Ted Craddock, DWR 2014 NWHA Conference Oroville Facilities FERC Project No. 2100.

Slides:



Advertisements
Similar presentations
Washington Department
Advertisements

Assessing effects of Columbia River Basin anadromous fish flow management on the aquatic ecology of the Henrys Fork watershed A Proposal By The Henrys.
Salmonid Population and Habitat Monitoring in the Lower Columbia/Columbia Estuary Provinces Oregon Department of Fish and Wildlife.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
2010 Squak Valley Park Restoration Project City of Issaquah.
COMPREHENSIVE FLOODPLAIN MANAGEMENT : Promoting Wise Uses of Floodplains CA Department of Water Resources/ CIFMCG Workshop July 2006.
California State Water Project & MWD Tours. The Issue…..  The vast majority of water in the State of California falls in the top 1/3 of the state (north.
California Recycled Water Plan California Recycled Water Plan A comprehensive approach to California’s long-term water supply By Gregory B. Ryan and Meagan.
Spokane River Project License Implementation Spokane River Forum Speed Fitzhugh FERC Project No March 26, 2013.
Dave Samson CA Department of Water Resources Northwest Hydroelectric Association 2011 Annual Conference "Avoiding a Dam Midlife Crisis" THE CALIFORNIA.
SOLAR IMPACT ON FYI Kevin Meikle, Architect Airports Planning Manager 4995 E. Clinton Way Fresno, Ca (559)
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
Cedar River Instream Flow Management Balancing Certainty and Flexibility.
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Water in California: Self-induced Scarcity Waterscape International Group.
‘The world’s greatest plumbing system’ An example of how a river is managed to use its water as a resource.
Drought and the Central Valley Project August 2014.
Hydro Electricity Generation What is Hydroelectricity?  the production of electrical power through the use of the gravitational force of falling.
Flow 2008 Don Kraus, P.E., General Manager The Central Nebraska Public Power and Irrigation District.
Hydroelectric Power
By: Kelsea and Troy.. What is hydropower? Hydropower is energy that comes from the force of moving water. The fall and movement of water is part of a.
Bureau of Reclamation Overview Christopher Cutler Deputy Chief Boulder Canyon Operations Office.
California Natural Resources Agency Department of Water Resources Small Business Program Lorie Hall, SB/DVBE Advocate Division of Management Services January.
You thought the CVP was large. No Bureau requirements Half a million newcomers per year West side of San Joaquin Valley needs water Some Farms 224,000.
LARGE DAMS AS A SOURCE OF RENEWABLE ENERGY Glen Singleton, Ph.D., P.Geo., B.C. Hydro Canada.
Southern California Water Committee March 26, 2010 Ontario KARLA NEMETH, Natural Resources Agency.
Lewis River Wildlife Habitat Management Program February 20, 2008.
Blackstone Hydropower Status Report 3 rd Annual River Users Conference Blackstone Valley Tourism Council Tricia Jedele, Conservation Law Foundation Bruce.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Rick Swanson USDA Forest Service U.S. Forest Service: C&I’s for: The World’s Largest Water Company U.S. Forest Service: C&I’s for: The World’s Largest.
California Geology - 4 California Water Project California has several major rivers, canals, and aqueducts.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Review of the Nipissar Lake Replenishment Project, Rankin Inlet, Nunavut September 25, 2014 NWB Hearing Presentation Type A Water License Amendment Application.
Changing Focus on Watershed Issues < 1960’s: Water supply and flooding > 1960’s: Land use effects on water quality > 1980’s: Riparian and aquatic ecology.
CALIFORNIA DEPARTMENT OF WATER RESOURCES Preparations for Flood Season DFM Flood Maintenance Office Presented By: Noel Lerner, Former Chief Flood.
SWP Recreation and the Oroville Facilities RMP Mark E. Andersen, P.E., Assistant State Water Project Deputy Director Northwest Hydropower Association February.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Water Power By: Andrew Paulshock.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Three Rivers Levee Improvement Authority June 8, 2007 Presentation to the State Reclamation Board Proposed Feather River Setback Levee.
New Technologies: Fish & Wildlife Permitting Issues Cherise M. Oram STOEL RIVES LLP NWHA Annual Conference – February 20, 2008.
Natural Resource Damages (NRD) Assessment and Restoration Update
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
February 18, 2014 Federal Energy Regulatory Commission 1.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
1 December 19, 2007 North-of-the-Delta Offstream Storage Project Overview State of California Department of Water Resources U.S. Department of the Interior.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Upper San Joaquin River Basin Storage Investigation ACWA Regions 9 and 10 Carlsbad Water Summit U.S. Department of the Interior Bureau of Reclamation State.
Watershed Restoration Overview for the Klamath Basin.
1 September 13, 2007 North-of-the-Delta Offstream Storage ACWA Regions 9 and 10 Carlsbad Water Summit North-of-the-Delta Offstream Storage ACWA Regions.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
Changes to the 1995 Water Quality Control Plan Program of Implementation Presented by: Steve Ford Department of Water Resources.
Non-Federal Development at Reclamation Facilities.
Should Fish PM&E Compliance = Success?. Skagit Project History  Relicensed 1995  18 Years of PM&E Implementation  30 Year License remains in effect.
NOAA’s National Marine Fisheries Service Biological Opinion for Water Supply, Flood Control Operations & Channel Maintenance by the Army Corps, SCWA, and.
Ecosystem Restoration Program Focused Proposal Solicitation Package 2010/2011 Prepared by ERP Implementing Agencies: California Department of Fish & Game.
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
California Department of Fish and Game Inland Desert - Region 6 San Jacinto Wildlife Area A Presentation to the California Fish and Game Commission March.
1 Bonneville Power Administration. 2 BPA markets power from 31 federally owned dams, one non-federal nuclear plant, and wind energy generation facilities.
Add: ->>In 2014, DWR completed several analyses of energy used in California’s water sector and launched its water-energy nexus webpage  hyperlink to.
1 Improving Habitats along Delta Levees Issue Paper Proposed for Council Endorsement Presented by Jessica Davenport January 28, 2016.
Biological Opinions and ESA Consultations Ritchie Graves NMFS-NWR Hydropower Division Portland, Oregon February 19, 2013.
Savannah River Projects
In-Delta Storage Program
State Water Project 34 storage facilities, reservoirs and lakes
In-Delta Storage Program
Transboundary cooperation in the Dniester River basin
Lake Elsinore Hydro Project
Presentation transcript:

Ted Craddock, DWR 2014 NWHA Conference Oroville Facilities FERC Project No. 2100

State Water Project Overview Serves 25 Million Californians and 750,000 Acres of Farmland Serves 25 Million Californians and 750,000 Acres of Farmland Includes: - 33 Storage Facilities - 20 Pumping Plants - 4 Pumping-generating Plants - 5 Hydropower Plants miles Canals & Pipelines Includes: - 33 Storage Facilities - 20 Pumping Plants - 4 Pumping-generating Plants - 5 Hydropower Plants miles Canals & Pipelines California’s fourth largest energy producer hydropower California’s fourth largest energy producer hydropower Other benefits include: - flood control - recreation - Delta salinity control - environmental benefits - power grid stability Other benefits include: - flood control - recreation - Delta salinity control - environmental benefits - power grid stability

State Water Project FERC Licenses Oroville Facilities Oroville Facilities FERC Project No FERC Project No MW Capacity 762 MW Capacity South SWP Hydropower FERC Project No South SWP Hydropower FERC Project No ,679 MW Capacity 1,679 MW Capacity  DWR: 404 MW  LADWP: 1,275MW  LADWP: 1,275 MW Pine Flat Transmission Line FERC Project No Pine Flat Transmission Line FERC Project No. 2876

Oroville Facilities Power Developments Feather River

Oroville Facilities FERC Licensing Original FERC License Period Original FERC License Period February 1, 1957 to January 31, 2007February 1, 1957 to January 31, Relicensing Settlement Agreement 2006 Relicensing Settlement Agreement Proposed 50-year Term with License Conditions and Settlement Articles: Proposed 50-year Term with License Conditions and Settlement Articles: EnvironmentEnvironment Cultural ResourcesCultural Resources RecreationRecreation Land Use and ManagementLand Use and Management Local ProjectsLocal Projects DWR Preparing for FERC License Issuance DWR Preparing for FERC License Issuance Performing Early Implementation Activities Performing Early Implementation Activities

Oroville Facilities Habitat Improvement Plan

Oroville Facilities LFRHIP Components 1.Spawning Gravels 2.Channel Improvements 3.Structural Habitat 4.Fish Weir 5.Riparian and Floodplain 6.Hatchery Improvements 7.Water Quality Monitoring 8.Oroville Wildlife Area 9.Instream Flow and Temps.

Oroville Facilities LFRHIP Process Develop (Update) Plan Consult Ecological Committee FERC Review and Approval Implement Monitor - Physical Elements - Biological Response Annual Reports 5-Year Assessments and Reporting

Oroville Facilities LFRHIP Integration Develop (Update) Plan Consult Ecological Committee FERC Review and Approval Implement Monitor - Physical Elements - Biological Response Annual Reports 5-Year Assessments and Reporting

Oroville Facilities Early Implementation Spawning Gravels Install 8,300 cy gravel in Feather RiverInstall 8,300 cy gravel in Feather River Monitor salmonid/steelhead useMonitor salmonid/steelhead use Assess substrate permeability in spawning areasAssess substrate permeability in spawning areas Evaluate effectiveness in improving spawning habitatEvaluate effectiveness in improving spawning habitat Results support proposed spawning gravel PM&EResults support proposed spawning gravel PM&E

Oroville Facilities FERC Project No Thank you