1 Proposed Requirements for Calculating Emergency Planning Zones for Sour Wells, Sour Pipelines and Sour Production Facilities Presented by: Gary Neilson.

Slides:



Advertisements
Similar presentations
NERC Critical Infrastructure Protection Advisory Group (CIP AG) Electric Industry Initiatives Reducing Vulnerability To Terrorism.
Advertisements

Risk Assessment for Cultural Institutions: Fire Testing vs Computer Modeling Frederick W. Mowrer, Ph.D., P.E. Department of Fire Protection Engineering.
WASH Cluster – Emergency Training S WASH STRATEGY Session 3 Strategic Planning S3 1.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Presentation to NACo Environment, Energy and Land Use Steering.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Damage Prevention PHMSA Update Annmarie Robertson PHMSA/Office.
Risk Analysis For: ES-317Y and ES Plant Design Project at UWO By: R.A. Hawrelak, P.Eng. - Lecturer Dept of Chem & Biochem Eng’g Dow Chemical –
Federal department of environment, transport, energy and communications ETEC Federal Office for the Environment FOEN Risk Assessment on Pipelines: the.
Prepared for Water Quality Partnership March 17, 2011 SMS Rule Revisions SMS Rule Revisions Things are never as good as they seem, things are never as.
Session 11: Modeling Dispersion of Chemical Hazards, using ALOHA 1 Modeling Dispersion of Chemical Hazards, using ALOHA Prepared by Dr. Erno Sajo, Associate.
Introduction to SCREEN3 smokestacks image from Univ. of Waterloo Environmental Sciences Marti Blad NAU College of Engineering and Technology.
Introduction to SCREEN3 smokestacks image from Univ. of Waterloo Environmental Sciences Marti Blad.
Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation,
Budget Shortfall Options Ian Wyatt - Atkins JIP on Bursting Disks for Shell & Tube Exchangers – 2 nd Stakeholders Meeting.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
ADMS ADMS 3.3 Modelling Summary of Model Features.
Iterative development and The Unified process
1 Decision Analysis by Dr. AA. 2 Man decides based on what he believes… Man believes what he want to believe…
Liquid and Gas Pipeline Advisory Committees
A Review ISO 9001:2015 Draft What’s Important to Know Now
Codex Guidelines for the Application of HACCP
1 Analytical Tools, Data & Scenarios Workshop July 29, 2004 California Water Plan Update 2004.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Technical Considerations on the Quantifiability of Wood Smoke Health Impacts Regional Technical Forum November 18, 2014.
Basics of OHSAS Occupational Health & Safety Management System
IAEA International Atomic Energy Agency Roger Seitz Addressing Future Human Actions for Safety Assessment Summary from CSM on Human Action And Intrusion.
Update on the U.S. Climate Change Science Program UN Framework Convention on Climate Change Subsidiary Body Meeting June 21, 2004 Linda V. Moodie Senior.
Canada Health Canada Santé Canada Consumer and Clinical Radiation Protection Bureau National Guidelines for Environmental Assessment: Health Impacts of.
Engineering Risk Assessments and Risk Communication Sarah Arulanandam, Hazard and Risk Group RWDI West Inc. DISCLOSURE OF MATERIAL ENVIRONMENTAL EXPOSURES:
Overview of Land Use Compatibility between Sensitive Land Uses and Nuisance Sources Peter Piersol A&WMA/OPPI Land Use Compatibility.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
MSHA Communications and Tracking Workshop March 17, 2010.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
January 29, 2013 Lake Diefenbaker Reservoir Operation Proposed Operating Manual Development.
Forging Partnerships on Emerging Contaminants November 2, 2005 John Vandenberg Associate Director for Health National Center for Environmental Assessment.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Planning and Community Development Department Housing Element City Council February 03, 2014.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
EPA’s DRAFT SIP and MODELING GUIDANCE Ian Cohen EPA Region 1 December 8, 2011.
Curriculum Instruction Assessment Aligning Manitoba Physical Education Supervisors Association Linda Thorlakson Manitoba Education February 17, 2010.
Screen 1 of 20 Vulnerability Vulnerability Assessment LEARNING OBJECTIVES Define the purpose and scope of vulnerability assessment. Understand how vulnerability.
Methyl Bromide Update: Reregistration and Montreal Protocol April 23, 2009 Reddick Fumigants.
United States Department of Agriculture Food Safety and Inspection Service 1 HACCP Systems Validation NACMPI September 22-23, 2011 Washington, DC William.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Chesapeake Bay TMDL 2017 Midpoint Assessment: A Critical Path Forward Lucinda Power EPA Chesapeake Bay Program Office Citizens Advisory Committee Meeting.
Monmouth County Multi-Jurisdictional Hazard Mitigation Plan Update.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
HF Modeling Task Mike Williams November 19, 2013.
Example 2 Chlorine is used in a particular chemical process. A source model study indicates that for a particular accident scenario 1.0 kg of chlorine.
SO 2 NAAQS Modeling MassCAIR Stakeholder Meeting December 13, 2011.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Presentation of Nominations to the World Heritage Committee by the Advisory Bodies Presentation by ICOMOS Paris, January 2013.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Update for the Citizens Advisory Committee February 22, 2017
Recent Developments Regarding Control Room Habitability Assessment
Every Student Succeeds Act (ESSA) State Plan: Update
Sandia National Laboratories
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Revisions to the Concentration Averaging and Encapsulation Branch Technical Position A. Christianne Ridge Division of Decommissioning, Uranium Recovery,
2017 Midpoint Assessment: Year of Decision October 5, 2017 Local Government Advisory Committee Meeting.
EPA’s Current Air Toxics Activities
WGC-2 DG Meeting Towards a Guidance on Groundwater Chemical Status and Threshold Values 14:00 – 16:00 21 April 2008 Ljubljana, Slovenia.
Contract Number: PR Yong-Yi Wang
Greater Kaweah GSA Board Meeting
Addressing Future Human Actions for Safety Assessment
Presentation transcript:

1 Proposed Requirements for Calculating Emergency Planning Zones for Sour Wells, Sour Pipelines and Sour Production Facilities Presented by: Gary Neilson BSc(Hons) P.Phys Public Safety Implementation Team

2 Presentation Outline Background Proposed new requirements EPZ calculation process Implications Future work EUBMODELS Structure

3 Background Project initiated to address issues heard by Provincial Advisory Committee on Public Safety and Sour Gas* Proposed EPZ calculation requirements based on assessing the hazard footprint of a sour gas release using dispersion modelling *Provincial Advisory Committee on Public Safety and Sour Gas Findings and Recommendations Final Report December 2000

4 Background In the past, disagreement between experts and public about model choices and inputs that will lead to accurate, useful and credible results Difficult for EUB to make informed decisions in the public interest without full understanding of differences

5 Background Draft requirements published mid-December 2003 –Early draft February 2002 –Technical workshop & focus groups –Peer review/EUB testing of EUBMODELS Requesting feedback on –clarity of the requirements/additional requirements –the supporting EUBMODELS documentation and software –March 31, 2004 (extended) Requirements will be included in future revision of Guide 71 - Emergency Preparedness and Response Requirements for the Upstream Petroleum Industry

6 Proposed Requirements Address suite of PSSG Recommendations (17,18, 19, 58 and 62) Define the minimum standards to calculate an EPZ to protect public SAFETY (protect against fatalities or serious irreversible health effects) Replaces the simple release rate based equations (or nomographs) EPZ derived from new requirements remains first step. Actual size and shape of the final EPZ must reflect site-specific features of the area

7 Proposed Requirements EPZ more realistically calculated –characterization of the release (representative gas analysis, source conditions at exit calculated, real gas effects) –dispersion modelling, –consequence modelling to a toxic load based endpoint (concentration AND exposure time important) Credit for PRACTICAL mitigation actions (e.g. limiting release duration through ignition) No “reduced” EPZ as presently defined as single EPZ includes mitigation actions – NO EUB PRE- APPROVAL Applicable to new applications, ERP updates AND interventions

8 Proposed Requirements EUBMODELS (Screening Level EPZ Calculation) Technical Descriptions and Formulations User Guide & Tutorial Software Package REQUIREMENTS ( Minimum Standards)  Sour Gas Release Rates  Gas composition  Depressurization (REAL GAS EFFECTS)  Release Duration  Dispersion Modelling  Meteorological Conditions  Concentration Fluctuations  EPZ Endpoints Base Case MANDATORY Base Case MANDATORY

9 Release Rates For wells maximum release rates required as described in Guide 56 For pipelines mass release rate profile from a guillotine break must be calculated using the maximum licenced pressure –account for the emergency shutdown valve (ESD) trip set points –the distance between ESD valves –mass of gas in adjacent pipeline segments that escapes before the valves close

10 Depressurization - why are real gas effects important? Ideal gas laws under predict EPZ Real gases can form liquid aerosol as they expand and cool Well releases are sensitive to wellhead exit conditions (pressure, temperature, hole diameter) More detailed calculation may result in buoyant release Pipelines usually dense due to pressures EUBMODELS Base Case always dense release - CONSERVATIVE

11 Release Duration Duration defines exposure time Duration for wells must be realistic for the scenario (drilling, servicing or producing) and other site- specific factors Duration for pipelines determined by transient mass release through a guillotine break Countermeasures such as ignition that limit the duration of the sour gas release are permissible (documented and PRACTICAL) For pipelines ignition not allowed as a countermeasure –releases not typically long enough for manual ignition –self-ignition not guaranteed

12 Dispersion Modelling Worst case Met conditions assumed Dispersion model used must account for –real gas effects –dense or buoyant releases For dense plumes parallel airflow model is acceptable because a sour gas release from a well or pipeline occurs at or near ground level Plumes that rise complex terrain model may be required EUBMODELS Base Case must still be included in the documentation supporting an EPZ calculation as well as the calculation using a complex terrain model for comparison purposes

13 criterion complex parallel Requirements now address issues of terrain Buoyant releases may require complex terrain modelling Compare terrain elevations in EPZ to terrain criteria defined in EUBMODELS Criteria based on EUB Guide 60 (Flaring) –kinetic energy lift sufficient to overcome temperature gradient Complex Terrain Criterion - H2S Releases

14 Toxic Load End Points Endpoint described by toxic load criterion –L=KC n t –same adverse effect for low concentration over longer time as high concentration for short time –concentration weighted (n) –K accounts for concentration fluctuations (dispersion models only predict averages) Objective of endpoint is to provide conservatism to protect public safety (i.e. if level achieved would not expect fatality or other serious irreversible adverse effect)

15 EPZ Calculation Process EPZ to be used for Public Involvement EPZ tuned to reflect site specific features EUBMODELS Base Case (Mandatory) EPZ pre-approval from EUB not required EUBMODELS BC Parameters varied Acceptable ERP EUB assessment Alternate Methods EUBMODELS BC must also be modelled using alternate methods

16 Implications Anticipate zones will change More effort required than previous simplistic approach –detailed documentation (explaining mitigation actions, variation of base case parameters, alternate methods) Responsibility on industry to ensure practical mitigation measures used Operational implications (e.g. ESD valve trip points)

17 Future Work Toxic load endpoints need further discussion –workshop on H2S toxicity –objective to assist EUB in selecting “safety” endpoint Ignition timing lower limit needs to be defined –workshop planned Address stakeholder comments Develop implementation strategy with stakeholders depending on impact compared to previous methods Revise Guide 71 – targeting fall 2004 EUBRISK and EUBHVP – EUBMODELS can be adapted possibly undertake in new fiscal year

18 EUBMODELS Structure Runs 54 times for met matrix

19 Summary of PROPOSED Requirements Requirements in draft – Requirements in Guide 71 still apply No “reduced EPZ” application (size of EPZ determined by varying parameters) - single EPZ can be taken forward to communities for discussion and fine tuning EUB review post public involvement as part of ERP assessment – REALISTIC MITIGATION Requirements applicable to new applications, ERP updates or interventions Provide clarity to assist in EUB decisions

20 Project Website