COLD STORAGE AND LABORATORIES ROSLIN OLD TO NEW AND MAKING THE BEST OF WHAT YOU HAVE.

Slides:



Advertisements
Similar presentations
School of Community Education & Training
Advertisements

Lesson 9 Design & Construction of Food Premises & Equipment
Passive house. Definition A Passive house is a buildings with good comfort conditions during winter and summer, without traditional space heating systems.
Organise Workplace Information
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
Refrigerators.
HACCP School Development Project Chapter 9 Storage By Andrea Boyes and Julia Wood Srednja šola Zagorje.
ultra-low freezers ultra-low freezers: -80 energy consumption 15 – 20 kWh/day -manufacturer data -validated by monitoring.
ENERGY CONSERVATION TIPS Seminar on Energy Efficiency and Conservation (EE&C) for Residential and Academe Sector - An “EARTH HOUR” Pre-Activity.
State Data Center Re-scoped Projects With emphasis on reducing load on cooling systems in OB2 April 4, 2012.
Kenya AIDS Vaccine Initiative
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
1 Experimenting with Efficiency: Greening the Grant T EAM GREEN DINOSAURS Sandeep Dey, Wan Yin Cheung, Yung Nguyen Michelle Tang, Sze Wun Wong.
RECEIVE AND STORE KITCHEN SUPPLIES AND FOOD STOCK
Lab Energy Management Big Ten Mechanical & Energy Conference October
HACCP and GMP in school restaurants School Development Project STORING AND KEEPING FOODSTUFFS.
Welcome to RAI, the future of collaborative Project Risk Management Overview of Project Risk and Issue Management RAI for the Project Manager RAI for the.
Module 2, Office Layout.
DATA CENTERS INTRODUCTION Dr. Natheer Khasawneh. Goal… How Data Centers are critical environments for companies. Aspects of a Data Center's physical component.
Lab Energy Management. Fume Hoods/ Safety Cabinets One fume hood uses enough energy annually to power 3.5 households. Keeping a sash completely closed.
 Site  Requirements  Local Resources  Initial layout ideas  Brief material selection  Supply options.
GLUCOSE TESTING USING THE TRUEtrack GLUCOMETER
Safe, Successful and Sustainable Laboratories Peter James and Lisa Hopkinson S-Lab, University of Bradford, UK
Data Centre Design. PROJECT BRIEF Develop a low energy data centre for a major computing company. Building is to be a prime example of sustainable, low.
(Safe, Successful, Sustainable Laboratories)
Rachel Novick, Ph.D. Office of Sustainability University of Notre Dame green.nd.edu Sustainable Scientists: Integrating Lab Users into Sustainable Laboratory.
Commercial Kitchens Dalhousie University Case Study With the financial support:
The Ins and Outs of HAZWOPER or Is it a true HAZWOPER event or something else completely? Presented by Barry Rutledge, Senior EH&S Specialist Protech Environmental.
15 Maintaining a Web Site Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section.
Section 15.1 Identify Webmastering tasks Identify Web server maintenance techniques Describe the importance of backups Section 15.2 Identify guidelines.
Energy Matters 5 June 2008 for SWWMG Tim Linford TJL Associates
Safe Operation of Storage Tanks: Decommissioning and Repair
Liam Newcombe BCS Data Centre Specialist Group Secretary Energy Efficient Data Centres.
Medical Informatics Patient Administration System.
To summarise the aim of the challenge is to: Raise awareness of the energy costs of running freezers. Warm up freezers from -80 o C to -70 o C. Saving.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Cold Storage Challenges and Good Practice at UoEdinburgh Martin Farley – Laboratories Facilitator, SRS department
 Indentify problems that can occur if hardware is not properly maintained.  Identify routine maintenance that can be performed by users.  Identify.
Review of the New England “Mini-Pilot” DHP Evaluation Why we ignore this study.
Effective Use of Laboratory Equipment and Facilities in Pure & Applied Chemistry.
Quality control and audit visit: process & actions.
The User Friendly Community 2007 A community that is dedicated to making all of our rooms and procedures User Friendly As of
Authors: William Tschudi, Lawrence Berkeley National Lab Stephen Fok, Pacific Gas and Electric Company Stephen Fok, Pacific Gas and Electric Company Presented.
P1 Document Control and Various Documents. P2 Learning Objectives What are documents and records? Documents Why are they important? What documents should.
5.1 Effects of IT on employment
Page 1 IceCold Pilot Study. Page 2 Pilot Candidate: Siemens 501 Fountain Parkway 32 RTUs provide cooling to 170,000 SF of Office and Production Spaces.
Focus on the benefits Keep everyone informed and involved Get energy efficient around the office.
KITCHEN APPLIANCES. LARGE AND SMALL Kitchen appliances are designed to make food preparation easier, faster and sometimes safer. Large appliances –Stoves.
Scientific data storage: How are computers involved in the following?
May 2016 Safety Focus Extra. What is 5S and why do we want to do it? Simple but highly effective set of techniques that help organize and remove excess.
West Cambridge Data Centre Ian Tasker Information Services.
Planned Preventive Maintenance for Fridges To improve your fridge’s function do the following tasks all the time: 2) Defrost your fridge once a month OR.
Maintenance.
Start Tasks Hand in resubmissions for unit 1 Update homework tracker
Data Center Stabilization
LIQUID NITROGEN PROCEDURE
Undergraduate Laboratories: Course Check-In List
Building Monitor Training
Site Planning & Power Supply
Section 15.1 Section 15.2 Identify Webmastering tasks
GES SYSTEM THE IMPORTANCE OF GES SYSTEM IN BUILDING
Vaccine storage Vaccine Storage
Building Monitor Training
Case Study: Marks & Spencer Oxford Street
TES Data Platform Providing business users with the tools to connect share and analyse data 2018.
TRANSFUSIONS IN THE COMMUNITY
Green Lab Certification
ICAS Alarm Upgrade ICAS Alarm Upgrade Project
Laboratory Efficiency Assessment Framework (LEAF)
Simon Dukes Pharmaceutical Services Negotiating Committee
Presentation transcript:

COLD STORAGE AND LABORATORIES ROSLIN OLD TO NEW AND MAKING THE BEST OF WHAT YOU HAVE.

Old Roslin

OLD Roslin Now

Roslin New

Shared lab space and open plan office

Roslin Office and Lab cooling

Natural Ventilation

Dolly

Old Roslin Site

Freezer Management 2001 Freezers in various locations. Not all alarmed. Call-out procedures unclear. No regular maintenance. No emergency decant space. No clear sample management.

Change Freezer locations centralised + alarmed Dedicated freezer team appointed Standard Operating Procedures introduced Daily temperature monitoring Regular defrosts Quality Assurance Management input-sample tracking--easy to use sample tracking encourages uptake of use!

IMPACT Efficient use of lab space- equipment and cooling. Efficient use of internal Freezer Space. Easier to identify available freezer space. Reduction in number of freezers. Increased sample security. Risk Register level reduced.

Roslin Freezer Room

Freezer Park Roof Location

Roslin 3 rd Floor Freezer Park

Roslin Freezer Measurements Freezers were all U-725 New Brunswicks, all relatively full. Meters were checked against each other. All over 24 hr period, with 24 hrs allowed between each measurement.

FreezerTemp Setting (C)KWhr (-20) sm. Beko (A+) (-20) lg. Ocean Frost Free (-20) Chest freezer (+4) Cryotechnics Lab fridge42.01 (+4) Proline (food fridge)40.74 (-80) NB U725 - efficient*(empty) (-80) Panasonic Sanyo VIP (-70) Assab (15-20 years old) TemperatureReal CostsSavings from -80 (£ ) Roslin Freezer Measurements Costed Savings for Temp increases from -80 per Annum* Further Various Freezer Readings *At.09 pounds per KWhr

Steps to improvement Replace inefficient fridges and freezers. Encourage sharing-making user cost aware! Utilise climate to help cool Freezer rooms. Manage sample tracking –user friendly. Maintain Freezers and Alarms. 2 visits/year. Consider -20 walk-in rooms over multiple -20 chest freezers. (20% saving ) Encourage temperatures at -70 over -80

To Do List Metering of cooling within freezer rooms- raise cost awareness. True archive freezers removed to a secure and efficiently designed building(Freezer Farm) -this would release prime space within buildings to allow either expansion or consolidation! Questions?