly-Hammond: Build 230kV line 2007 ISD Est. Cost: $3 MM (R.O.W.) SEE ELI Presentation Jefferson Davis Parish 69 kV System Improvement Plan 69 kV Jackson- Marydale Line Upgrade 69 kV Lafayette-Holiday Line Upgrade 69 kV Coly-Denham Springs: Upgrade Line 138 kV Port Hudson- Crown Zellerbach Line upgrade: Phase kV Moril-Hopkins: Construct new line 138 kV Nelson- Mossville: Upgrade line

5 138 kV Line 368 Port Hudson-Crown Zellerbach: Upgrade Line Scenario The 138 kV substations Star Hill, Crown Zellerbach, and Repapco in East Baton Rouge and East Feliciana Parishes are served by 2-230/138 kV autotransformers located at Port Hudson substation. This industrial loop serves approximately 207 MVA with the Repapco cogeneration out-of-service. Under peak loading conditions, loss of the Repapco-Port Hudson line can potentially overload Line 368 (Port Hudson-Crown Zellerbach) by as much as 25% in 2004, that portion of line composed of 795 AA and rated at 174 MVA Recommended Solution Complete 2 nd phase of reconductoring 7.5 miles of Line 368 with a conductor capable of at least 301 MVA or 1,260 A. Estimated Cost: $5.5 MM

6 138kV Line 368 Port Hudson-Crown Zellerbach 2005 Phase 1 Phase 2

7 69kV Jackson-Marydale: Upgrade Line Scenario The 69 kV system serving loads north of Baton Rouge in East and West Feliciana Parishes is supported by two 69 kV lines out of Port Hudson substation. This is a rural service area with long distances between substations on two divergent radial circuits. This 69 kV system will serve approximately 70 MW in summer 2004 and 71 MW in Loss of Port Hudson to Sandy Creek to Jackson or Francis to Grant to Port Hudson will overload Jackson-Marydale by 17%. Recommended Solution Replace 5.89 miles of existing 1/0 ACSR conductor with 336 ACSR. Replace all structures and conductor as needed. The reconductor will increase line capacity from 33 MVA to 69 MVA. Estimated Cost: $1.43 MM 2006

8 69 kV Jackson-Marydale

9 McManus 69kV Substation: Replace Cap Bank & Correct Load Power Factor Scenario: McManus 69 kV Substation is located north of Baton Rouge in East Feliciana Parish near the end of a 12 mile radial 69 kV line. There will be approximately 70 MW of load in the area in Loss of Port Hudson to Jackson 69 kV will cause voltages less than 90% at multiple substations in East Feliciana Parish. Recommended Solution: Install a 6 MVAr capacitor bank at McManus substation for contingencies only. The existing 18 MVAR bank at McManus should be on-line during summer peak. Estimated Cost: $550 K 2006

10 McManus 69kV Substation

11 69 kV Coly-Denham Springs: Upgrade Line Scenario There is approximately 67 MW of load on the affected 69 kV transmission line. For the loss of Gloria-Harelson 69 kV line, the Coly-Polyform-Denham Springs line overloads by 12% in summer Recommended Solution: Replace 4.37 miles of a mix of 500 Cu, 1033 AA, and 1024 ACAR with twin bundle 666 ACSR or conductor rated at least 180 MVA (1,500 amps). Estimated cost: $2.1 MM

12 69 kV Coly-Denham Springs Line 759 Reconductor line Harelson

13 Jefferson Davis Parish 69 kV System Improvement Plan Scenario: The 69 kV transmission system between Jennings and Chlomal substations will serve approximately 85 MW of load including the radial from Lawtag substation in The main "trunk" of these systems are the contiguous segments comprising of Line 13 (Jennings-Compton-Elton), Line 16 (Elton-Tupper-Serpent-Carter), and Line 11 (Carter- Lacassine-Chlomal). As an indication of load growth in this area, a new 25 MVA transformer was added in 2004 at Lacassine Substation. Splices have been used to make repairs and they are beginning to fail. The current loading can potentially cause the 69kV lines to sag into the distribution underbuild that is located along most of these lines. Upgrading these lines is needed to address safety and reliability concerns

14 Existing Configuration of Lines 11, 12, 13, 14 Station with Breaker Non-Breaker Station LEGEND Station with Proposed Breakers Radial to Winn/Potter/Thornwell/ TexLake Chlomal IowaDerouen Lacassine Carter SerpentTupper Elton Compton Roanoke Lawtag Robbie Jennings Welsh Normally-Opened L11 L13 L16 L13A L12 L14

15 ContingencyOverload/Undervoltage Loss of Jennings-Lawtag Chlomal-Iowa 20% Loss of Elton-Jennings Chlomal-Lacassine 28% LC Bulk-Chlomal 6% Loss of Chlomal-Carter Compton-Jennings 5% Loss of Lawtag-Jennings Robbie, Winn, Texlake Potter < p.u. Loss of Richard-Nelson 500Lawtag-Jennings 22% Recommended Solution: Phase I:Upgrade 3.07 miles of 795 AA from Lake Charles Bulk to Chlomal. Upgrade 4.78 miles 4/0 CU from Jennings-Lawtag with a conductor rated at least 101 MVA of capacity. Install breaker at Lacassine. Phase II Upgrade miles 1/0 ACSR of Chlomal-Lacassine to a conductor with at least 101 MVA of capacity. Install a 9MVAR capacitor at Winn Substation. Estimated cost: Phase I $3.7 MM Phase II $6.3 MM Jefferson Davis Parish 69 kV System Improvement Plan

16 Phase II Install cap bank at Winn Substation Phase I Upgrade Line Phase II Upgrade Line Phase I Upgrade Line Jefferson Davis Parish 69 kV System Improvement Plan

17 69 kV Lafayette-Holiday: Upgrade Line Scenario: There is approximately 141 MW of load in the area. Lafayette-Holiday-Billeaud line is currently rated at 39 MVA. In fall 2002, a breaker was installed at Billeaud, a normally- opened point, allowing it to be normally-closed. In summer 2007, Lafayette-Holiday is expected to load to 101% under normal operations. Loss of Moril 138/69 kV auto causes a 19% overload and loss of Moril-New Iberia 69 kV line causes an overload of 14% on Lafayette-Holiday in Summer Recommended Solution: Replace 4.89 miles of 1- 4/0 Cu with ACSR or conductor that achieves at least 68 MVA (or 569 amps) capacity. Estimated Cost: $2.23 MM

18 69 kV Lafayette-Holiday Line Upgrade Line Upgrade

kV Moril-Hopkins (Cleco): Construct Parallel Line Scenario The Iberia and Vermillion Parish area’s 69 kV transmission system is served from Scott Bulk (via Richard 138 kV lines) and the two 138 kV tie-lines (Moril-Hopkins and Ivanhoe- Bayou Warehouse) with CLECO. The area load is approximately 168 MW. For the loss of Moril-Hopkins, Duboin-Bayou Warehouse overloads by 13%. Recommended Solution Build new parallel line from Moril to Hopkins 2.56 miles with a conductor that achieves at least 290 MVA (1,205 amps) capacity. Estimated cost: $2.5 MM Note: Requires joint planning with CLECO

kV Moril-Hopkins (Cleco) Overloaded Line HOPKINS (CLECO) Build Parallel Line

kV Nelson-Mossville: Upgrade Line Scenario: The 138 kV transmission system in the Lake Charles area serves large industrial loads and commercial & residential loads. The affected area load is approximately 200 MW. –For the loss of Carlyss-Citicon West, Nelson-Mossville overloads by 3% in 2005 and 6% in summer Recommended Solution: Reconductor 3.28 miles of AA with conductor with at least 333 MVA capacity or 1,590 ACSR. Estimated cost: $1.7 MM

kV Nelson-Mossville Upgrade Line 274

EGSI-LA Transmission Expansion Projects Gloria-Harelson Line Upgrade Alchem-Monochem Line Upgrade: 2008 ISD Scott-Carencro Line Upgrade: 2007 ISD Scott-Judice-Meaux Line Upgrade: 2008 ISD Richard-Colonial Academy Line Upgrade: 2007 ISD Loblolly-Hammond: Build 230kV line: 2007 ISD

24 EGSI-LA Transmission Target Areas 2009 and Beyond Add 3 rd 138/69 kV Scott Auto 100 MVA: 2009 ISD

25 Questions