City of Traverse City Snow Removal Operations. Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency.

Slides:



Advertisements
Similar presentations
September 28, 2013 Greg Duncan, Assistant Chief Engineer of Operations Anaheim, CA Performance Based Maintenance Contracting in Tennessee (Experience One.
Advertisements

ALDOT Operations and Extreme Weather Events
University of Connecticut-Stamford Campus Safety Orientation
2011 Windstorm “Be Prepared: Preventing Disaster/ Planning for Recovery” South Bay Cities Council of Governments 13 th Annual General Assembly February.
Winter Storm ” Snowfall 20 Days of Freezing Rain.
Driveway Snow Windrow Removal Department of Public Works and Services Surface Operations Branch Transportation Committee February 15, 2006.
Office of Risk Management Driving in Inclement Weather.
Erik West Greater Portland Council of Governments Portland, Maine Creating an Effective School Walking Routes Study Erik West Kids and Transportation Program.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Mayor Brandon Smith City Administrator Kimberly Newman Council Members: Chris Cole, Darby Kneisler, Doug Watson, Bill Patterson, Laura Moore.
PUBLIC WORKS OPERATIONS: TRANSPORTATION Steve Hansen, PE Director of Public Works – Liberty, MO APWA PW Institute April 8, 2014.
Managing the Future of Downtown Santa Monica Project Update Progressive Urban Management Associates, Inc. Kristin Lowell Inc. December 2007 Progressive.
Disaster Recovery and Clean Up You Don’t Have to Do It Alone.
GIS Helps Americus Respond to Tornado March 1, 2007.
Town of Franklin Department of Public Works Sidewalk Snow Removal Program January 6 th, 2009.
Message from the Proctor Police Department. However, the parents must have been praying harder because the children have been going to school. The police.
Building Coordinators Network January 12, Welcome.
Winter Road Treatments & Snow Removal Costs Outline.
Significant Weather Operations Protecting Our People.
Road Maintenance Report Warm Springs Reservation.
Downtown Parking Study City of Meriden Prepared by Fuss & O’Neill.
Winter Storm Response Presentation & Discussion. Winter Storm Response2 Storm Response – PW Mission “We strive for the safest roadways at a reasonable.
1 Winter Operations Program Presented by Ken Greene October 10, 2011.
Improving Public Works Efficiency. Evaluating what we do: Are we doing the right work?
 Describe TSS Classification Series  Key Points of TSS Concept  Describe Cross Bargaining  Describe How TSS is used in MnDOT District One ◦ Winter.
Thinking it Through: Interactive Exercises about Public Entities and the ADA ADA Trainer Network Module 5d Trainer’s Name Trainer’s Title Phone Number.
FLOOD MITIGATION OBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006.
NAVIGATING THE STORM Disaster Debris Management March 2014 Ice Storm Chris Marriott Deputy Director – Field Operations Department.
Snow Collider-Accelerator Department Take 5 for Safety.
1 Public Works Operations March 11, Streets – Street Sweeper Warranty repair in February resulted in about 5 weeks of downtime Streets are Dirty.
2012 CITY OF MIDDLETON SATISFACTION SURVEY WORKING DRAFT - PROPOSAL.
COVER YOUR BASES By: Pete Spatara By: Pete Spatara Director of Public Works Director of Public Works City of West Palm Beach City of West Palm Beach.
Department of Public WorksDepartment of Public Works Performance Measures 2010.
Snow Removal Information Robert “Brutus” Cantoreggi, Director Carlos Rebelo, Highway and Ground Superintendent.
How would a truck get through? Any suggestions?. No parking allows access.
Cell City. Your Task The technology to shrink and inject a full size science student into the blood stream of a living human is now available. Your mission,
1 EMERGENCY DEBRIS REMOVAL PLAN. 2 Debris Removal Areas.
STREET PARTY EVENT INFORMATION Elaine Richards Network Coordinator London Borough of Merton.
Mn/DOT Winter Performance Measures Performance Measures Maintenance Quality Assurance Peer Exchange October 12, 2004.
Olathe’s Snow Removal Program. Overview Snow Removal Policy Types of Routes Snow Route Information Site AVL units Complaint database.
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
Leona Heights Sulfur Mine & Creek Cleanup
Dealing with Winter Snow Maintenance 2015 SDATAT Road Conference By : Ken Skorseth SDLTAP Special Projects Manager.
Pre-Activity Safety Plan Preparation
Assigning Winter Level of Service State Long Range Transportation Plan (SLRP) is the basis for assigning LOS Designates routes into International,
Building Access/egress Weather Emergency Planning 1.
City of New Brighton Department of Public Works City Services Task Force Presentation April 17, 2003.
Public Works Overview of Winter Salt Usage. Our Equipment The City of Mankato's Public Works Department plows 432 lane miles and uses an average of 2,400.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
ORDINANCE # Authorizing $372,760 for traffic signal interconnect at 47 th Street and Emanuel Cleaver II Boulevard Start of project End of project.
City of Joliet Anti – Icing/De-Icing Program MIKE EULITZ – ROADWAYS ENGINEER.
Department of Transportation Road Services Division Snow and Ice Response
1,000 Year Flood Lessons Learned After A State Disaster Norma J
Monet & Treviana HOA ― Construction Open House November 17, 2016
Streets Division Plowing Operations Hawk’s Landing
Sustainable Management
June 5, 2017.
Department of Public Works FY 2018 Recommended Budget
Snow & Ice Event/Bare Lane Training
Public Works Roads Operations
Looking for best Landscape Design London Ontario service -
City of Saginaw Curb Side Leaf Collection Update
Kiosk Upgrade Project.
Emergency Snow Routes January 14, 2016.
NAVIGATING THE WINTER WITH THE ILLINOIS TOLLWAY
Village of Shorewood Snow and De-icing Plan
When it snows, we respond. Snow season November 15-March 15
MESA COUNTY SNOW PLOW PROGRAM.
Integrating Trails into Transportation Networks
Public Transportation for Royal Oak
Presentation transcript:

City of Traverse City Snow Removal Operations

Responsibilities Streets Division –State Highways (Trunkline, 8 miles) –City Streets (83 miles) Emergency Routes (Green Route) Majors Locals Alleys –Sidewalks (73 miles) –Management of Contracts

Responsibilities Contractors –Downtown Sidewalks –14 Parking Lots (with snow removal) –On-call snow hauling and windrowing downtown Parks Division –Parks and Senior Center –Cemetery –13 Parking Lots (downtown TC) –Sidewalks on bridge decks

Streets Division Assets Personnel –13 Equipment Operators –3 Shifts Day shift - 9 Afternoon shift - 2 Midnight shift - 2 Equipment –10 Plow trucks 7 w/ Sanders –3 Holders (sidewalk blowers) (no operators) –4 Loaders w/ snow buckets –2 Downtown Snow Blowers

Street Priorities 1.Green Route 2.Major Streets 3.Local Streets 4.Alleys All priorities covered during day shift and during full callouts Afternoon, nights, weekends, holidays keep green route clear

Sidewalk Priorities Schools Hospital Major Streets All others Goal is to clean all sidewalks within 3 days of end of snow event No operators until streets are cleared

Sidewalk Responsibility Sidewalk blowing began as a program to assist residents in major snow events Sidewalk blowers don’t clean walks completely City Ordinance states, “The removal of snow and ice from private property and the sidewalk abutting or crossing private property shall be the responsibility of the occupant of such private property.”

Full Callout In response to 3-5 inch snow event Day crews report at 5 a.m. or earlier All routes plowed in priority order Shifts extended as needed until snow event is complete Goal: Sidewalks are cleared within 3 days of end of snow event

Downtown Cleanup Level 1: (3-inch snow) –Streets orders contractor to mobilize –Contractor cleans sidewalks and assigned lots –Streets personnel push snow into parking lots for temporary storage –Parks cleans assigned lots

Downtown Cleanup Level 2: (Larger snow event) –Streets orders contractor to mobilize –Contractor cleans sidewalks and assigned lots –Contractor uses 2 graders to windrow snow –Streets personnel blow snow into contractor- provided lead trucks –Parks cleans assigned lots