Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien Morel, Andrea Richichi Schloss Ringberg, September 03, 2003.

Slides:



Advertisements
Similar presentations
The Very Large Telescope Interferometer EuroSummer School Astrometry and Imaging with the Very Large Telescope Interferometer Keszthely, Hungary June.
Advertisements

Direct determination of asteroids sizes and shapes by Mid-IR interferometry Sebastiano Ligori INAF – Osservatorio Astronomico di Torino, Italy.
VLTI EuroSummer Schoolday June 2006Initials. Name -- Lecture title Observability and UV coverage of sources Euro Summer School Observations and data reduction.
July 2006Instrument Scientist Retreat, Santiago Quality Control: closing the loop Reinhard Hanuschik, DFO/QC 1. Principles 2. Processes 3. Critical components.
Online Postgraduate Admissions Update for Postgraduate Forum – 22 January 2010 Kate Ward.
AMBER and MIDI from user’s point of view EuroSummer School Observation and data reduction with the Very Large Telescope Interferometer Goutelas, France.
Optics in Astronomy - Interferometry - Oskar von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Error budget for the PRIMA conceptual design review Bob Tubbs, Richard Mathar, Murakawa Koji, Rudolf Le Poole, Jeff Meisner and Eric Bakker Leiden University.
DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Mid-infrared interferometry of the Mira star RR Sco with the VLTI/MIDI instrument collaborators: Keiichi Ohnaka, MPIfR Keiichi Ohnaka, MPIfR Karl-Heinz.
Paranal 60th STC meeting. 2 What does the VLTI infrastructure do? Put the light in the one place at the one time. –Inject the image plane in the.
The AMBER & MIDI instruments Summer School Astrometry and Imaging with the Very Large Telescope Interferometer Keszthely, Hungary 2-13 June, 2008 Markus.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Template For Building Project Schedule Jazz Presentation.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
School Year Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
2007 Monthly Calendar You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation.
You can print this template to use it as a wall calendar, or you can copy the page for any month to add it to your own presentation. If you’d like to change.
Commissioning the NOAO Data Management System Howard H. Lanning, Rob Seaman, Chris Smith (National Optical Astronomy Observatory, Data Products Program)
Cophasing activities at Onera
Physical Modelling of Instruments Activities in ESO’s Instrumentation Division Florian Kerber, Paul Bristow.
Hunt for Molecules, Paris, 2005-Sep-20 Software Development for ALMA Robert LUCAS IRAM Grenoble France.
50mm Telescope ACS Course Garching, 15 th to 19 th January 2007 January 2007Garching.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
Tutorial T-10 Amber Data Reduction (practical point of view) EuroSummer School Observation and data reduction with the Very Large Telescope Interferometer.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
SCIOPS 2013 Reinhard Hanuschik, ESO Garching The VLT Quality Control Loop.
The AMBER & MIDI instruments of the VLTI (Observationnal Astronomy II) Lecture by Stéphane Sacuto.
AMBER & MIDI instruments - the user ’ s point of view Euro Summer School Circumstellar disks and planets at very high angular resolution Porto, Portugal.
SDD/DFS A. Modigliani VLT 2 nd Generation Instrumentation Pipelines, 19 Apr ACCEPTANCE TESTS Andrea Modigliani.
XMM 1Norbert Schartel Report From The Project Scientist Presentation for the XMM-Newton Users Group Meeting VI 19 th / 20 th May 2005 Norbert Schartel.
MIDI design, performance, operations, and science Markus Schöller (INS)
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Long-Term Congestion Rights (LTCR) Weekly Testing Call January 5, Project Pinnacle.
Practical session on calibrators Euro Summer School Active Galactic Nuclei at the highest angular resolution: theory and observations Torun, Poland 27.
Data Processing & Quality Control Group [ Faculty Meeting Sept Data Processing & Quality Control Quality Control Group head: Reinhard.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
AMBER & MIDI instruments - the user ’ s point of view Euro Summer School Active Galactic Nuclei at the highest angular resolution: theory and observations.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
The Very Large Telescope Interferometer Neon School, Garching 29 August, 2008 Andrea Richichi European Southern Observatory.
INS SW Workshop, Garching 8 October, 2008 Andrea Richichi European Southern Observatory.
ESO-PSW – N. Kornweibel & P. Baksai ESO Instrumentation Software Workshop N. Kornweibel & P. Baksai Operations at Paranal.
Commissioning Planning
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
SPHERE – SAXO Performance status
Single Object & Time Series Spectroscopy with JWST NIRCam
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Chuck F Claver LSST System Scientist & Commissioning Lead
ESO Phase 1 & 2 Procedures Gaitee Hussain
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Irregularities in DoRIS
McDonald’s Kalender 2009.
Observational Astronomy
McDonald’s calendar 2007.
Irregularities in DoRIS
McDonald’s calendar 2007.
The User Support Department Fernando Comerón DMD/USD
2015 January February March April May June July August September
Presentation transcript:

Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien Morel, Andrea Richichi Schloss Ringberg, September 03, 2003

VLTI All UT Coude trainsAll UT Coude trains UT1 tip/tilt (STRAP)UT1 tip/tilt (STRAP) UT2 and UT3 full AO (MACAO)UT2 and UT3 full AO (MACAO) Transfer OpticsTransfer Optics 3 Delay Lines3 Delay Lines VINCIVINCI MIDIMIDI Four staff astronomers, three fellows, several TIOs in ChileFour staff astronomers, three fellows, several TIOs in Chile SID commissioning finishedSID commissioning finished

First Fringes  General User Instruments

Phases Assembly, Integration, Verification (AIV), which ends with First FringesAssembly, Integration, Verification (AIV), which ends with First Fringes Commissioning under the responsibility of the Instrument TeamCommissioning under the responsibility of the Instrument Team “Paranalization” under the responsibility of ESO“Paranalization” under the responsibility of ESO Science Demonstration TimeScience Demonstration Time Open Time with Guaranteed TimeOpen Time with Guaranteed Time

Goals of Paranalization Test the robustness of the instrumentTest the robustness of the instrument Ensure operatibility of the instrument in the science operations groupEnsure operatibility of the instrument in the science operations group Verify instrumental performance and magnitude limitsVerify instrumental performance and magnitude limits

Paranal organigramm

MIDI - runs on the Unit Telescopes first fringes obtained on December 15, 2002 first fringes obtained on December 15, 2002 comm 1 in February 2003 comm 1 in February 2003 comm 2 in May 2003 comm 2 in May 2003 paranalization, GTO/SDT in June 2003 paranalization, GTO/SDT in June 2003 paranalization in August and September 2003 paranalization in August and September 2003 SDT in November 2003 SDT in November 2003 comm 3 in December 2003 comm 3 in December 2003 paranalization and GTO/SDT in January/February 2004 paranalization and GTO/SDT in January/February 2004 science operations will start in P73 (Apr 2004) science operations will start in P73 (Apr 2004)

Identified problems OPD jumpsOPD jumps Tunnel/light duct seeingTunnel/light duct seeing M2 return accuracy when choppingM2 return accuracy when chopping MIDI tracking on ghost (2% vs 40% visibility, ±3.5mm from nominal OPD) on very bright objectsMIDI tracking on ghost (2% vs 40% visibility, ±3.5mm from nominal OPD) on very bright objects

VLTI Data Flow System DFS Hardware VINCI Data Releases VLTI FITS DICD VLT-SPE-ESO NGAST Update Web Archive Interface On-Line VINCI Pipeline MIDI, AMBER Pipeline VINCI QC Logs Automatic Reports MIDI AMBER: Calibration Database QC1 Parameters Visibility Calculator Web Calib. Selection ESOFORM/PHRS VINCI ETC MIDI, AMBER ETCs Scheduling VINCI Templates OBs created with P2PP MIDI, AMBER Templates Extern. Verif. Modules

Call for Proposals - P73 Call for Proposals released on Sep 01, 2003 Call for Proposals released on Sep 01, 2003 Proposal deadline on Oct 01, 2003 Proposal deadline on Oct 01, 2003 Observing April - September 2004 Observing April - September 2004

Call for Proposals - Details UT2/3 and UT1/3 (April-June only)UT2/3 and UT1/3 (April-June only) Use of STRAP (tip/tilt)Use of STRAP (tip/tilt) MIDI in low dispersion mode only (prism)MIDI in low dispersion mode only (prism) Internal fringe tracking onlyInternal fringe tracking only Limiting flux of 5JyLimiting flux of 5Jy Limiting magnitude of V=16 (STRAP guiding)Limiting magnitude of V=16 (STRAP guiding)  V~10% (no overlap compensation)  V~10% (no overlap compensation)

Proposal Preparation I Check objects against MIDI GTO listCheck objects against MIDI GTO list

VLTI open points Final installation of Variable Curvature Mirrors (VCM) in the Delay LinesFinal installation of Variable Curvature Mirrors (VCM) in the Delay Lines Delay Line Metrology upgradeDelay Line Metrology upgrade Close the FINITO loopClose the FINITO loop MACAO installation on UT1/4 and fine tuningMACAO installation on UT1/4 and fine tuning Auxiliary TelescopesAuxiliary Telescopes

Instrument Operations Page

MIDI open points GrismGrism Dispersed fringe trackingDispersed fringe tracking Use of all filtersUse of all filters Integrate-then-read (ITR) modeIntegrate-then-read (ITR) mode External fringe trackingExternal fringe tracking Spatial filtersSpatial filters Acquisition of complex objectsAcquisition of complex objects