Manual Flo-tap Installation Instructions

Slides:



Advertisements
Similar presentations
Steering Systems Chapter 44.
Advertisements

Sectional Assembly and Installation
J.P. Langston Brake Retrofit
. BOLT SEQUENCE Loosening – start with #25 Tightening – start with #1 Numbered bolts are 8mm, others are 10mm Guide Pin Bolt 10mm All bolts torqued 90-
Flanged with Opposite Side Support Installation Instructions
Service Technician Training
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
What is a fastener? A device to locate or hold parts
Force & Lift Pump RAJASTHAN EXPERIENCE. Present scenario Unclean toilet – closed toiletsone drinking water point – one hand washing point.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Installation. Indoor Unit Installation Typical Installation.
Click on this image to open the full PDF document.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Volvo 270 Outdrive R&R (for bellows replacement)
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
Pneumo Kit Manufacturing Instructions for assembling the pneumatics workshop kits Questions? Contact Will Durfee, Version:
Honda Recon TRX-250 Installation Manual. STEP 1: Remove rear tires and install axle spacers. Use blue thread locker and tighten lugs to ATV specification:
Engine Removal and Disassembly
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Inside-, Depth-, and Height-Measuring Instruments
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Steering Columns.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Connecting crank and pivot shaft assemblies. Press fits, or interference fits are sometimes used in manufacturing to reduce manufacturing costs or liabilities.
Tagger and Vacuum Chamber Assembly Procedure. Preassembly of second bottom yokes and poleshoes. a) Install special support. b) Place the second bottom.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
General idea of a couple of check rod system and adjustments
Installation. Indoor Unit Installation Typical Installation.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Resource 2 Manufacturing Techniques Machining Operations & Techniques.
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
CHAPTER 33 Drum Brake Systems.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
Blade Tuner assembly Instruction for tuner assembly on a cryomodule May
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
ThermexWELD Exothermic Welding User and Inspector’s Guide
1 Manufacturing Projects Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved.
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Simon Calibration Instructions Main Antenna Jig Peter Karlsson V2.
Welcome! Drafting 2323: Pipe Drafting Andrew Amini Full Time Instructor, HCC.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
MICE Coupling Coil Fabrication Steps to Complete Allan DeMello Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Internal and External Screw Threads
Copyright © 2016 by The S.E.A. Group
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
ENGINE MODE CODES.
826YD 21/2”-10”.
ASSEMBLY/INSTALLATION INSTRUCTIONS ASSEMBLY AND INSTALLATION
For SMCM01, SMBM01 & SMZM01 Models
774X 21/2”, 6”, 8”.
Soxhlet Unit B Maintenance By: Shawna Brookes.
ADVANTAGE BRIDGE/FRAC PLUG S
The ultimate chain lubrication system. LC – Low Cost Lubrication Kits
Assembly instructions for M-K all bolt together hoppercone kit.
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Welcome! Drafting 2323: Pipe Drafting
880V 21/2”-10”.
Valve stem “gag” mechanism
3000SE 21/2”, 6”, 8”.
4000CIV 21/2”-10”.
Presentation transcript:

Manual Flo-tap Installation Instructions Quick Installation Guides: 00825-0400-4809 rev. EA – 485 Flanged Flo-tap 00825-0500-4809 rev. DB – 485 Threaded Flo-tap

Nomenclature Top Plate Instrument Connections Full Insertion Marking Nut Support Plate Head Plate Lock Nut (Retraction Drive Nuts) Insertion Drive Nuts Insertion Rods Full Port Isolation Valve

Weld the Mounting Hardware Onto the Pipe Threaded Flo-tap Flanged Flo-tap

Tack Weld the Mounting Hardware with 4 Equal Length Tacks Tack weld anywhere on the mounting hardware Then again directly across from the first tack weld Then on the other 2 sides 1 3 2

Check to See that the Mounting Hardware is Level and Square If it’s not, use a rubber mallet to lightly adjust the hardware and recheck

Verify that the ODF Dimension Matches What is Listed in the QIG The ODF is the dimension from outside pipe diameter to face of flange 485

Verify that the ODF Dimension Matches What is Listed in the QIG The ODF is the dimension from outside pipe diameter to face of flange For Threaded Flo-tap the dimension from the pipe OD to the top of the threadolet is called LMH: 485 Sensor Size 1: 1.38-in. (35 mm) 485 Sensor Size 2: 1.56-in. (40 mm) 485 Sensor Size 3: 2.06-in. (52 mm)

Complete a Continuous Weld Around the Perimeter of the Unit

Attached the Full Port Valve to the Mounting Hardware Threaded Flo-tap First, thread the guide nipple into the mounting then thread the valve Flanged Flo-tap ODV The valve stem should be in-line with the pipe so it will not interfere with the insertion rods The valve must be a full port valve to allow the Annubar to pass through the valve into the pipe

Verify the ODV Dimension The ODV is the dimension from the outer diameter of the pipe to the top of the valve Flo-tap / Flange Rating 485 Sensor Size 585 Sensor Size ODV Dimension Threaded 1 --- 7.51-in. (190.9 mm) 2 8.17-in. (207.5 mm) ANSI 150 # 11 10.5-in. (266.7 mm) ANSI 300 # 11.75-in. (298.5 mm) ANSI 600# 14.06-in. (357.2 mm) 22 11.25-in. (285.8 mm) 13.00-in. (330.2 mm) 16.38-in. (416.0 mm) 3 44 12.75-in. (323.9 mm) 16.25-in. (412.8 mm) 19.50-in. (495.3 mm)

Drill the Hole by Using a Hot Tap Drilling Machine Guide Ring in Rosemount Supplied Mounting Hardware Tag with correct drill hole size attached to the Annubar

After the Hole is Drilled, Retract the Drill Past the Valve and Close the Valve Vent drilling machine and remove the per manufacturers and site procedures Threaded Flo-tap Flanged Flo-tap Remember that the hot tap drilling machine is under pressure and exposed to the process fluid

Attach the Fully Retracted Flo-tap Assembly to the Valve Threaded Flo-tap

Attach the Fully Retracted Flo-tap Assembly to the Valve Flanged Flo-tap – Use a hoist strap and crane if needed

Quickly Open and Close the Valve to Pressurize the Annubar, Check for Leaks

If Leaks are Present, Tighten the Packing Gland Nuts

Loosen the Insertion Limiting Nuts

Simultaneously Tighten the Insertion Drive Nuts to Insert the Annubar

Lower the Head Plate Lock and Full Insertion Marking Nuts to the Head Plate Head Plate Lock Nut

To Retract the Annubar – Loosen the Retraction Limiting Nuts Retraction Limiting Nuts (Same as Insertion Drive Nuts)

Loosen the Retraction Drive Nuts to Retract the Annubar

Other Installation Considerations During insertion, the rods can twist and the top plate and support can come out of alignment. Makes insertion difficult Hit the top plate with a rubber to put them back in-line