Draft document – Work in progress

Slides:



Advertisements
Similar presentations
Den Hague 10/10/11 Yves Langer Capacity pricing workshop.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Cross-Regional Roadmap for Intraday DRAFT Updated 31/10/2011.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
1 Intraday in the CWE region NWE and Bilateral initiatives Common RCC CSE - CWE 28 September 2010.
Assessment of differences in market designs in the CS region Milan 18 July 2008.
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
CM Guidelines, Implicit Auction as a Congestion Management Method Baltic Electricity Market Mini-Forum 24 April 2009 Jyrki Uusitalo, Fingrid Oyj.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
Introduction of an Intraday market on the Italian borders for the year 2011 Terna proposal Electricity Regional Initiative – CSE Region 15th Implementation.
Italy-France Cross-border Intraday: Technical feasibility study CSE SG Group meeting Rome, 15 May 2012.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
FUI Electricity region: Update on Congestion management CRE SG Meeting - 3 December 2008.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
CASC.EU SA and its role in Explicit auctions 16/11/2010 CASC.EU SA 1.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Capacity Trades. Rules and Regulations Exchange rules must comply with a Contract on Accession to Wholesale Power Market’s Trading System Exchange commodity:
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
1 page 1 Discussion on Intraday Capacity Pricing NWE ID project
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement 26 Nov 2007 John Prime.
Continuous Cross-Border Implicit Intraday Trade Status update XXI. Florence Forum Dec 05th, 2011.
1 SPANISH HUB DEVELOPMENT 17 th IG meeting 2 nd November 2011.
Cross Border Intraday on the North Italian Borders Introduction Forum Rome, 13 th March 2012.
Is there a need for a change?
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
3 rd Stakeholder Group Meeting 1 February 2007 France-UK-Ireland REM Workstream on Congestion Management Conclusions of the first workshop (11 January.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
SEM Regional Integration Decision Paper FUI Stakeholder Group Meeting 16 June 2010.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
SESSION 1. Part 4 IMPORTANCE OF INTRADAY AND ADJUSTMENT MARKETS José Javier González Market Operations Director OMEL 2008 APEX Conference Sydney, October.
Introduction of an Intraday market on the Italian borders for the year 2011 Electricity Regional Initiative – CSE Region Milan, 16/11/2010.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
Agenda Pag. 1 I.4M MC – Common parts II.Further Information on Romanian Market 1.Regulation for DAM organization and functioning with respect to price.
Development and Implementation of a Coordinated Model for Regional and Inter-Regional Congestion Management Development and Implementation of a Coordinated.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
ANRE ROMANIAN ENERGY REGULATORY AUTHORITY Regulation of operation and organization of the electricity day-ahead market with the price market coupling mechanism.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Roadmap for the common cross border intraday solution in the NWE area
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
SWE Day- Ahead market coupling
Continuous Cross-Border Implicit Intraday Trade Status update
Feedback on the SWE coupling Public Consultation
Regulators’ update on Congestion Management and Balancing
NWE Cross Border Intraday
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft document – Work in progress
29th April 2014 Teleconference
Intraday cross border continuous market and optional Intraday auctions
Intraday cross border continuous market and optional Intraday auctions
BSP SouthPool En.trading 2016
Presentation transcript:

Draft document – Work in progress Iberia/Spain-France-Germany Cross-border Intraday: Technical feasibility study EPEX-OMIE Draft document – Work in progress

Agenda Background Summary High level requirements IT requirements Clearing and Financial settlement

Background Current France-Spain Cross-border Intraday trading solution: TSOs (REE-RTE) are currently running two explicit intraday auctions to allocate the XB transmission capacity rights of the available capacity after the Day Ahead Market/Nominations and the previous Intraday Markets/Nominations. The Intraday explicit auctions of rights , as the Day-Ahead explicit auctions of rights, use the Use-it-or-lose-It principle Current Spanish/Iberian and France-Germany intraday markets Target model on cross-borders Intraday trading according to ACER’s Framework Guidelines on Capacity Allocation and Congestion Management Cross-border implicit continuous trading Embedding a criteria for the pricing of the XB ID allocated capacity EPEX Spot and OMIE are carrying a study to analyze possible solutions and features to connect France-Germany and Iberian/Spanish ID markets with an Implicit continuous trading market Spanish/Iberian intraday market French – Germany intraday market 6 Intraday Implicit auctions : 2 auctions in D-1 4 auctions in D Intraday Implicit Continuous trading

Agenda Background Summary High level requirements IT requirements Clearing and Financial settlement

Summary The proposal for integrating the Iberian/Spanish Intraday Implicit Auctions and the France-Germany Implicit continuous ID market is very similar (except the number of IM Auctions) to the solution presented by EPEX and GME in the CS IG back in May 2012 The solution can be applied with either the French-Germany Implicit continuous ID Market or with the future European-wide SOB/CMM interim or enduring Implicit ID trading system. The local part of the processes will have to be dealt locally – main points related to these processes are also presented in the following slides

Agenda Background Summary High level requirements IT requirements Clearing and Financial settlement

High level requirements Spanish/Iberian intraday market French – Germany intraday market 6 Implicit IM auctions: It is the only possibility for Iberian Market participants to balance themselves, prior to real time Markets. No OTC bilateral contracts are permitted after Day-Ahead timeframe Continuous Implicit trading Possibility for French and German market participatns to balance themselves on the PX market or OTC, locally of cross-border Continuous Implicit trading, taking into account available cross border capacities at any moment for international trades Before gate closure of each Iberian IM Auctions, Participants open positions from the Implicit continuous trading Market are transferred by the participants to the IM auctions when they decide to do so selecting the IM auction that they decide Spanish/Iberian order book in the continuous Implicit Market is closed for hours which cannot be traded in a later Spanish IM auction, therefore the France-Spain capacity is not tradable in this hours OMIE Market parties are counterparts for Spanish bids (as in the Day-ahead Market) with 100% Banking collaterals ; ECC (EPEX CCP) is counterpart for French and German bids; OMIE and ECC manage the settlement of the XB trades Explicit cross-border access to the capacity subject to a common position from the concerned Regulators The way of dealing with the Portuguese area in ID is subject to Regulators decision

Continuous Implicit XB platform linked with Iberian implicit auctions Intraday Cross Border trading system(SOB) Bids Bids EPEX members OMIE Bids Spanish /Iberian Members Capacity information TSO Optional Order registration Capacity information Order registration CMM TSO Capacity information Spanish intraday auction OTC ?

Process: Transfer of Spanish/Iberian bids matched in the Continuous Market into bids in the IM auctions Net open position of bids matched in the cross-border Implicit intraday market for delivery to or from the Spanish/Iberian area are transferred into the Spanish/Iberian IM Implicit auctions as bids and offers according to the following criteria: Purchasing bids in the cross border market are transferred into the IM auction as selling offers (and vice versa) Bids and offers are located in the Spanish zone of the Spanish IM auction Bid price at which the matched order in the cross border market is transferred to the IM auction is freely set by the market participant: set as market price (zero for selling offers and maximum price for purchasing bids) set equal to the price of the matched order in the cross-border market Any value decided by the participant Optionally, OMIE could do it in the name of the participant according to their instructions In case the bids/offers transferred to the Spanish IM auction are not matched (lack of liquidity or not competitive price on the bids) the Spanish market participant is unbalanced in the Spanish area Firmness of the cross border nomination is independent from the local nomination/matching process and in any case ensured

Different Price limits in the different Markets Iberian IM auction and in the French ID market have different price limits: 0 €/MWh; 180,03 €/MWh in the Iberian IM market -9.999 €/MWh; +9.999 €/MWh in the French-Germany ID market Suggestions: Less restrictive: Not to consider the issue and participants will act accordingly in the Markets, knowing the rules and the different price limits. Spanish/Iberian participants can be allowed to buy at negative price and to sell at prices over 180,03 €/MWh in the XB ID market Price limits of Spanish IM auctions would not be changed Bids in the Spanish ID market need to respect the price limits Restrictive: Not allowing cross-border matching, in case prices on French side exceed Iberia/Spanish price limits (Iberian/Spanish participants are prohibited to buy and sell at negative price and at prices over 180,03 €/MWh in the XB Continuous ID market)

Timeframe French/European Implicit continuous trading and Iberia/Spanish ID Implicit auctions Current French-Germany Implicit Intraday Continuous «European» Implicit Intraday Continuous including Iberia/Spain IBERIAN INTRADAY 6 IM * TSOs TO PROVIDE CROSS BORDER CAPACITY BY A CERTAIN TIMES (15 HOURS) – In order to allow that all 24 hours are tradable on the XB ID Continuous market on the French-Spanish border

Timeframe issues Negotiation in multiple IM Implicit auctions of the same delivery hours. For example, IM3 negotiating delivery hours from the 5th to the 24th hour, and IM4 negotiating delivery hours from the 8th to the 24th hour. Particpants are free to integrate their matched net trades in the continuous trading Market in the Spanish IM auction of their choice, but if they do not do it they are subject to deviations costs. TSOs need to provide cross-border capacity by a certain time (3pm)in order to allow that all 24 hours are tradable on the XB ID Continuous market on the French-Spanish border

Agenda Background High level requirements IT requirements Clearing and Financial settlement

IT requirements Shared Order Books /Congestion Management Module System (SOB/CMM) in order to allow that, provided that there is available capacity: Order books have to be updated simultaneously according to the capacity values sent to the SOB/CMM Bids submitted to one local order book are simultaneously shown on the other order books provided they are compatible with the updated values of XB capacity There is a perfect synchronization of all order books Cross matching of bids submitted to different order books is supported Time stamp of the bids is similar (crucial to correctly manage priority of bids with same price) Both order books would be hosted in the same platform:

Agenda Background Summary High level requirements IT requirements Clearing and Financial settlement

Hypothesis: OMIE is connected to the SOB through an API Hub FR Hub SP RTE Capacity Platform REE Capa. FR-SP EPEX trading system 10 MWh @ 50 € Trading Financial settlement cycle of OMIE and EPEX CCP have to solved SOB Seller A OMIE Buyer B Financial settlement of the energy 500 € 500 € 500 € Seller A ECC OMIE Buyer B Seller A ECC OMIE Buyer B Nominations Export Import Buy A B Export Import Sell Purchase “A sells to B” Sell A B TSO A TSO B “B sells to A” “Nomination” Energy shipping * To be made consistent with the Day-Ahead solution under discussion between EPEX(ECC) and OMIE

Thank you for your attention