17 th Annual RETS-REMP Workshop Philadelphia, PA June 25-27, 2007 Cook Nuclear Plant Experience with Storm Water Tritium Discharges Jason T. Harris Purdue.

Slides:



Advertisements
Similar presentations
4. What is the boundary between two drainage basins called?
Advertisements

Overview of the EPRI Groundwater Assessment Program
2006 Nuclear Utility REMP Conference Isotopes Of Concern General Engineering Laboratories, LLC Environmental Levels And Methods For Monitoring H-3. C-
Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Tritium Handling and Management in MFE - What We Learned from TFTR - C. A. Gentile June 24, 2014 PPPL / ITER Workshop 1.
Effluent Releases ANI - Update William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Mashantucket, CT June 2006 “ RETS – REMP WORKSHOP.
Application Update of ANI Guideline “ Potential for Unmonitored & Unplanned Off- Site Releases of Radioactive Material” William Wendland, P.E. American.
Application of ANI Guideline William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA Philadelphia, PA June 2007 “ RETS – REMP.
Sejkora: What is RETS-REMP?
RPS Actions Instruct staff to put hands on all routine air monitors and report equipment status Contact sampling partners to give notice of possible.
RETS-REMP WORKSHOP June 25, 2012 Greg Jones R. E. Ginna Nuclear Power Plant Constellation Energy Nuclear Group, LLC 1.
14th Annual RETS/REMP Workshop June 28-30, 2004 U.S. Nuclear Power Sister Plant Radiological Effluent Release Comparisons J.T. Harris 1,3, D.W. Miller.
Modeling Atmospheric Releases of Molecular Tritium 2005 RETS/REMP Workshop Jim Key Key Solutions, Inc.
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
Massachusetts Water Resources Authority Frederick A. Laskey Executive Director 20 Years of Change: Boston Harbor Pollution Abatement Project Timelines.
Spokane River Forum 26 May 2013 Spokane’s CSO Reduction Status.
16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 North American Technical Center Public Radiation Safety Research Program REMP Study Jason.
Implications of Tritium Dose Conversion Factors in Deriving Regulatory Limits for Drinking Water and Effluent Compliance Ken Sejkora Entergy Nuclear Northeast.
Brunswick Nuclear Plant Storm Drain Stabilization Pond Tritium Issues.
1 Fe-55 and Te-125m in Liquid Waste RETS REMP Workshop June 26-28, 2006 Richard Conatser Constellation Energy Group Calvert Cliffs Nuclear Power Plant.
DPR Monitoring Efforts Within Salt Creek Watershed, Orange County Robert Budd, PhD January 20 th, 2015.
EEP Data Flow Kevin H. Miller CVS-EEP Vegetation Monitoring Workshop Wake Technical Community College Northern Campus June 9, 2009.
Spokane River Forum 23 May 2011
South Carolina Stormwater Forum Current Practices in South Carolina.
Building a Comprehensive IDDE Program Doyle Allen, Stormwater Manager SCASM Meeting May 8, 2007 Fort Jackson, SC Illicit Discharge Detection & Elimination.
Annual maps of sites where % outliers ≥ 10% of the valid samples, e.g. sites which had ≥ 10% of their sample pairs with Z Scores outside of the range [-3,3].
A STUDY ON THE TRITIUM DISTRIBUTION CHARACTERISTICS IN THE ENVIRONMENT Goung-Jin Lee, Hee-Geun Kim 2006 RETS.
Tritium: Fleet-Wide Assessment Program Zigmund A. Karpa Director Environmental and Regulatory Affairs.
American Nuclear Insurers Glastonbury, Connecticut USA
Impact of Utility GPI Activities on a State REMP Program RETS-REMP Workshop 6/23/2008 Dale Dusenbury, MSPH,CHP Health Physicist Supervisor NC Radiation.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
Jason T. Harris, Ph.D. Idaho State University/NATC Radiological Impact of Commercial Nuclear Power Plant Releases: a 12-year Study 1 18 th Annual RETS-REMP.
30-Day Running Geometric Means for the Upper Newport Bay Stations for The following graphs provide the 30-day running geometric means for the.
William Wendland, P.E. American Nuclear Insurers Glastonbury, Connecticut USA South Bend, IN June 2009 “ RETS – REMP Workshop 2009” AMERICAN NUCLEAR INSURERS.
1 The Past, Present, and Future of the NATC’s Public Radiation Safety Research Program Jason T. Harris David W. Miller, Ph.D. University of Illinois at.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
NUMUG Business Meeting David I. Katz Climatronics Corporation Presented at the 10 th NUMUG Meeting Wilmington, NC / June 2005.
MDOT Storm Water Management Plan Module 4: Illicit Discharge Elimination Program Together… Better Roads, Cleaner Streams.
Impact of Drought on Jackson Blue Spring Kris Barrios Northwest Florida Water Management District.
Human Impact on Oceans. About 37% results from a mix of materials and wastes which make up urban run-off and the discharge from land - based industrail.
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
30-Day Running Geometric Means for the Dana Point Harbor Stations for The following graphs provide the 30-day running geometric means for the.
Aim: How can indicators be used to tell if a substance is present?
United nations /MAP/ TS 18-19/12/2003 Distribution of N-NO 3 [river Loire (1971 to 1997)]
Illicit Connections & Illicit Discharges (IC/ID) Elimination Program Flood Maintenance Division West Area Annual Refresher Training August 9, 10 & 11,
Onslow County Solid Waste Cooking Oil Recycling Program.
Our Water Systems
Storm Water Pollution Prevention FN000178/CR. Storm Water Pollution Prevention Plan  Why do we have a plan?  Condition of our NPDES permit  Training.
SMC South ALG Matrix Wire, Inc. Lee County April 26, 2012 DP.
Polluted Water In California Toxicity levels in California waters increased by 170% from 2006 to 2010 Water pollution in California aren’t getting any.
Reed Contracting Concrete Plant (ALG active) November 8, 2012 Madison County Karl M. Ryan, inspector 1.
Meredyth Mine AL Winston County Inspected on By Ryan Baty.
Leah Guzman and David Edmunds Environmental Program Specialists Department of Environmental Conservation.
Eden North Carolina Coal Ash Spill Initial Emergency Response North Carolina Emergecy Management Conference Sunset Beach, NC, 2014.
Municipal Separate Storm Sewer System (MS4) Permit
Continuous Surrogate Monitoring for Pollutant Load Estimation in Urban Water Systems Anthony A. Melcher, USU Civil and Environmental.
STORMWATER MANAGEMENT
The Watersheds of Harris and Montgomery Counties
Keep our Campus Beautiful
Wellington New Zealand By Nikhil Patel
Point Source vs Nonpoint Source Pollution
C.2.10 Sample Questions.
C.2.8 Sample Questions.
C.2.8 Sample Questions.
Recent changes to the ani engineering rating factor
General Dentists - nusmiledentaloffice.com
Sample Proofs 1. S>-M A 2. -S>-M A -M GOAL.
Contact Us 1-(267) Verree Rd, Philadelphia, PA
Presentation transcript:

17 th Annual RETS-REMP Workshop Philadelphia, PA June 25-27, 2007 Cook Nuclear Plant Experience with Storm Water Tritium Discharges Jason T. Harris Purdue University/NATC David W. Miller UIUC/NATC/Cook NP Terry Brown RPM, Cook NP

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Discovery May 30, 2007 Cook Nuclear Plant staff detected tritium on- site  Led to increased sampling of various locations on site including wells and outfalls  Ground water wells did not indicate the presence of tritium  Initial North Storm Drain Outfall to beach sample found to contain tritium at 5540 pCi/L  Subsequent samples ranged from pCi/L  South outfall samples <LLD  North outfall catch basins sampled ( pCI/L)  Condensate from air conditioning units ( pCi/L)

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Initial Steps Early June – notifications were made to several stakeholders (NRC, NEI, INPO, government) North outfall re-directed back into plant to the turbine room sump (monitored release path to the absorption pond) Sampling protocol set up for north and south outfalls, and turbine room sump and absorption pond Supporting/refuting analysis developed to validate hypothesis that the source of elevated tritium levels is from downwash and air conditioning condensate Evaluation of initial leak continues

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Initial Storm Drain Sample Locations North Outfall N

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Initial AC Condensate Sample Locations RPAC OBA Security N

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Tritium Samples for Split Analysis Tritium Samples For Split Analysis Sample Tritium Gamma AnalysisArevaKinectrics LocationDate / Timepicocuries/literuci/ccvolume North Outfall 5/31/07 16:418060ND100 mls RPAC AC Unit Condensate6/1/07 13: ND30 mls OBA A/C Condensate (Short Hose)6/1/07 14: ND100 mls 2 ESW Pipe Tunnel6/2/07 8:103460ND100 mls Security Building AC Condensate6/2/07 15: ND100 mls

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Initial Rain Gauge Locations TSOC Visitor Guard House Brass Shack N

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Early Results Constant sampling showed that tritium found only in samples north of Unit 1  “plume” of tritium migrated from plant and up service road AC condensate and North Outfall continued to show presence of tritium

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 North Outfall Tritium

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Pathway Hypotheses By early June, two pathways were verified and identified by sampling to be the probable sources of tritium  Condensate from the air conditioning units in the Radiation Protection Building located immediately adjacent to containment release points for Units 1 & 2, North Security Guardhouse and Administrative Office Buildings (including annexes).  Downwash from the station vents located at the top of each containment building during rainfall episodes.

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Additional Rain Gauges An additional 28 rain gauges (32 total) were placed throughout the site Collections revealed similar patterns (tritium in prevailing wind samples N-NW)  Positive samples Guard house lawn Unit 1 and 2 roof vents RPAC

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Current Rain Gauge Locations N

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Current Rain Fall Locations Control

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Dose Consequences Initial dose analysis performed on three highest tritium concentration samples Assumed 24 hour 1000 gal w/ 230,000 gpm dilution REMP pathways also assessed at highest annual Χ/Q (insignificant)  Max = vegetation, 3.30 E CFR 50 results  Max = particulates, 6.76 E-08

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Maximum Individual Doses Sample LocationEffluentApplicable Estimated DosePeakLocation % ApplicableLimit OrganmRem Age Group LimitmRem Security Building AC Condensate pCi/LLiquidT. Body5.34 E-09ChildReceptor3.56 E E+00 LiquidLiver5.34 E-09ChildReceptor1.07 E E+00 RPAC AC Unit Condensate pCi/LLiquidT. Body4.67 E-09ChildReceptor3.11 E E+00 LiquidLiver4.67 E-09ChildReceptor9.34 E E+00 OBA A/C Condensate (Short Hose) pCi/LLiquidT. Body3.67 E-09ChildReceptor2.45 E E+00 LiquidLiver3.67 E-09ChildReceptor7.34 E E+00 Dose Consequences

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Current Progress Continuing to monitor, sample, and test rain gauges (and ac condensate) Study impact of humidity and rainfall amount Investigating building freezer ice (David Miller) Categorize site throughout the year (wind changes, humidity, etc.)

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Conclusions Air conditioning condensate and rainfall contributing to outfall tritium Tritium levels in rainfall downwash are influenced primarily by 2 factors  Prevailing wind direction  Amount of rainfall For Cook (sandy soil), water percolating to Lake Michigan through monitored pathways To best categorize site, need several rainfalls throughout the year (different prevailing winds)

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Additional Areas of Investigation Evaluate sublimation as it relates to hydrogen/tritium water evaporation rates Maintain spent fuel water at higher temperature in winter (when drier) for better evaporation (and use large surface area, like roof, for evaporation Longer rain event more important than short thunderstorms for seeing tritium For irrigation purposes – trickle underground to avoid standing water that may show increased tritium levels

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Additional Areas of Investigation Don’t release in rain event Sites with single gaseous release points 2.5 x highest structure/elevated release (e.g., LaSalle and Browns Ferry) – aren’t seeing this phenomenon Purchase more land

16 th Annual RETS-REMP Workshop Mashantucket, CT June 26-28, 2006 Acknowledgements Cook Tritium Investigation Team  John Harner, Lead  Dave Faulkner, Chemistry  Bill Hannah, Maintenance  Walt McCrory, Engineering Doug Foster, Environmental Joe Beer, RP

17 th Annual RETS-REMP Workshop Philadelphia, PA June 25-27, 2007 Questions? Thank You!