2-2-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE AIRCREW CBR ENSEMBLE CMU-29(V)2/P Overvest Chemical Biological Radiological.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
SKA-Pak Plus Mobile Air Cart Con-Space Link
1-2-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Donning Procedures Chemical Biological Radiological.
CBR Suit Training Disaster Preparedness and Management Unit.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
 Without reference, identify principles relating to Fixed Radiological X-RAY PM with at least 70 percent accuracy.
Setting up PLCE webbing
M40 FIELD PROTECTIVE MASK
2-3-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Fitting Procedures Chemical Biological Radiological.
Properly Securing the SCBA in Stowage Bracket Clips 1. Insert SCBA into walk-away bracket clips, ensuring the stowage strap is not trapped within the bracket.
2 Fire Fighter Qualifications and Safety Skill Drills.
TESTING Dräger PSS 7000 Breathing Apparatus GENERAL TEST
Blackwood Fire Company IN-HOUSE SCBA REQUALIFICATION.
MAINTAIN YOUR M-40 SERIES PROTECTIVE MASK WITH HOOD
Inspecting your harness. This may save your life..
Used with FILTERS Copyright © 2013 by The S.E.A. Group.
Used with FILTERS Copyright © 2013 by The S.E.A. Group.
CERVICAL COLLARS. 2 The Collar 3 Neutral Position  The patient must be supine, sitting or standing, with the head in a neutral position eyes are forward.
Radiation Protection Technology Respiratory Protection Air Sampling Radiological Safety and Response RPT-243-PE-6.
ModICE Modular Integrated Connector Enclosure
Installation. Indoor Unit Installation Typical Installation.
Ford F Series Air Box Modification. Ford F series model year 2011 trucks have plastic air box assemblies. It has been discovered that a plastic tab on.
Used with FILTERS Copyright © 2013 by The S.E.A. Group.
Digital StarLab Set-Up, Operation, Maintenance, and Teacher Manual for the Digital StarLab are in the links below or on the training tab in the BlackBoard.
Crane Rental Association of Canada Quebec City, Quebec Presented by: Curt Jabben Sales Manager – Crane Products June 4, 2011.
1-3-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Emergency Procedures Chemical Biological Radiological.
AIRCREW CBR ENSEMBLE A/P22P-14(V) Respirators
Bullard PA20 Powered Air Purifying Respirator (PAPR) Training Material
M40 Series Protective Mask Outlet Valve Outlet Valve Seat
Inspection and Maintenance of Isotope Radiography Systems
Powered Air-Purifying Respirator (PAPR) Copyright © 2015 by The S.E.A. Group.
Sling Safety.
2-5-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Inspections Chemical Biological Radiological.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
Installation. Indoor Unit Installation Typical Installation.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
3-1-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Portable Test Kit Chemical Biological Radiological.
1 Fire Fighter Qualifications and Safety Skill Drills 2.
1 Skill Drill 2-7 Donning a Face Piece Step 1: Fully extend the straps on the face piece. Step 2: Place your chin in the chin pocket. 2 Step 3: Fit the.
20051 Surface Rescue Swimmer School Aviation Life Support Systems LT 4.5.
BIX In-Building Cross Connect system BIX Installation Guide ELCM 254 Updated December 2013 gmail.com 1 Most of the images and some text for.
2-4-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE Donning Procedures Chemical Biological Radiological.
20051 Surface Rescue Swimmer Course ALTERNATE RESCUE DEVICES LT. 4.4.
Donning and Doffing SCBA Firefighter I. Copyright © Texas Education Agency All rights reserved. Images and other multimedia content used with permission.
DBSL COMBAT EQUIPMENT.
Protect Yourself From Chemical/Biological Contamination Using Your Assigned Protective Mask.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
CBR Radio Training Disaster Preparedness and Management Unit (Version 2.2; 13 April 2015)
CPS MILITARY SOLO SYSTEM DONNING AND ADJUSTING. TLO Given a CPS Military Solo System and combat equipment prepare the CPS Military Solo System for parachuting.
Chapter 27 Restraint System Repairs. Objectives Explain the difference between an active and a passive restraint system Learn how to service seat belts.
UH-60 Load Out on C-5 Aircraft
Chapter 23 Interior Repairs. Objectives Identify the major parts of a vehicle’s interior Remove and replace seats, seat covers, and carpeting Service.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Shaft Replacement Standard Operating Procedure
Setting up PLCE webbing
Copyright © 2016 by The S.E.A. Group
Installation of the Hook & Go II onto the Colorado Belts
Topic 1.7 Aircraft Salvage Procedures
Review of GRSP e Proposal for amendments to R44 11/05/17
Automatic Transmissions and Transaxles
M40 GAS MASK.
Servicing the Steering System
BIX In-Building Cross Connect system
Kimberly Gonzalez United Engineering & Technology Magnet
Equipment Familiarization
CBRN Overview SGT Hubbard, Bobbie Lee | 2015.
Reader Swap out Guide.
The Fall Protection Harness: Inspection, Care and Maintenance
Repairing the Electrical Components
Presentation transcript:

2-2-1 N uclear B iological C hemical AIRCREW CBR ENSEMBLE AIRCREW CBR ENSEMBLE CMU-29(V)2/P Overvest Chemical Biological Radiological

2-2-2 TERMINAL OBJECTIVE To increase familiarity with the components, installation and fitting of the CMU-29(V)2/P overvest.

2-2-3 ENABLING OBJECTIVES Describe the CMU-29(V)2 overvest Describe the regulator installation procedures Describe the aircrew fitting procedures Describe the procedures for CMU-33/P or SV-2B integration with the CBR overvest Discuss maintenance and inspection procedures

2-2-4 OVERVIEW n Introduction to CMU-29 n Installation n Fitting n Integration n Inspections

2-2-5 INTRODUCTION n All information for the overvest can be found in NAVAIR n For fixed wing aircrews when the A/P22P- 14(V)2 thru(V)4 CBR Respirator Assembly variants are worn. n Worn over either the CMU-23A/P (SV-2B) or CMU-33/P (AIRSAVE).* n Stores the Respirator Assembly pusher fan and filter canister and various survival items. *Helo AIRSAVE and SV2 have connectors which allow system to be directly attached, thus no need for the overvest

2-2-6 INTRODUCTION

2-2-7 INSTALLATION n Place on a clean/dry surface, pockets facing up and slide fastener on the left. n Stow pusher fan and 90 0 rubber molding into retention pocket n Weave the snap fastener tabs on the H- manifold n Close the pocket slide fastener n Secure in place with snap fastener socket set. n Route pusher fan power cable

2-2-8 INSTALLATION CRU-79/P

2-2-9 INSTALLATION CRU-79/P n Enlarge the waist area of the overvest n Pass seat kit hose through the rectangular opening. n Secure the hook and pile tape and close fastener. n Secure the regulator pocket n Route the regulator hose.

INSTALLATION CRU-82/P,CRU-88/P,CRU-103/P

INSTALLATION CRU-82/P,CRU-88/P,CRU-103/P n Lay out the pocket with opening on the left. n Insert regulator, outlet end first and ID plate facing up. n Attach pocket to vest

INSTALLATION OF FLASHLIGHT n Insert cable tie through retention strap n Route tie around neck and underneath clip n Insert flashlight through vest strap

GENERAL FITTING n One size fits all n Adjustments made both standing and sitting n Install Respirator Assemblies into the Overvest n Don last. n Ensure overvest straps do not interfere with aircrew life preserver.

CMU-33/P INTEGRATION 1. Remove radio pocket from CMU-33/P 2. Don CMU-33/P 3. Don respirator assembly. Ensure Pusher Fan “ON” 4. Don CMU-29(V)2/P overvest and route LPU- 33/P tiedowns. 5. Center H-manifold between LPU-33 lobes Refer to NAVAIR paragraph 3-42

CMU-33/P INTEGRATION 6. Install windblast straps 7. Route excess strap through tri-lock and secure tacking. 8. Reinstall radio pocket on CMU-33/P. 9. Secure LPU-33/P retention strap hooks and CMU-33/P waist belt loops to torso harness D-ring.

SV-2B INTEGRATION 1. Don SV-2B and LPU collar lobe 2. Don respirator assembly, Pusher Fan “ON” 3. Don CMU-29(V)2/P. 4. Center H-manifold high enough to permit unrestrained head rotation. 5. Connect two CMU-29(V)2/P windblast straps.

SV-2B INTEGRATION 6. Route excess strap through tri-lock and secure by tacking. 7. Connect LPU collar lobe retention strap hooks 8. Adjust straps and weave free ends. 9. Make reference marks with tailor’s chalk 10. Tack all straps and fold free ends.

MAINTENANCE n Repairs or other maintenance actions required shall be performed by O-level or above. All maintenance actions and inspection shall be recorded in accordance with OPNAVINST series

INSPECTIONS Place-In-Service and Special Inspections are performed at O-level or above in accordance with paragraph of NAVAIR Place in service and every 90 days thereafter unless stored for extended periods of time.

REPAIRS and REPLACEMENTS

Lesson Learned n Ensure when donning that the Overvest does not interfere with the aircrew’s life preserver

Questions? n What side of the vest is the Flashlight located? n When must the vest be inspected? n How is the CBR gear integrated to the CMU-33?