Bob Williamson Head of Operational Planning 3 rd Party Academic Access to NNL Central Lab – Commercial Arrangements.

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

© Hyder Consulting Pty Ltd Local Government Waste Summit 2006 Total Cost Approach for Waste Management Christine Wardle 10 February 2006.
Subpart S - SEMS September 11, 2012 Prepared by: BSEE, Office of Safety Management Author: Jason Mathews.
Indirect Costs Program (ICP) Accountability, Eligibility, Compliance and Monitoring.
Health and Safety - an update Ian Gillett Safety Director.
Contractor Safety Management
Data-Sharing and Governance Consultation ANALYSIS OF RESPONSES.
Conversation on the Chemical Facility Anti-Terrorism Standards (CFATS) and Critical Infrastructure Protection Chemical-Terrorism Vulnerability Information.
Explosives and security risk substances on mine sites – roles and responsibilities current as of December
1 Disclaimer The following information was presented by Andrew Levy of the Office of General Counsel of DHS on June 12, 2007 at the 2007 Chemical Sector.
Standard of Care California Health & Safety Code § § Consumer Product Safety Commission (CPSC) Pub. No. 325 –Handbook for Public Playground.
Responsible Sponsorship A case study Dr Birgit Whitman, Head of Research Governance.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Laboratory Personnel Dr/Ehsan Moahmen Rizk.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Regulatory Body MODIFIED Day 8 – Lecture 3.
Supplementary Training Modules on Good Manufacturing Practice
Quality Assurance/Quality Control Policy
WHS Management Plans.
QC | Slide 1 of 16 June 2006 Good Practices for Quality Control Laboratories P art 4: Inspecting the laboratory Supplementary Training Modules on Good.
Safe Working Practices - Contents
1 The Standards Based Management System Approach to Deploying the Environmental Management System at Oak Ridge National Laboratory Dr. Fay Frederick, Division.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Authorization and Inspection of Cyclotron Facilities Staff Requirements.
Authorization and Inspection of Cyclotron Facilities Inspections.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
K RIEL C OLLIERY Anglo Coal Contractor Management.
HERA Higher Education Role Analysis ITSS Conference HIGHER EDUCATION ROLE ANALYSIS Sarah Haworth John Dickson.
ASSESSMENT TASK 5 PRESENTATION ON : THE LEGAL RESPONSIBILITIES. THE LEGAL RESPONSIBILITIES. THE LEVEL OF THE STAKEHOLDER. THE LEVEL OF THE STAKEHOLDER.
Health and Safety Policy
Safety organization and training. The biosafety officer and biosafety committee A safety policy, A safety manual, and Supporting programmes for their.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
10/16/2015 Roles and Responsibilities of Principal Investigators/ Program Directors/ Project Directors.
Safety Auditors Conference 2005 A Practical Approach…….
Name Position Organisation Date. What is data integration? Dataset A Dataset B Integrated dataset Education data + EMPLOYMENT data = understanding education.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ESTONIA.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Regulatory Authority.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
AuthorizationAuthorization. Authorization Objectives To provide understanding of the authorization process and the procedures for its implementation.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
6Standards for the planning, design and construction of ports and terminals OBJECTIVE: To ensure that Ports and Terminals are planned, designed and constructed.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
Safety Training - Unit Management Why it is essential, who needs it and how to go about it February 2015 Dr Emer Bell Integrated Risk Solutions.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Roles & responsibilities Involving staff in safety management December 2015 Dr Emer Bell Integrated Risk Solutions.
Enforcement via Policies and Procedures. Processes and Procedures These are boring, tedious, time consuming…… BUT THEY ARE ESSENTIAL They must be written.
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Research Student Supervision – Update 2012 Dr Ann Hartley.
CNOOC SES Ltd. VQHSE MS Vendor QHSE Management System
HSE Interview Questions / Answers Series (Part 1)
National Food Control Systems
SESSION 3 Policy Framework
Radioactive waste repositories
Clinical Engineering Lecture (3).
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
PTW – Permit To Work. What is PTW? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific time.
OHS Staff Introduction Training
CHAPTER 5 EVENT LEGAL COMPLIANCE
Radiation protection organisation
Module 5 Liaison and Managing Relationships with Stakeholders
About EverydayComply A Solution designed to:
IT OPERATIONS Session 7.
Pharmacovigilance inspections: what HPRA expects
Radiation Safety Information Management System (RASIMS)
بسم الله الرحمن الرحيم Dr. Hany Sallam & Regulatory Activities
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Bob Williamson Head of Operational Planning 3 rd Party Academic Access to NNL Central Lab – Commercial Arrangements

Commercial Arrangements Direct Project Costs Indirect Project Costs Funded through University Funded by NDA as part of NDA / DCF Agreement

Commercial Arrangements Indirect Project Costs include cost of Building overhead (eg rent & rates, utilities, security) Routine Maintenance of generic lab infrastructure & equipment (eg gloveboxes, fumehoods, SEM) General lab management (eg DAPs, laundry, health physics) Direct Project Costs charged by NNL include cost of Processing security clearance Safety / security training Safety supervisor cover Project consumables Project-specific equipment Project specific decommissioning / waste costs

Agenda NNL and it’s stakeholders Requirements for access to the Central Laboratory Conducting Research Safely Progress to date

NNL and the Stakeholders Nuclear Decommissioning Authority Superior Landlord Sellafield Ltd Landlord Office of Nuclear Regulation Licence Instrument Security Environment Agency Regulator National Nuclear Laboratory Lease Holder

Access to Central Laboratory “Licence to Occupy” One per academic institution Access Agreement One per academic institution Third Party User Safety Requirements Written Response

What you get for access Medium and High Activity fumecupboards, gloveboxes, and now the potential of HA cells Analytical equipment Desks and IT No access to Sellafield IT infrastructure Access to relevant NNL operational procedures NNL support to training and compliance

Requirements for access to Sellafield Site Security Vetting Applications for site pass (P4) Sellafield Site Induction Details site requirements, standards for behaviours and emergency arrangements

Conducting Research Safely Safe Operations are underpinned by: 1.Training 2.Work Authorisation 3.Good supervision 4.Adherence to local rules

Conducting Research Safely Training Local building and laboratory arrangements Emergency response Knowledge of legal requirements Specific fumehood / glovebox training Supervisory training (where required) Courses are a combination of NNL-led, SL-led and (where applicable) TPU-led training

Conducting Research Safely Work Authorisation Work requests are reviewed by NNL operations staff Submitted to SL for approval A work request is expected to contain: A description of the work Risk assessment of the task Supplementary assessments and instructions

Progress to date Process shown to work Working on an active site requires more preparation SL have audited and inspected TPU activities and are satisfied Good partnership between all parties