1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date: 01-30-06.

Slides:



Advertisements
Similar presentations
ZTF Mechanical Walkthrough Matthew Hoff ZTF Technical Meeting 1.
Advertisements

Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Optical Manufacturing Solutions 1 Probe Assembly.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Click on this image to open the full PDF document.
HiCIAO: High Contrast Instrument for next generation Adaptive Optics For Subaru 8.2m telescope Based on a previous Japan/MEXT grant (Tokutei) PI & CoPIs:
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
1 Grating Mount Requirements Weight:< 75 Lbs including grating (43.1 Lbs) Size:Fit within structural envelope. 1.5” for cell behind grating. Alignment:Adjust.
Diesel Engine 4 Stroke Cycle model
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
1 Acquisition Camera: Troubleshooting Help Vern STAHLBERGER Institute for Astronomy August Comments and Purpose: 1)Images not centered in Acquisition.
Tagger and Vacuum Chamber Design. Outline. Design considerations. Stresses and deformations. Mechanical assembly.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ISHELL Design Review Cryostat & Optics Bench Dan Kokubun 9/11/2013.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Automotive Brake Systems, 5/e By James D. Halderman Copyright © 2010, 2008, 2004, 2000, 1995 Pearson Education, Inc., Upper Saddle River, NJ All.
CLIC Permanent Magnet Quadrupole update 1 st December 2010 Mechanical Engineering status N. Collomb1.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
Presentation by ANAS AHMAD ME1 B1 batch Submited to
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
Mission to Mars 4 Wheel Rover Build Instructions April 2008.
Engineer Training XL1500 Mechanics. Engineer Training XL1500 Mechanics Confidential 2 The XL1500 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Planer Machines. Introduction A planer is a type of metalworking machine tool that is some what similar to a shaper, but larger, and with the entire workpiece.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
STEP 1: ASSEMBLE ANGLE PLATES
Planning for Proto-DUNE PD Installation and Cabling at CERN
Assembly Instructions:
ENGINE MODE CODES.
Mechanical Design Review February 25, 2008 Université de Montréal
Design of the Injection Can
electrical connection (cover to cover)
Mechanical Design Review February 25, 2008 Université de Montréal
Review on collimator movement with stepping motors
Endcap shielding senarios:
STEP 1: ASSEMBLE ANGLE PLATES
Test box for ProtoDUNE SP – Integration Test
iSHELL Design Review Cryostat & Optics Bench
Diesel Engine 4 Stroke Cycle model
Review on collimator movement with stepping motors
Mounting a BalanceBox®650 to a brick wall
Cryomodule Assembly Plan
Gattini Detector Installation
Beam Finder Wire (BFW) Status
US-HiLumi – Shipping Post Assembly Status
Presentation transcript:

1 HICIAO-Assembly-Procedure Prepared for HICIAO CDR Author: Vern Stahlberger Institute for Astronomy Date:

2 HiCIAO PDR Design

3

4

5 HICIAO + Fore-Optics Connectors are mounted on a large Sub-Plate to facilitate access to cables through the VJ Main access to inside of Cryostat is via VJ Top Cover: Weight ~10 kg HICIAO Fore-Optics; Mounts to AO-Bench 3 mm clearance between Fore-Optics and VJ

6 3mm Gap between HICIAO VJ and Fore-Optics Assembly AO-Bench Interface Plate (Subaru- design); to match up with holes on dowel pins to this face Fore-Optics is decoupled from Vacuum Jacket!

7

8 VJ Bottom Plate V-Truss Assembly (Qty=4) Starting point for HICIAO Assembly Sequence

9 V-Truss Light Shield Optics Bench Brass Slides Qty=3 1)Brass Slides permit slight adjustments along the optical axis 2)For Assembly, use shims in places indicated Cutouts for Detector Assembly Note: Lip on the Optics Bench for Light-Seal Place Shims here

10 Common Path Filter Wheel Assembly (CPFW) Shim Location Install Light-Tube-1 to CPFW Use.344 inch thick shim to locate CPFW to nominal position; place shim between Filter cover and inside of Optics Bench

11 Pupil Wheel Assembly (PW) Light-Tube-1 Install Light-Tube-2 Slide PW up flush against Light- Tube-1

12 Detector Assembly Add Detector Assembly: It must be installed prior to the Differential Path Filter Wheel (DPFW) Prepare ASIC Flex Ribbon Cable as shown

13 Tongue Light Shield Light-Tube-2 To keep the Optics Path light tight, a Tongue & Groove design interface is used for the 2 marked parts; the Tongue Light Shield must be inserted before the DPFW Bottom out against Light-Tube-2 prior to inserting DFPW

14 Filter Wheel Case DPFW Once DPFW is installed, bottom out Tongue Light Shield on Filter Wheel Case and secure with 2 screws Tongue Light Shield

15 Assembly: Closed Cycle Cooler and 1 st Stage Strap to Vacuum Jacket

16 1 st Stage Strap (compliant) 1 st Stage Strap is composed of.12mm thick Copper Foils and bent into the configuration shown to cancel out vibrations from the 1050 CTI Cold Head 9x ¼-20 Socket Head Caps with Washer

17 Clamp type design to secure the 1 st Stage Strap to the Optics Bench; screws are located on the inside of the Optics Bench (previous slide)

18 VJ Lower Body Connectors and Connector Sub-Plates should be installed AFTER the VJ Lower Body has been bolted in place! Evacuation Valve; Rotates through 360 Deg Hex Socket Head M6 x Required

19 Prepare Radiation Shield as shown in this slide; add to Assembly S.H.C.Vented 6-32 x 5/8 32 Required

20 Radiation Shield without Shield Top Plate Note: This assembly state should be used to wire up the instrument

21 Getter Shield attached to Radiation Shield Tube CTI Cold Finger will slide through the inside of the Getter Shield 1 st Stage Strap

22 Closed Cycle Cooler Assembly 2 nd Stage Getter Assembly Vibration Isolation Mount CCC Mount Flange CTI 1050 Cold Head Cold Wire to Detector Safety Finger Qty3 Prior to Vacuum, the CCC Cold Head is loose. After Vacuum is applied Cold Head is compressing the 2 Isolation Rings (Rubber); 3 Safety Fingers limit the motion of the Cold Head with no Vacuum 1 st Strap Access Cover

23 Access Hole in CCC Mount Flange; used to bolt 1 st Stage Strap to CCC Cold Finger 1050 CTI Cooler assembled to Vacuum Jacket Use these Screws to limit movement of CCC Cold Head when not under Vacuum; 3 Places

24 Changing Filters;Lenses etc

25 Access Covers to Filter/Lenses Hall Sensor Mount This and next slide show state of disassembly necessary to perform maintenance and change filters/sensors/lenses etc.

26 View into open Cryostat: Entrance Window at Right

27 HICIAO Installation on NASMYTH 1.After PDR, Fore-Optics and Vacuum Jacket became 2 independently mounted assemblies 2.Wollaston Prism is close to Vacuum Jacket for optical performance reasons 3.Must protect Wollaston Prism from possible collision with Vacuum Jacket upon installation 4.Next slides discuss new design for mounting procedure of Fore-Optics and Vacuum Jacket on Nasmyth Floor

28 HiCIAO Nasmyth Interface Preliminary Proposal Hideki Takami, Michael Eldred February 8, 2006

29 Instrument Layout IRCS at AO focus Laser Room AO IRCS CISCO

30 Instrument Layout IRCS and AO at docking station Laser Room IRCS AO

31 Instrument Layout HiCIAO at AO focus 4 fixed points for IRCS Laser Room AO IRCS HiCIAO

32 Instrument Layout IRCS at AO focus Laser Room AO IRCS HiCIAO

33 Brief Overview of Installation Procedure 1) Install the Fore-Optics Assembly to the AO-Interface Plate mounted to AO-Bench 2) Transport HICIAO VJ and Interface Frame to the site either by Crane of Rail ( Subaru’s decision) 3) HICIAO VJ must be in the retracted position! 4) Move HICIAO to observing position using crank The following slides will explain in detail the procedure, including initial setup and alignment.

34 VJ Bottom Plate Interlocking Pin: Qty=2 Foot Focus Adjustment Qty=4 Side Adjust Bracket Qty=4 Z-Shim Qty=4 Opt-Axis Adjust Rail Qty=2

35 Comments on previous slide: 1)The Side Adjust Brackets are used for the initial alignment; once set, they will remain locked. 2) The Z-Shim likewise will be adjusted during initial setup; once the optical axes has been aligned, no further adjustments are needed; at this point the Opt-Axis Adjust Rails are secured with bolts through the Z-Shims into the Interface Structure (Bolts not shown) 3) The horizontal slots in the Foot Focus Adjustment are used for fine-tuning the focus direction of the HICIAO instrument. 4) ONCE THE INITIAL SETUP IS COMPLETED, THE HICIAO INSTRUMENT CAN SIMPLY BE RETRACTED BEFORE AND AFTER INSTALLATION BY MEANS OF THE CRANK ON THE RIGHT. 5)The Interlocking Pins require the Vacuum Jacket to be moved horizontally away from the Fore-Optics for the first inch or so. 6)There is also a design feature to allow for precise, repeat positioning of the Vacuum Jacket w.r.t. Interface Structure. This is shown in the next slides.

36 Register Pin Qty=2; Attached to VJ Front End Stop Plate Interlocking Pin Qty=2 Press fitted to VJ Bottom Plate VJ Bottom Plate omitted Hand Crank

37 Register Pin; bolted to VJ Bottom Plate; electrically insulated from VJ Interlocking Pin Repositioning Hardware required on Vacuum Jacket

38 INITIAL SETUP: (with VJ sitting on Target Assemblies) Adjust Front End Stop Plate such that the optical beam coming from the AO is parallel to the optical axis of Cryostat. Front End Stop Plate has rotational adjustment around a vector perpendicular to the Nasmyth Floor. Adjust the Z-Shims to align the optical axis of the AO beam and Cryostat in the direction perpendicular to the Nasmyth Floor. ( Step 1 and Step 2 can be reversed) Move the Cryostat sidewise using the Side Adjust Brackets until the optical axis of the AO and the Cryostat coincide. Secure bolts that fasten the Opt-Axis Adjust Rails to the Instrument Frame. Fine tune any Focus errors by using the horizontal slots in the Foot Focus Adjustment. a) The Register Pins are bolted to the bottom of the VJ Bottom Plate (previous slide) b)Both the Register Pins and Front End Stop Plate have hardened surfaces where they match. The match on the near side is between the Register Pin and a V-Groove in the Front End Stop Plate, at the far side between the Register Pin and a rectangular slot (see next slide). This will insure accurate repeat positioning in x and y. c) Interlocking Pins and corresponding holes in the Fore-Optics Structure have enough clearance between them to never touch. The Interlocking Pins serve as a safety feature in that the cryostat cannot be moved in any other direction than horizontally away from the Fore-Optics Assembly for the first inch.

39 V-Groove Rectangular Slot Arrangement assures repeat positioning of VJ on Interface Structure Interlock Pin Qty=2

40 Target Assembly Qty=4 HICIAO will either use its own Target Assemblies or use IRCS Target Assemblies. (no final decision yet) HICIAO mounted to Instrument Structure

41 CRYO-MECHANISMS HICIAO uses 4 CRYO-Mechanisms Common Path Filter Wheel (CPFW) Pupil Wheel (PW) Differential Path Filter Wheel (DPFW) Detector Focus Mechanism Except for the Wheels, the CPFW, PW and DPFW are identical in design

42 Front Back Common Path Filter Wheel For more Details: See PDR Document Cover shown partially transparent Dowels lineup unit perpendicular to Optics Bench Mounting surface

43 Mechanism Registration: Brass Slides permits parallel, limited translation along the optical axis Filter Wheel Case Holder Slotted Holes; allow limited adjustment along the optical axis

44 Detent Filter Wheel Cover removed Geneva Wheel 12 positions Cam & Driver Assembly Hall Sensor Magnets in Wheel Filter Cell Detent Spring

45 Bearing Mount PHYTRON CRYO-Motor Filter Access Cover; held in place with leaf spring Gear Train Ratio 8:1 Hall Sensor

46 Detector Focus Mechanism Maximum Travel Range: +/- 8 mm Resolution: 5 micron Drive System: Linear Ball Bushings with Ball Screw Drive Encoding: Hall Sensor & Magnet

47 Front View Back View Detector and Detector Focus Stage Resolution: 5 micron Drive: Linear Ball Slides w/Ball Screw Drive

48 ASIC (Schematic only) Ball Screw Drive 1mm Pitch Hall Sensor Substrate THK Linear Ball Slides Cold Feed-Through with G-10 Disk thermal insulation Hall Sensor Substrate Flex Connection

49 G-10 Isolation Tabs Qty=4 Ball-Screw Bracket PHYTRON CRYO-Motor