FP6-2004 I-6 Contract 026715 22 November, 2005CGW'05 Kraków Baltic Grid SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES COMMUNICATION NETWORK DEVELOPMENT.

Slides:



Advertisements
Similar presentations
INFSO-RI Enabling Grids for E-sciencE The EGEE project Fabrizio Gagliardi Project Director EGEE CERN, Switzerland Research Infrastructures.
Advertisements

BalticGrid Project BalticGrid SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES COMMUNICATION NETWORK DEVELOPMENT INTEGRATED INFRASTRUCTURE INITIATIVE.
An overview of the EGEE project Bob Jones EGEE Technical Director DTI International Technology Service-GlobalWatch Mission CERN – June 2004.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
1 CENTER FOR PARALLEL COMPUTERS Grid PDC Olle Mulmo
1 1 st Virtual Forum on Global Research Communities Brussels, 12 th July 2007 Mário Campolargo European Commission - DG INFSO Head of Unit “GÉANT and e-Infrastructures”
Enabling, facilitating and delivering quality training in the UK and Internationally The challenge of grid training and education David Fergusson, Deputy.
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
BalticGrid-II Project BalticGrid-II 2nd AHM, May 12 th 2009, Riga1 SA3 Application Integration and Support Hardi Teder EENet.
Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures – Grant Agreement n Regional progress report: Mediterranean.
What is OMII-Europe? Qin Li Beihang University. EU project: RIO31844-OMII-EUROPE 1 What is OMII-Europe? Open Middleware Infrastructure Institute for Europe.
FP I-6 Contract October, 2005EGEE04 Pisa Baltic Grid SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES COMMUNICATION NETWORK DEVELOPMENT.
INFSO-RI Enabling Grids for E-sciencE EGEE-II NA5 – Policy and International Cooperation Fotis Karayannis, Joanne Lawson, CERN NA5.
INFSO-RI Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
CERN, BalticGrid Project Rolandas Naujikas [rolandas nawyeekas] CERN IT/GD Vilnius University Lithuania.
SEE-GRID-SCI Regional Grid Infrastructure: Resource for e-Science Regional eInfrastructure development and results IT’10, Zabljak,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme The EU-IndiaGrid Project Joining.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ?? Athens, May 5-6th 2009 Community Support.
EGEE is proposed as a project funded by the European Union under contract IST EU eInfrastructure project initiatives FP6-EGEE Fabrizio Gagliardi.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
BalticGrid Project Educational Activities of the BalticGrid Project Per Öster KTH, Stockholm Zofia Mosurska CYFRONET, Cracow.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
INFSO-RI Enabling Grids for E-sciencE External Projects Integration Summary – Trigger for Open Discussion Fotis Karayannis, Joanne.
BalticGrid-II Project BalticGrid-II Kick-off meeting, May 2008, Vilnius SA2 - Network Provisioning Katrina Sataki, IMCS UL.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
1 E-infrastructure in Baltic States and its Application in Astrophysics Gražina Tautvaišienė Institute of Theoterical Physics and Astronomy of Vilnius.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: “Policy and International Cooperation”
BalticGrid-II Project EGEE’09, Barcelona1 GRID infrastructure for astrophysical applications in Lithuania Gražina Tautvaišienė and Šarūnas Mikolaitis Institute.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
Dr. Isabel Campos Plasencia (IFCA-CSIC) Spanish NGI Coordinator ES-GRID The Spanish National Grid Initiative.
EGEE Project Review Fabrizio Gagliardi EDG-7 30 September 2003 EGEE is proposed as a project funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE An introduction to EGEE Mike Mineter NeSC Edinburgh
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
Estonian Grid and LHC computing Mario Kadastik On behalf of Estonian Grid Vilnius, Oct '04.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
BalticGrid Focus on Cracow contributions Mariusz Witek IFJ PAN.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
BalticGrid-II Project BG-II kickoff meeting, May 2008, Vilnius1 SA1 Mario Kadastik Operations Director / SA1 activity leader.
PORTA OPTICA STUDY Distributed Optical Gateway to Eastern Europe Artur Binczewski, Miłosz Przywecki, Maciej Stroiński, Wojciech Śronek,
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
JRA2: Quality Assurance
EGEE Contributions to e-Infrastructure policy work
Ian Bird GDB Meeting CERN 9 September 2003
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
FROM GAPS TO CAPS Risk Management Capability Based on Gaps Identification in the Baltic Sea Region (BSR)
Lithuanian GRID – LitGRID Infrastructure, activities, applications
Long-term Grid Sustainability
Nordic ROC Organization
BalticGrid Operations
Presentation transcript:

FP I-6 Contract November, 2005CGW'05 Kraków Baltic Grid SIXTH FRAMEWORK PROGRAMME RESEARCH INFRASTRUCTURES COMMUNICATION NETWORK DEVELOPMENT INTEGRATED INFRASTRUCTURE INITIATIVE Per Öster KTH PDC

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid in One Slide Partners: –10 Leading institutions in six countries in the Baltic Region and Switzerland (CERN) Budget: –3.0 M€ Coordinator: –KTH PDC, Stockholm Compute Resources: –17 resource centres Duration: –30 Months –Started 1 November 2005 SA - Specific Service Activities NA - Networking Activities JRA - Joint Research Activities

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid Objectives Sustainable integration of the research and educational computing and communication infrastructure in the Baltic States into the European Grid infrastructure. Enable the formation of effective research collaborations in the Baltic States, within Europe and beyond. Enabling an efficient sharing of unique instruments and data, as for instance environmental data related to the Baltic Sea.

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid Approach Maximize use of human resources for Grid development and deployment by implementing the Baltic Grid as an extension of EGEE –Grid Operations coordinated with the EGEE North European Regional Operating Centre Assure manageable co-existence with other European Grids –DEISA, CrossGrid, NorduGrid… Engage the Baltic States in Grid related policy and standards activities

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid Partners Estonia –Tallinn, Tartu Lithuania –Vilnius Latvia –Riga Poland –Kraków, Poznan Switzerland –Geneva Sweden –Stockholm

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid Partners Estonian Educational and Research Network, EENet –The Network operator for the Estonian research and educational institutions. Working infrastructure for IPv6, maintainer of Estonian CA and BalticGrid CA (EUGridPMA) Keemilise ja Bioloogilse Füüsika Instituut, NICPB –Estonia's largest independent research institute in the areas of high- energy physics, chemical physics and biophysics with more than 100 researchers. Internationally recognized NMR effort. First Estonian internet connection. First Estonian grid enabled system. Institute of Mathematics and Computer Science, IMCS UL –Latvian leading research institute of mathematics and computer science. Hosts LATNET, the Latvian academic network operator, and is the GEANT partner in Latvia. Partner in BALTNET and host of the first BALTNET conference Riga Technical University, RTU –Technical university strong in materials science, architecture, E- learning. Latvian representative e-IRG. Vilnius University, VU –Leading university in Lithuania with students. Strong areas are mathematics, physics and chemistry. Partner of LITNET

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid Partners (cont) Institute of Theoretical Physics and Astronomy, ITPA –Lithuanian independent research institute in observatory astronomy and fundamental physics. Poznan Supercomputing and Networking Center, PSNC –Leading Polish HPCN centre. Responsible for the Polish academic and educational network PIONIER - early 10G backbone. Partner in several Grid projects like CROSSGRID, GridLab and European Grid Support Centre. Member of the Globus Alliance Instytut Fizyki Jadrowej, im. Henryka Niewodniczanskiego, Polskiej Akademii Nauk, IFJ PAN –Research institute with 200 researchers in the areas of high-energy and subatomic physics and their application. Partner in Grid projects like CROSSGRID and EGEE. Close cooperation with the HPC centre CYFRONET Parallelldatorcentrum at Kungl Tekniska Högskolan, KTH PDC –Leading Swedish technical university. Nine years of experience in Grid technologies. EGEE Northern Europe Regional operating centre. Leads the EGEE Security JRA. GGF security area director. Founding member of the Globus Alliance. Partner in SWEGRID. Founder of the European Grid Support Centre CERN –Leading European Centre in High-Energy Physics and Grid technologies. Leader of EGEE.

FP I-6 Contract November, 2005CGW'05 Kraków Seven Activities Integrated Infrastructure Initiative (I3) Networking Activities –NA1: Management of the I3 –NA2: Education, Training, Dissemination and Outreach –NA3: Application Identification and Support –NA4: Policy and Standards Development Specific Service Activities –SA1: Baltic Grid Operation –SA2: Network Resource Provisioning Joint Research Activity –JRA1: Account Service Level Agreements, Markets and Dynamic Account Management

FP I-6 Contract November, 2005CGW'05 Kraków NA1: Management of the I3 Executive Board –One member per partner. Project Director –Overall responsibility for implementation of project plans Project Management Board –Activity Leaders and Managers –Assure overall project coordination External Advisory Committee Operations Director (SA1) Security Head (SA1) Networks Manager (SA2) Activity Leader: Per Öster (KTH) Budget: 208k€ (7%) Effort: 22 person months (4%)

FP I-6 Contract November, 2005CGW'05 Kraków NA1: Management of the I3 Executive Board Project Management Board (PMB) PD Chair Project Director (PD) KTH (NA1, SA1, SA2) External Advisory Committee Security Head KTH (SA1, SA2) Operations Director NICPB (SA1) Network Manager IMCS UL (SA2) Education, Training, Dissemination, Outreach IFJ PAN (NA2) Application Identification And Support VU (NA3) Policy and Standards Development KTH (NA4) Grid Operations EENet (SA1) Network Resource Provisioning IMCS UL (SA2) SLAs and Account Management KTH (JRA1)

FP I-6 Contract November, 2005CGW'05 Kraków NA2: Education, Training, Dissemination and Outreach By education and training increase the skills among users and resource centres staff By dissemination and outreach spread the benefits of Grid technologies to a broad community of potential users and other interested parties Activity Leader: Zofia Mosurska (IFJ PAN) Budget: 347k€ (12%) Effort: 60 person months (11%)

FP I-6 Contract November, 2005CGW'05 Kraków NA3: Application Identification and Support Identify application areas and communities that can benefit from the BG infrastructure Identify and meet the specific needs of these groups –Requires almost all activities involvement Support and develop the capabilities of the established user communities Activity Leader: Algimantas Juozapavicius (VU) Budget: 489k€ (16%) Effort: 100 person months (18%)

FP I-6 Contract November, 2005CGW'05 Kraków NA3: Application Identification and Support (cont) Pilot Applications –High-Energy Physics –Materials Science –Bioinformatics Special Interests Groups –Gather research groups with similar or related R&D interest such as; Modelling of the Baltic Sea eco system Linguistic research Application Support –Formation of a Application Expert Group

FP I-6 Contract November, 2005CGW'05 Kraków NA4: Policy and Standards Development Engage the BalticGrid partners in international standards and policy shaping activities –GGF, EU GridPMA, e-IRG,… Specific areas; –Infrastructure –Security –Research applications –Grid operations Activity Leader: Olle Mulmo (KTH) Budget: 113k€ (4%) Effort: 20 person months (4%)

FP I-6 Contract November, 2005CGW'05 Kraków SA1: Grid Operations Set up and mange BalticGrid core infrastructure –BalticGrid Certification and Registration Authorities –VO Management –Information Services –Testing and Monitoring Services –Installations and Operations Support –Logging and accounting services –Security infrastructure implementation and enforcement Activity Leader: Lauri Anton (EEnet) Budget: 1266k€ (42%) Effort: 248 person months (44%)

FP I-6 Contract November, 2005CGW'05 Kraków SA2: Network Resource Provisioning Assure and monitor proper network provisioning and associated services –Analyse BG network requirements –Develop Service Level Specifications and Agreements –Monitoring of the Grid with regard to SLA compliance Activity Leader: Guntis Barzdins (IMCS UL) Budget: 368k€ (12%) Effort: 72 person months (13%)

FP I-6 Contract November, 2005CGW'05 Kraków National Networks Latvia

FP I-6 Contract November, 2005CGW'05 Kraków National Networks Lithuania

FP I-6 Contract November, 2005CGW'05 Kraków National Networks Estonia

FP I-6 Contract November, 2005CGW'05 Kraków JRA1: SLAs, Markets and Dynamic Account Management Investigate and prototype standard conforming and secure mechanisms for SLAs in BG Design, development and integration of user account management with Grid accounting systems (SGAS) Research, prototype and support deployment of SLAs in BalticGrid Activity Leader: Thomas Sandholm (KTH) Budget: 230k€ (7%) Effort: 38 person months (7%)

FP I-6 Contract November, 2005CGW'05 Kraków Timeline 30 Months –Start November 2005 –End April 2008 –In phase with EGEE-II –43 Deliverables –42 Milestones

FP I-6 Contract November, 2005CGW'05 Kraków Timeline First review Second Review P12P30P P18P EAC 1 st AHM 2 nd AHM3 rd AHM Summer School Kick-off

FP I-6 Contract November, 2005CGW'05 Kraków Timeline Operations P12P30P P18P Certified sites 6+4 Certified sites 2 SIGs per Country 4 SIGs per Country Core Grid Services

FP I-6 Contract November, 2005CGW'05 Kraków Use Targets Target Project month 12Project Month 24Project Month 30 Number of Users Number of Disciplines Number of Application Codes 3620 Number of International Collaborations Number of Compute hours per Year 1 x x x 10 6

FP I-6 Contract November, 2005CGW'05 Kraków Use Targets Scaling

FP I-6 Contract November, 2005CGW'05 Kraków Relationship to EGEE and other Grid Projects Collaborating or Related Grid Projects –EGEE Infrastructure, Operations –ICEAGE Education and Training –BELIEF Dissemination and Outreach –eIRGSP Policy and Standards Development

FP I-6 Contract November, 2005CGW'05 Kraków Relationship to EGEE and other Grid Projects Middleware –gLite Infrastructure –EGEE Applications –Application Pilots –Regional Special Interest Groups ETDO –Own activities as well as joint activities with EGEE(-II) and ICEAGE Policy Issues –NA4: Policy and Standards Development eIRG GGF EUGridPMA

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference; Pisa, October 24, 2005 NA5 and EGEE related projects NA5 = Policy and International Cooperation Policy-related activities –Mostly focusing on backing the eInfrastructure Reflection Group ( “supporting the creation of a framework for the easy and cost-effective shared use of electronic resources in Europe”  Pursued mainly through a series of policy related White Papers and Roadmap documents, along with related Workshops International Cooperation activities: –With other projects including “concertation” activities (i.e. interacting with a cluster of related projects – forum of exchanging ideas) –With other geographical regions (North America, Asia Pacific, Russia, South America) –With standardisation bodies (GGF et al)

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference; Pisa, October 24, 2005 Related Projects

FP I-6 Contract November, 2005CGW'05 Kraków BalticGrid and EGEE BalticGrid integration with EGEE –EGEE “four pillars of operation” Grid Operations Database: GOCDB Monitoring tool set: SFT2 Problem tracking tool: GGUS Integration of operations: CIC portal gLite

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference; Pisa, October 24, 2005 A Selection of Monitoring tools 1. GIIS Monitor2. GIIS Monitor graphs 3. Sites Functional Tests 4. GOC Data Base 5. Scheduled Downtimes 6. Live Job Monitor 7. GridIce – VO view8. GridIce – fabric view9. Certificate Lifetime Monitor Note: Those thumbnails are links and are clickable.

Enabling Grids for E-sciencE INFSO-RI th EGEE Conference; Pisa, October 24, 2005 Today gLite Special Release for SC File Transfer Service gLite Service Release gLite Special Release for SC File Transfer Service gLite Releases and Planning April 2005 May 2005 July 2005 Aug 2005 Sep 2005 Oct 2005 Nov 2005 Dec 2005 Jan 2006 Feb 2006 June 2005 gLite 1.0 Condor-C CE gLite I/O R-GMA WMS L&B VOMS Single Catalog gLite 1.1 File Transfer Service Metadata catalog Functionality gLite 1.2 File Transfer Agents Secure Condor-C gLite 1.3 File Placement Service FTS multi-VO Refactored RGMA & CE gLite 1.4 VOMS for Oracle SRMcp for FTS WMproxy LBproxy DGAS QF1.0.12_01_2005 QF1.0.12_02_2005 QF1.0.12_03_2005 QF1.0.12_04_2005 QF1.1.0_05_2005 QF1.1.0_06_2005 QF1.1.0_07_2005 QF1.1.0_08_2005 QF1.1.0_09_2005 QF1.1.0_10_2005 QF1.1.2_11_2005 QF1.1.2_12_2005 QF1.1.2_13_2005 QF1.1.2_16_2005 QF1.2.0_14_2005 QF1.2.0_15_2005 QF1.3.0_17_2005 QF1.3.0_18_2005 QF1.3.0_19_2005 gLite 1.5 Functionality Freeze gLite 1.5 Release Date QF1.3.0_20_2005 QF1.3.0_22_2005 QF1.3.0_21_2005 QF1.3.0_23_2005 QF1.3.0_24_2005

FP I-6 Contract November, 2005CGW'05 Kraków