Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar.

Slides:



Advertisements
Similar presentations
Best Available Techniques (BAT)
Advertisements

Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
© European Communities, 2007 Purpose The European Integrated Pollution Prevention and Control Bureau (European IPPC Bureau) of the JRC/IPTS was set up.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
HR 09 IB EN 02 – German Proposal, Zagreb, 10 June 2011 Page 1 April 12, Strengthening the Ministry of Nature Protection of the Republic of Armenia.
1 Current State of Harmonisation and Implementation/Enforcement of Environmental Legislation – Industrial Pollution Control in the CR Transposition of.
Voluntary instruments Daniel Hajek 1.Environmental labelling 2.EMAS 3.Cleaner productions 4.Green public procurement 5.Voluntary agreements Voluntary.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Industrial Pollution Control and Risk Management: IPPC Neil Emmott Environment Directorate-General 7 April 2006.
Law approximation and implementation in Hungary Ministry for Environment Department of Integrated Pollution Control Nicosia, May 2001 Andrea Nám, desk.
BULGARIAN COMPETENT AUTHORITIES IN THE FIELD OF IPPC Kalin Iliev Ministry of Environment and Water Bulgaria.
Practical use of newly developed BAT conclusions Valts Vilnītis.
Estonian Environment Information Centre The FINAL SEMINAR OF PROJECT LIFETCY98/CY/167 “Integrated Control of Industrial Pollution and Chemical Substances.
ECENA 4 th Exchange Programme Cluj Napoca, October, 2005 National Updates in the Transposition and Implementation of IPPC directive Ministry of Environment.
IPPC IN MINING AND METALLURGY IN THE REPUBLIC OF MACEDONIA Bosko Nikov
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
The European IPPC Bureau Institute for Prospective Technological Studies (IPTS) Seville, Spain Internet E.mail : Don.
The role of the workplace from the perspective of environment sector Ministry of the Environment of the Slovak Republic Environmental Risk Management Department.
Integrated Control of Industrial and Chemical Substances in Cyprus Integrated Control of Industrial and Chemical Substances in Cyprus Final Conference.
NATO/CCMS Pilot Study Meeting “ Prevention and Remediation In Selected Industrial Sectors: Small Sites in Urban Areas ” 4-7 June 2006 Athens, Greece Tour.
ENVIRONMENTAL MONITORING AND REPORTING BY ENTERPRISES FEASIBILITY OF DEVELOPING MONITORING GUIDELINES FOR CHEMICAL INDUSTRY IN EASTERN EUROPE, CAUCASUS.
1 Inspection of LCPs: System for Inspection. ECENA Training Workshop Bristol, March 2008.
Introduction to EU Environmental Law
Workshop, 12/3/2004 Banska Bystrica – SLOVAC REPUBLIC “INTEGRATED LICENCE PROCEDURE (Greek case)” Katerina Iakovidou-Anastasiadou Hellenic Ministry for.
Current state on Harmonisation and Implementation/Enforcement of Environmental Legislation - Industrial Pollution Control in SLOVENIA Barbara Bernard Ministry.
BULGARIAN APPROACH TO THE BAT IN THE IPPC PERMITTING BOYKO MALINOV MINISTRY OF ENVIRONMENT AND WATER BULGARIA.
IPPC Directive state of play and future developements
IPPC implementation in Poland – special focus on public participation in process of issuing IPPC permits INFRA Ankara, Turkey 5-6 November 2009 
TRANSPOSITION AND IMPLEMENTATION OF THE IPPC, LCP, SEVESO II, VOC DIRECTIVES – EXPERIENCE AND LESSONS LEARNT Kalin Iliev Nikolay Savov Ministry of Environment.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
Ministry of Waters and Environmental Protection, ROMANIA 1 BERCEN 1 st Exchange program – November 2002 Croatia PROBLEMS AND SOLUTIONS IN COOPERATION.
14/10/2015European Agency for Reconstruction1 Water & environment.
Third BERCEN Plenary Meeting December 16-17, 2004 Brussels, Belgium Key Achievements in Environmental Enforcement and Compliance in the Republic of Montenegro.
1 Permitting of industrial facilities in Croatia.
ROMANIA INTEGRATED POLLUTION PREVENTION AND CONTROL - IPPC MINISTRY OF ENVIRONMENT AND WATER MANAGEMENT PRAHA June 2004 Iuliana Chidu EU Counsellor.
IPPC transposition and experience with its implementation in the Czech Republic ?? …!! AjPíPíSí ??
4 th Exchange Programme Cluj Napoca, October, 2005 REPUBLIC OF CROATIA Updates in the Transposition and Implementation of IPPC directive Updates.
The Process of Development of IPPC Legislation Robert Sarlamanov MA, IPPC Expert Ministry of Environment and Physical Planning, Bercen Exchange Programme,
Slovak Environmental Inspectorate Procedure of issuing the permits in the Slovak Republic.
Energy Efficiency in IPPC Installations, Wienna Oct/2004 Petr Honskus (SPF Group) Chairman of EE TWG CR Vladimíra Henelová, Monika Přibylová Members.
SEVESO II transposition and implementation – possible approaches and lessons learned from MS/NMS SEVESO II transposition and implementation – possible.
CONTROL Environmental protection act Boyko Malinov Ministry of environment and water Bulgaria.
The legal background for implementing the IPPC, EPER, and PRTR Protocol Requirements Orsolya Adamovics Department for Conservation of Environment Ministry.
Strengths and weaknesses of the permitting system and enforcement process in RIEW – Veliko Turnovo Regional Inspectorate of Environment and Water - Veliko.
European Regulatory Framework 1st April Faro Alessio Di Paolo.
First ECENA Plenary Meeting January 2006, Zagreb Croatia Serbia-Update on strengthening the implementation and enforcement of EU environmental legislation.
Industry environmental self- monitoring and reporting UK experience with reference to the Pollution Inventory Dr Ian Whitwell The Environment Agency of.
Recommendation of the European Parliament and of the Council of 4 April 2001 providing for Minimum Criteria for Environmental Inspections in the Member.
Iuliana CHIDU European integration counsellor Ministry of Environment and Water Management Prague - CZECH REPUBLIC April 2005 DIRECTIVE 96/61/EC.
1 Third BERCEN Plenary Meeting Brussels, December 2004 Agenda item 13 Key achievements in environmental enforcement and compliance - discussion on.
BERCEN plenary meeting Sofia, March 18, 2005 Agenda item 8 Draft Scope and Proposed Location of BERCEN Training 2005 BERCEN Secretariat.
How to start with the implementation of IPPC Directive Czech Republic Czech Environmetal Inspectorate.
Third BERCEN Plenary Meeting December , Brussels Belgium The key achievements in environmental enforcement and compliance REPUBLIC OF SERBIA.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Achievements in IPPC Directive Implementation: problems and constraints Albania Ministry of Environment 3 rd BERCEN Exchange Programme for the Environmental.
1 Short overview of the implementation of IPPC, LCP, Seveso II, Waste Landfill and Incineration directives Short overview of the implementation of IPPC,
Integrated and Planned Enforcement of Environmental Law Phare Twinning Project CZ03/IB/EN/01 1 The IPPC Directive Introduction to the philosophy Rob Kramers.
IPPC A general overview Nigel Barraclough Policy Adviser Industrial Pollution Control Branch Air and Environment Quality Division. Taiwanese Environmental.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment and Climate Change.
This Project is funded by the European Union Project implemented by Human Dynamics Consortium FINAL STEERING COMMITTEE MEETING BELGRADE, 2 FEBRUARY 2016.
Introduction to the philosophy
BAT - BREF Their scope Rob Kramers Senior advisor InfoMil.
INTEGRATED PERMITTING IPPC DIRECTIVE: BEST PRACTICE
PRESENTATION OF MONTENEGRO
Nick Bonvoisin Secretary to the Convention on the
Aleksandra Antonowicz Green Federation GAJA/CCB
Industrial Emissions Directive Targeted stakeholder survey
Presentation transcript:

Industrial Pollution Control - Harmonization and Implementation in Bulgaria Slavitza Dobreva Ministry of Environment and Water Bulgaria Final Seminar on Project LIFE CY98/CY/167 Nicosia, 7-8 June 2001

Directive 96/61/EC on Integrated Pollution Prevention and Control §Transposition into the Bulgarian legislation §Compliance Analysis §Implementation Challenges

Directive 96/61/EC on Integrated Pollution Prevention and Control Aim and objectives of the Directive §To achieve integrated prevention and control of pollution arising from certain activities by means of measures to prevent or to reduce emissions from industrial facilities into air, water and land. §To establish a permit-issuing system for all the activities covered by the Directive. Transposition into the Bulgarian legislation §Environmental Protection Act and its Amendments; §Regulation 4 on Environmental Impact Assessment.

Directive 96/61/EC on Integrated Pollution Prevention and Control Compliance Analysis The existing legislative acts: §Partly transpose also the requirements of Regulation 1836/93/EEC on Eco- management and Audit Schemes (EMAS). §Consider the existing state of environment for certain industrial plants. §Identify the principle emissions and sources of pollution. §Establish programmes for complying with the requirements of the European environmental legislation. §Establish plans for self-monitoring. §Elaborate action plans in case of major accident hazards. §Set up conditions for keeping the activities of certain industrial plants and for control of these conditions.

Directive 96/61/EC on Integrated Pollution Prevention and Control Lack of Compliance §With the mandatory character of the environmental audit. §With the procedure of permits-issuing. §The major industrial sites are not registered. §Best Available Techniques (BAT) are not applied in all appropriate preventive measures against pollution.

Directive 96/61/EC on Integrated Pollution Prevention and Control Implementation Challenges §Need of adequate technical equipment. §Need of training for the competent specialists in order to improve their qualification.

Industrial Pollution Control Harmonization of Legislation/ Implementation of Regulations §Directive 91/61/EC §Regulation 1836/93/EEC on EMAS §Regulation 880/92/EEC on eco-labeling §New Environmental Protection Act §Regulation on registration of sites with systems for eco-management and audit §Regulation on establishing a system to identify the compliance of certain industrial products with certain eco-requirements

Industrial Pollution Control Future Priorities

Industrial Pollution Control PHARE Assistance §PHARE Twinning Project BG99EN01B – Transposition of the environmental legislation and introduction and facilitation of the implementation of the IPPC Directives - Ireland §PHARE Twinning Project BG2000EN01D – Training and application of the IPPC Directive on a regional level for specialists from the Regional Inspectorates and from the industrial sector - Germany

Industrial Pollution Control PHARE Assistance - Main Objectives §Twinning Project 99 §Preparation of pilot integrated permits of two Bulgarian plants (Solvey Sodi and Agropolychim - Devnia) ; §Preparation of guidelines for determination of BATs; §Preparation of an inventory of IPPC sites in Bulgaria; §Further development of the IPPC permit template.

Industrial Pollution Control PHARE Assistance - Main Objectives  Twinning Project 2000 §Establishment of real working procedures including procedures for public accession to the whole process of issuing of a integrated permit; §Preparation of technical documents for specific industrial sectors (petrol refinery, non ferrous industries, landfill, iron & steel, cement & lime and pharmacy); §Set up of the procedures for preparation and issuing of integrated permits for the biggest industrial enterprises in the selected sectors; §Improvement of information exchange among stakeholders including the publishing of information bulletins for public participation, access to information, and information for main industries; §Definition of the financial resources needed to introduce BAT in Bulgaria.

Industrial Pollution Control Pilot Permits Issuing Pilot Permits Issued Funded by World Bank §Sevko Tannery - Sevlievo §Power Station - Pernik

Industrial Pollution Control Pilot Permits Issuing Pilot Permits in Process of Preparation Funded by Phare -Twinning §Solvey Sodi Soda Ash Plant - Devnia §Agropolychim Fertilizers Plant - Devnia Funded by DEPA §Sviloza Synthetic Fibres Plant - Svishtov §Union Minier Copper Smelter Plant - Pirdop §Non Ferrous Metals Plant - Plovdiv §Non Ferrous Metals Plant - Kardjali §Chimko Fertilizers Plant - Vratza