AASHTO Subcommittee on Construction Contract Administration Section Panel on Unbalanced Bidding Procedures Jerry Yakowenko (FHWA Headquarters) Dean Word.

Slides:



Advertisements
Similar presentations
Project Estimates There are two types of estimates 1Partial Payment Estimate 2Final Payment Estimate.
Advertisements

Metro Muncipal Agreement Program
Construction Contracting
Project Procurement Management
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Price Reasonableness Jan Giffin, CPPO, CPPB, VCO
Chapter 15 Closing the Bid. Objectives Upon completion of this chapter, you will be able to: –Describe the estimate summary process –Describe items that.
Massachusetts Department of Elementary & Secondary Education
Determining Responsive Bids and Responsible Bidders and Offerors Presenter: J. Peter Stamps, CPPO, VCO VA Dept of General Services.
Are you Sure About That? Pete Stamps CPPO, VCO Paul Higgins VCO.
November 19, 2013 Preparing a Successful RFP to get Desired Results.
Presented by: Kathryn Hodges, NH
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Project Cost Estimating A Synthesis of Highway Practices Presented by: Christine M. Fiori, Ph.D., P.E. Arizona State University.
Marcy Mealy Procurement Specialist CDBG Program
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding Virginia Concrete Conference Richmond, VA March 6, 2014.
FHWA Life Cycle Costs Analysis and Pavement Type Selection Guidance Maryland Concrete 2014 Conference March 18, 2014.
PROCEDURES FOR SELECTING THE CONTRACTOR
Washington Metropolitan Area District Office SBA.
Office of Business Development Training
1 CDBG Procurement Requirements For Local Officials.
INTRODUCTION TO PUBLIC PROCUREMENT
Preparing the GSA Schedule Pricing Proposal
Construction Engineering 221 Cost Estimating and Bidding.
Sole Source Training.
State DOT Retainage Practices Survey AASHTO Subcommittee on Construction Contract Administration Section August 2011 Prepared by: Tom Goldstein, FWHA Norm.
U.S. Small Business Administration
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Nabil dmaidi1 Bid Submission Documents A LATE BID IS NO BID.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
CIVL202 Construction Engineering I Tutorial 5 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
Mock State Aid Project County Highway Accountant’s Conference 2015.
CHAPTER#08 MANAGEMENT OF TECHNICAL PROPOSALS AND SPECIFICATIONS Lecture No. 08 Course: Engineering Management 19 april 2013 MED DEPARTMENT, U.E.T TAXILA.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
July 14, Rural Electric Cooperatives Procurement/Contracting Guidance Roger Jones Region VIII Disaster Assistance Division.
Municipal Assistance Bureau Recommended Bid Analysis Procedures June 24, 2014.
1 DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER SUPPORT.
Elevating the Quality of Life in the District Contracting and Procurement Division Information Session 2 Request for Proposal November 5, 2015.
Measurement and Payment
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Heritage Trust Fund Grant Orientation Session. HTF Staff and Contact Information Katrina Ringler Grants Manager ext. 215
Small Business and Subcontracting. Subcontracting for Small Business 6 steps to successful subcontracting 6. Report Contractor performance 1. Consider.
1. 2 Cost & Price Analysis Breakout Session # 312 Beverly Arviso, CPA, Fellow, CPCM, CFCM, Arviso, Inc. Melanie Burgess, CPA, CFCM, Burgess Consulting,
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Discussion of the Differences Public Works Law and Bid Law
AASHTO 2016 NTPEP Annual Meeting May 9, 2016
Bidding Strategies.
AASHTO Subcommittee on Construction Contract Administration Section Panel on Unbalanced Bidding Procedures Jerry Yakowenko (FHWA Headquarters) Dean Word.
Light Rail Transit Project
County Highway Accountant’s Conference 2015
Small Business and Subcontracting.
LOCALLY ADMINISTERED PROJECTS
Department of Community Development
Request for Proposal & Proposal
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
A Pricing Perspective on Contract Cost/Price Analyst
Second Avenue Subway Project Execution Strategy
Presentation transcript:

AASHTO Subcommittee on Construction Contract Administration Section Panel on Unbalanced Bidding Procedures Jerry Yakowenko (FHWA Headquarters) Dean Word (Dean Word Construction) Brenda O’Brien (Michigan DOT) Byron Coburn (A. Morton Thomas & Associates, Inc – representing Virginia DOT)

Background Bid tabulation and bid reviews are an important part of ensuring a transparent, fair and competitive procurement system. While the frequency of unbalanced bids is relatively rare, unbalanced bidding reviews are an important step in the letting and award process.

FHWA Regulatory Policy Definitions (23 CFR 635.102): Mathematically unbalanced bid means a bid containing lump sum or unit bid items which do not reflect reasonable actual costs plus a reasonable proportionate share of the bidder's anticipated profit, overhead costs, and other indirect costs. Materially unbalanced bid means a bid which generates a reasonable doubt that award to the bidder submitting a mathematically unbalanced bid will result in the lowest ultimate cost to the Federal Government.

FHWA Regulatory Policy (continued) 23 CFR 635.114 Award of contract and concurrence in award. “ (c) Following the opening of bids, the STD shall examine the unit bid prices of the apparent low bid for reasonable conformance with the engineer's estimated prices. A bid with extreme variations from the engineer's estimate, or where obvious unbalancing of unit prices has occurred, shall be thoroughly evaluated. (d) Where obvious unbalanced bid items exist, the STD's decision to award or reject a bid shall be supported by written justification. A bid found to be mathematically unbalanced, but not found to be materially unbalanced, may be awarded. (e) When a low bid is determined to be both mathematically and materially unbalanced, the Division Administrator will take appropriate steps to protect the Federal interest. This action may be concurrence in a STD decision not to award the contract. If, however, the STD decides to proceed with the award and requests FHWA concurrence, the Division Administrator's action may range from nonconcurrence to concurrence with contingency conditions limiting Federal participation.”

2004 AASHTO SOC CA Section Survey 1) Does your state have written procedures for determining when a bid is materially unbalanced? 2) In the past three years, how many times has a bid been declared to be materially unbalanced? 3) What was the disposition of these circumstances?

2004 Survey (continued) 27 State DOT responses were received by the FHWA Office of Program Administration. From 2001-2003: twelve states did not declare a bid to be materially unbalanced, eleven states had between 1- 4 materially unbalanced bids, two states had 5 –10 materially unbalanced bids, and two states provided a not applicable response. From 2001-2003 states responded to irregular bids in the following manner: eleven states rejected all bids and readvertised, four states indicated that they declared the irregular bid non-responsive and awarded to the lowest responsive bidder, and ten states responded with not applicable reply.

2004 Survey (continued) Seven State DOTs (CA, FL, NC, NV, TN, TX and WI) provided their formal procedures for evaluating unbalancing. Florida DOT’s procedure includes the use of an “Unbalanced Bid Item” program that utilizes a bell curve distribution to develop a statistical average unit price for comparison purposes. TxDOT’s procedure analyzes: unbalanced prices that vary from the estimate outside a specific range. utilizes a comparison of the balanced vs. unbalanced monthly payout rates calculates monthly payout during the life of the contract based on an assumed schedule. Wisconsin DOT Construction and Materials Manual, Section 2.10.2.1 Unbalanced Bid Analysis, defines significant item and provides a procedure for reviewing unbalanced bids: http://roadwaystandards.dot.wi.gov/standards/cmm/210.pdf Link to the 2004 Survey Summary: http://construction.transportation.org/Documents/2004surveyonmateriallyunbalancedbids.pdf

Caltrans – Low Bid vs. EE and Average Number of Bidders http://www.dot.ca.gov/hq/esc/oe/download.php?id=cprchart

The Contracting Industry’s Perspective Dean Word (Dean Word Construction)

A State DOT’s Perspective (Michigan) Brenda O’Brien (Michigan DOT)

Unbalanced Bids Michigan DOT Practices AASHTO Subcommittee on Construction August 17, 2010 Brenda O’Brien, Michigan Department of Transportation

Unbalanced Bids – Michigan DOT Audit Finding – Lacking a documented review of bids for unbalanced unit prices Unbalanced Low Bid Management Review Team (ULBMRT) established April 2009 Reviews every letting Identifies potential materially unbalanced bids In response to the audit finding, the ULBMRT was formed to review projects for potential unbalanced unit prices.

Unbalanced Bids – Michigan DOT Project Selection All projects over $5 Million AND Random selection of 1/3 of all projects let Screening Criteria Line item +/- 15% from engineer’s estimate Engineer’s estimate line item amount of +/- $1000 Secondary screening: Contractor’s historical bids for respective line item Virtually every project selected exceeds the screening criteria and requires review. Extended Bid Price = Contractor’s bid unit price x plan quantity

This is a sample of the report for each letting, listing the jobs that were either greater than $5 million or were randomly selected for review. For this particular letting, 35 projects were reviewed for unbalanced bids. This screen only shows the first 8 projects.

Bid Item Analysis Check This is a sample of the bid analysis report for a single project. This report varies in length for each project, depending on the number of individual bid items that exceed the screening criteria. This screen shows a portion of page 6 of the report for this project.

Unbalanced Bids – Michigan DOT First year results 21 lettings 353 contracts reviewed 65 contracts sent for further field review 7990 line items reviewed No individual bids rejected Two letters of clarification Two projects pulled, corrected, and re-let After the first year, it was decided to continue the ULBMRT process with electronic reviews, and meetings only when potential materially unbalanced items are discovered.

A State DOT’s Perspective (Virginia) Byron Coburn (A A State DOT’s Perspective (Virginia) Byron Coburn (A. Morton Thomas & Associates, Inc – representing Virginia DOT)

Unbalanced Bids Byron Coburn, PE AMT Associate Former State Construction Engineer August 17, 2010

VDOT History VDOT has not rejected a bid for being unbalance in over 10 years. VDOT’s methods have to date overcome the need to reject for unbalance. VDOT awards between 400 to 600 road work contracts per year. Nearly all contracts are unit priced type contracts. The actual number of units used during construction multiplied by the unit price is what the contractor is paid. However, VDOT does use some lump sum pay items but there use is limited.

How VDOT Estimates Just prior to receipt of bids, VDOT performs a rational (real world) estimate. The estimator puts together a virtual crew, gets quotes on materials, adds transportation cost, etc; mimicking what a contractor would do. This is done on all but very simplest of projects. This Engineer’s Estimate becomes in essence VDOT’s “bid” for the project. This is the estimate used to determine good value. The low bid should be within 7% of EE to be considered acceptable. When it is not, VDOT seeks to know why. Since VA Code allows for negotiation to bring price within the budget, and is otherwise silent to the analysis of bids, VDOT can ask the contractor questions about how he prepared his bid. It should be noted that there is no actual negotiations during this analysis; merely discovery. Therefore, federal regulations are not violated. The bids are examined primarily for ultimate value (or materially balance); and are primarily focused on the bottom line.

Memorandum of Understanding (MOU) If an unusual unit price is detected that suggests a mathematically unbalanced bid, the contractor is asked to explain why he priced the item that way. After meeting with the bidder, the VDOT estimator may consider the information gleaned from the contractor to re-price the item, and again makes a comparison. If the price is still outside acceptable range, VDOT usually uses a Memorandum of Understanding (MOU) to limit exposure to overruns. A MOU is a supplement to the contract signed by the contractor and the Department, outlining the terms of the agreement related to unbalanced item. Usually the MOU will limit the payment of the bid unit price to the quantity listed in the schedule of items. Any additional units (overruns) are agreed to be supplied at a new established price that is priced at the current market price. MOUs are used on about 25 times per year. A MOU can also limit the Contractor’s risk to underruns if desired.

Zero or Penny Bids VDOT will accept a zero or penny bid as a legitimate bid if the contractor can explain and demonstrate why he priced the item that way. The reason could include that the cost was included in other related items, the cost is being paid for on another project, there is no intrinsic value for that work, the contractor’s methods eliminate the need for that work, etc. Example: On a recent Woodrow Wilson Bridge project, the Contractor bid a penny on traffic control barrels. He had figured his total traffic control cost for the project, and it was his company’s practice to covered that cost in his traffic barrels. He explained that he was concerned that the quantity shown in the schedule of items would not actually be used, so he would not recoup his cost if indeed the barrels underran. His strategy instead was to added his traffic control cost to his mobilization and place no cost on the barrels. VDOT noted this in the MOU so the contractor could not later claim that he made a mistake.

Zero or Penny Bids Example: The contract calls for allying dust thru water truck hours. The contractor plans to control dust with calcium chloride, the cost for which he places in another item. Example: A contractor is currently working on an adjacent project that has surplus earthwork. He bids .01 for borrow on the new project because he is being fully compensated for disposal on the current project. This will likely ensure he is the low bidder.

Unusually Low Bids When the bottom line price is below the EE by 25%, and there is a 25% difference between 1st and 2nd bidders, VDOT will allow the low bidder to withdraw without penalty if the contractor has made a mistake. If the 1st bidder wants to withdraw his bid, the 2nd bid is analyzed in the same fashion. If the 2nd is deemed a good value, VDOT may make award to the 2nd.

Rejection of Bids & Re-advertisement State law gives the agency the right to reject all bids if deemed in the best interest of the Commonwealth for any reason other than to eliminate a particular vendor. Re-bids in competitive markets usually result in lower bids with the next advertisement. Last year VDOT saved about $8 million by re-advertising projects where bids exceeded the estimate. The saving is primarily due to identifying the risk through the discussions with the contractor, and then mitigating that risk in the second advertisement.

Questions? Should be directed to ; Don Silies State Contract Engineer At email address Don.Silies@VDOT.Virginia.gov