Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

Installation and evaluation of the Globus toolkit WP 1 INFN-GRID Workload management WP 1 DATAGRID WP 2.1 INFN-GRID Massimo Sgaravatto INFN Padova.
INFN & Globus activities Massimo Sgaravatto INFN Padova.
Grid Workload Management (WP 1) Report to INFN-GRID TB Massimo Sgaravatto INFN Padova.
WP 1 (Globus) Status Report Massimo Sgaravatto INFN Padova for the INFN Globus group
Claudio Grandi INFN Bologna DataTAG WP4 meeting, Bologna 14 jan 2003 CMS Grid Integration Claudio Grandi (INFN – Bologna)
LNL M.Biasotto, Roma, 22 novembre Some notes on WP6 INFN Testbed.
Work Package 1 Installation and Evaluation of the Globus Toolkit Massimo Sgaravatto INFN Padova.
Deployment Team. Deployment –Central Management Team Takes care of the deployment of the release, certificates the sites and manages the grid services.
Plan for Measurements Monarc General Meeting 26 July 1999 A. Brunengo - INFN Genova P. Capiluppi - INFN Bologna A. Ghiselli - INFN Cnaf L. Perini - INFN.
LNL CMS M.Biasotto, Bologna, 29 aprile LNL Analysis Farm Massimo Biasotto - LNL.
Grid Resource Allocation Management (GRAM) GRAM provides the user to access the grid in order to run, terminate and monitor jobs remotely. The job request.
November 21, 2002Luca Vaccarossa INFN - Milano1 Interoperability Demos and Atlas applications Luca Vaccarossa (INFN - Milano) ATLAS Software Workshop 21/11/2002.
WP 1 Grid Workload Management Massimo Sgaravatto INFN Padova.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
GRID workload management system and CMS fall production Massimo Sgaravatto INFN Padova.
Status of Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID Workload Management System Massimo Sgaravatto INFN Padova.
Globus activities within INFN Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management Massimo Sgaravatto INFN Padova.
First steps implementing a High Throughput workload management system Massimo Sgaravatto INFN Padova
Grids and Globus at BNL Presented by John Scott Leita.
Status of Globus activities within INFN (update) Massimo Sgaravatto INFN Padova for the INFN Globus group
First ideas for a Resource Management Architecture for Productions Massimo Sgaravatto INFN Padova.
Evaluation of the Globus GRAM Service Massimo Sgaravatto INFN Padova.
INFN Testbed status report L. Gaido WP6 meeting CERN - October 30th, 2002.
The EDG Testbed Deployment Details The European DataGrid Project
History of the National INFN Pool P. Mazzanti, F. Semeria INFN – Bologna (Italy) European Condor Week 2006 Milan, 29-Jun-2006.
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid WP1 Massimo Sgaravatto INFN Padova. WP1 (Grid Workload Management) Objective of the first DataGrid workpackage is (according to the project "Technical.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
A monitoring tool for a GRID operation center Sergio Andreozzi (INFN CNAF), Sergio Fantinel (INFN Padova), David Rebatto (INFN Milano), Gennaro Tortone.
Grid Workload Management Massimo Sgaravatto INFN Padova.
CMS Stress Test Report Marco Verlato (INFN-Padova) INFN-GRID Testbed Meeting 17 Gennaio 2003.
Giuseppe Codispoti INFN - Bologna Egee User ForumMarch 2th BOSS: the CMS interface for job summission, monitoring and bookkeeping W. Bacchi, P.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
Report from USA Massimo Sgaravatto INFN Padova. Introduction Workload management system for productions Monte Carlo productions, data reconstructions.
© Geodise Project, University of Southampton, Geodise Middleware & Optimisation Graeme Pound, Hakki Eres, Gang Xue & Matthew Fairman Summer 2003.
Globus Toolkit Massimo Sgaravatto INFN Padova. Massimo Sgaravatto Introduction Grid Services: LHC regional centres need distributed computing Analyze.
THE INFN GRID PROJECT zScope: Study and develop a general INFN computing infrastructure, based on GRID technologies, to be validated (as first use case)
Proposal for a IS schema Massimo Sgaravatto INFN Padova.
© Geodise Project, University of Southampton, Geodise Middleware Graeme Pound, Gang Xue & Matthew Fairman Summer 2003.
Report on the INFN-GRID Globus evaluation Massimo Sgaravatto INFN Padova for the INFN Globus group
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
Condor on WAN D. Bortolotti - INFN Bologna T. Ferrari - INFN Cnaf A.Ghiselli - INFN Cnaf P.Mazzanti - INFN Bologna F. Prelz - INFN Milano F.Semeria - INFN.
6 march Building the INFN Grid Proposal outline a.ghiselli,l.luminari,m.sgaravatto,c.vistoli INFN Grid meeting, milano.
Summary from WP 1 Parallel Section Massimo Sgaravatto INFN Padova.
Jaime Frey Computer Sciences Department University of Wisconsin-Madison What’s New in Condor-G.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli Wide Area Workload Management Work Package DATAGRID project Parallel session report Cristina Vistoli.
Status of Globus activities Massimo Sgaravatto INFN Padova for the INFN Globus group
Grid Workload Management (WP 1) Massimo Sgaravatto INFN Padova.
INFN “Grid Information Service” evaluation Giuseppe Lo Biondo - INFN Sez. Di Milano Giulietta Vita Finzi - INFN CNAF Padova June
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
First evaluation of the Globus GRAM service Massimo Sgaravatto INFN Padova.
INFSO-RI Enabling Grids for E-sciencE Padova site report Massimo Sgaravatto On behalf of the JRA1 IT-CZ Padova group.
Workload Management Workpackage
Peter Kacsuk – Sipos Gergely MTA SZTAKI
Accounting at the T1/T2 Sites of the Italian Grid
EDT-WP4 monitoring group status report
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
GRID Workload Management System for CMS fall production
Presentation transcript:

Evaluation of the Globus Toolkit: Status Roberto Cucchi – INFN Cnaf Antonia Ghiselli – INFN Cnaf Giuseppe Lo Biondo – INFN Milano Francesco Prelz – INFN Milano Franco Semeria – INFN Bologna Massimo Sgaravatto – INFN Padova Cristina Vistoli – INFN Cnaf Giulia Vita Finzi – INFN Cnaf for the INFN GRID technical group

Goals 5 sites Testbed (Bologna, CNAF, LNL, Padova, Roma1) Use case: HLT CMS studies MC Prod.  Complete HLT chain Services Resource management fork()  Interface to different local resource managers (Condor, LSF) Resources chosen by hand  Broker to implement a Global resource manager Data Mover to stage executable and input files to retrieve output files

Status (24 Jan.) Globus installed on 5 Linux PCs in 3 sites (Bologna, Cnaf, Padova) GSI Seems working MDS Lots of problems accessing the American server !!! Problems with automatic population and update of information Long response time Time out Not possible to test other services (i.e. GRAM)

Status (1 Mar.) Italian MDS Server at CNAF On-going tests: no problems so far 4 PCs already registered (Cnaf, Mi, Pd) GRAM Job submission on remote host works !! On-going installation of Pythia + Cmsim GSIFTP Installed at Cnaf and Padova On-going tests on LAN and WAN Bugs found in the Globus sw

Next steps (Web) tools for MDS browsing Configurations to implement and test: 1.Globus clients accessing Globus Grid 2.Globus jobs submitted to Condor pool Single machine with Globus gatekeeper configured as front end machine with Condor pool Condor pool as Globus resource 3.Condor jobs submitted to Globus Grid (“To- Globus” glide-in Condor jobs) Personal Condor as broker

Globus jobs Globus client Globus Client Accessing Globus GRID Globus Grid

Globus jobs Globus Grid Globus client Globus Client Accessing Globus GRID Condor pool as Globus resource Condor pool Globus gatekeeper

Personal Condor jobs Condor pool Site Y Site X Globus Gatekeeper Globus Gatekeeper Globus Gatekeeper Site Z “ To-Globus” glide-in Condor jobs Personal Condor as broker

Next steps (cont.) Broker Personal Condor High Throughput Broker (now “pretty crude program”) Development of other “smart” brokers ?? Italian Certification Authority