TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Distance Relay Specification WECC TSS January 23,2014 Amos Ang.

Slides:



Advertisements
Similar presentations
Sequence Data, Power Flow & Transient Stability (PF & TS) MSRATF - July 10, 2013 Joe Seabrook.
Advertisements

Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
Model Specification Requirements MSRATF Meeting – Mar 11, 2013 Stephanie Lu, MVWG Chair Seattle City Light.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) May 15, 2013 Joe Seabrook Puget Sound Energy.
Brett Wangen, Director of Engineering WECC RC Update to PCC Planning Coordination Committee Meeting October 24, 2013.
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities August, 2014 Joe Seabrook Puget Sound Energy, Inc.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Activities May, 2014 Joe Seabrook Puget Sound Energy, Inc.
GENERATOR PROTECTION.
Composed By: Angel Aquino, Ph.D. Presented by : Mark Laufenberg, Ph.D. WECC Joint User Group February 10-11, 2015 Colstrip Acceleration Trend Relay Model.
DISTRIBUTED GENERATION EFFECTS ON PROTECTIVE RELAYING APPLICATIONS.
CIGRE 7-10 September 2009, Moscow
Analysis Concepts and Principles
SwE 313 Introduction to Rational Unified Process (RUP)
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Current Differential Relay Specification WECC TSS August 20,2014 Amos Ang.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
PSRC Line Protection Subcommittee Working Group D4
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
KD Relay Application: Compensator distance relay that provides a single zone of phase protection for all three phases. It provides tripping for phase to.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Cigre B5 – 06 Working Group Presentation Protection and Control Asset Program Management John Robertson March 25, 2008.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Boundary Assertion in Behavior-Based Robotics Stephen Cohorn - Dept. of Math, Physics & Engineering, Tarleton State University Mentor: Dr. Mircea Agapie.
© Property of ERCOT /06/20041 Overview of SPS in ERCOT February 5, 2004.
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Slide 1 Line Current Differential Application on Short Lines Presentation to SSCET October 26 th, 2012.
Tracy Rolstad TSS Chair TSS Chair Report March 2014 Salt Lake City, UT 1.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
ECE 476 Power System Analysis Lecture 22: System Protection, Transient Stability Prof. Tom Overbye Dept. of Electrical and Computer Engineering University.
Announcements Read Chapters 10 and 11
VLSI AND INTELLIGENT SYTEMS LABORATORY 12 Bit Hamming Code Error Detector/Corrector December 2nd, 2003 Department of Electrical and Computer Engineering.
Condition Testing. Condition testing is a test case design method that exercises the logical conditions contained in a program module. A simple condition.
Steve Rueckert Director of Standards TPL Discussion – PCC Steering Committee March 25, 2014.
WECC-0100 Scope, Content & Status Update Rikin Shah, PAC Orlando Ciniglio, IPC WECC TSS Meeting, Salt Lake City, UT January ,
Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.
N-1-1 Contingency Analysis & Relay Protection 4 th BTA Presentation Bob Smith Manager Transmission Planning June 6, 2006.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
NERC LMTF: Current Activities Ryan Quint, PhD, PE Staff Coordinator, NERC Load Modeling Task Force WECC MVWG Meeting June 2016.
Power System Protective Relaying-Part One
Nodal Planning Go Live Austin, TX February 3, 2011
Announcements Design Project has firm due date of Dec 4
NERC Published Lessons Learned Summary
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
ECE 476 Power System Analysis
EAS Lessons Learned Summary
Presented by: LADWP November 14, 2017
Kenneth Silver Los Angeles Department of Water & Power
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
Comanche-Walsenburg RAS Input Modification
Specifications Updates and Approval
Structure–Feedback on Structure ED-2 and Task Force Proposals
CMPLDWG Composite Model with Distributed Generation Approval
Protection Relay Modeling for Transient Stability Simulation 10/26/2016 CJ Jing, David Franklin, Kevin Moran.
NERC-WECC Coordination
Power System Protective Relaying-Part One
Joe Seabrook Puget Sound Energy, Inc.
ESS VIP ICT Project Task Force Meeting 5-6 March 2013.
HARRY ALLEN TRANSFORMER REMEDIAL ACTION SCHEME (RAS)
CMPLDWG Composite Model with Distributed Generation Approval
Comanche-Walsenburg RAS Input Modification
Kenneth Silver Los Angeles Department of Water & Power
Distance Relay Specification
Joe Seabrook Puget Sound Energy, Inc.
Presentation transcript:

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Distance Relay Specification WECC TSS January 23,2014 Amos Ang

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 2 Agenda  Purpose  Background  Relay Model Specification  Next Steps

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Purpose  To get approval from TSS for model specification  To model relay behavior in powerflow and transient stability analysis  To model interactions between RAS / SPS and Protection relays  To facilitate transfer of information from System Protection to Transmission Planner  Established a phased approach to implementing more functionality  To satisfy the new TPL standards of modeling the actions of protection relays for compliance 3

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Background  Started with September 8 th blackout  Identified three zone distance relays that actuated  Modeling SPS and Relays Ad-Hoc Task Force (MSRATF) was formed to gather all subject matter experts to work on the recommendations from Sept. 8 th event  One of MSRATF sub group was tasked to deal with relays  Members of the sub group included input from Planning and Protection engineers  Received MV&WG Approval in December

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Existing Relay Models 5 ZLIN1PSLF No transfer trip capability; No load encroachment function; No blinders DISTR1PSSE Transfer trip capability, but requires input parameters for both end of line if no transfer trip; No load encroachment function; Limited blinder functionality; no out of step functionality ZPOTTPSLF 2 zones of protection; Assumes transfer trip; No load encroachment function; No blinders

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Distance Relay Specification 6

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Main Components of the Relay  Generic Distance Relay Main Model  Zone Detection Sub-Model  Load Encroachment Sub-Model  Blinders Sub-Model  Transfer Trip Scheme Sub-Model 7

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Generic Distance Relay Main Model  There are four main functions of the main model – Perform the logic needed from the outputs of the other sub- models – Which elements to trip (up to 5 elements) – Perform the reclosing scheme if it is available – Houses the timings for all the zones 8

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Zone Detection Sub-Model  There are 4 zones that can be defined per distance relay main model  Units are in Primary Ohms  6 different zone shapes to cover most of what is available to the Protection Engineer – Lens Shape – Circle Shape – Tomato Shape – Rectangular Shape – Reactance Distance – Impedance Distance  Ability to perform logical operations up to 3 different shapes 9

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Load Encroachment Sub-Model  Function is to prevent relay from operating when load current comes into the detection zone  Units are in Primary Ohms and degrees 10

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Blinders Sub-Model  Ability to shape the zone shape 11

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Transfer Trip Scheme Sub-model  Transfer Trip is the term of how the relay would trip the other side of the line  This model specification starts with the simplest of them all which is the step distance transfer trip scheme – once it detects and “times out” then it trips the elements defined in the main model  Building upon this sub-model would enable the Transmission Planner to have the correct timings of which breakers opens first and how much delay 12

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Next Steps  Phase 2 – Develop ways to translate the relay settings to the powerflow / stability programs (automated?) – More zone shapes (if needed) – Out of step blocking / tripping functionality – Pseudo Code for Transfer Trip Scheme and Reclosing Scheme (adopt and modify the SPS / RAS language being developed) – Stock transfer trip schemes – Stock reclosing schemes – More reclosing schemes (as needed) – Ability to select what part of the relay “failed” – More than 3 tap lines – checking impedance input  Phase 3 – Modeling in the unbalanced phase environment 13

TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT Any Questions? 14