Measuring Concrete Work

Slides:



Advertisements
Similar presentations
Chapter 5 Measuring Carpentry Work. Board Measure Most lumber is dressed; this means that surfaces are sanded, which reduces the size of cross section.
Advertisements

Measuring Carpentry and Miscellaneous Items
FORMWORK Prof Awad S. Hanna.
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Summary Sheet Session Number : Date : Subject Expert : Dr. M.C. Nataraja Professor Department of Civil Engineering, S.J. College of Engineering,
Prof Awad S. Hanna Concrete Structures Concrete Structures.
The line sketch with modified height for the plinth floor is displayed.
Reinforced Concrete QTO Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
By Dr. Julia Arnold
Group Member: Desiree Andrade Larry Molina Fernando Tejeda Thin Shell Structures.
Chapter 3 Measuring Excavation and Sitework
Measuring Sitework, Excavation, and Piling
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
Arch 330 Fall 2008 FORMWORK AND REINFORCING FOR CONCRETE.
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Chapter 6 Measuring Masonry and Finishes. Masonry Work Generally It includes clay bricks, concrete bricks and blocks, clay tiles, and natural and artificial.
Competency: Draw Foundation Plans
Floor Systems and Foundation Support
It’s more than adding and subtracting..  Before bidding, the site should be examined for the following:  Distance from the office  Site conditions.
Chapter 18 Foundations.
CONSTRUCTING A FIVE CABIN LATRINE
March 13, 2007 DRILL Architecture Styles and Vocabulary QUIZ tomorrow
BCT 102 Residential Printreading
Measuring Masonry Work
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Chapter 4 Measuring Concrete Work
Chapter 2b Foundations Shallow & Deep Foundations.
N. PRESTON, M. MARTIN CERT IV ESTIMATING 2012 Part Lesson 4 – Slab on Ground IDENTIFY AND PRODUCE ESTIMATED COSTS FOR PROJECTS.
Sinking in Concrete Calculating materials for a concrete job.
Measurement GCRCT Review
Our learning goal is to be able to solve for perimeter, area and volume. Learning Goal Assignments 1.Perimeter and Area of Rectangles and Parallelograms.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
Foundation Prints Unit 12.
1 HVACR116 – Trade Skills Structural Drawings. 2.
FORMS, SCAFFOLDING and STAGING
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Radius & Diameter Volume.
Chapter 1.7 Notes: Find Perimeter, Circumference, and Area
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
Section 10 – 6 Volume Of Pyramids& Cones
Chapter 23: Structural Drafting
Competency: Draw Foundation Plans Objective: Identify terminology related to foundation plans.
Orthographic Drawings
Week 7 Legends and Schedules. Objective This chapter discusses legends and schedules: what they are, the components they are used for, and how to draw.
Chapter 10 Lesson 6 Objective: To find the volume of a pyramid and a cone.
Bell Work: What is the volume of the box with the dimensions shown? 4 inches 5 inches 9 inches.
BUILDING CONSTRUCTION
ESTIMATING STEEL FOR CONCRETE POURS. REBAR -Estimated by the pound or ton -Must know the size of steel bar needed -Must know linear feet needed -Bars.
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Leads Institute of Technology & Engineering
Foundation – jay Desai.
Chapter 1 Introduction.
Introduction Used for covering spaces in the form of roof or floor
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
Objective: To find the volume of a pyramid and a cone.
FORMWORK DR. Nabil Dmaidi.
Drawing Interpretation
Estimating the Cost for the Concrete Pad
Estimating the Cost for the Concrete Pad
Grout and Other Reinforcement Module
Estimating the Cost for the Concrete Pad
Competency: Draw Foundation Plans
Concrete Structures DR. Nabil Dmaidi.
Building Construction I Sofia Sebastian 1
Competency: Draw Foundation Plans
Estimating the Cost for the Concrete Pad
Concrete A structural material made by combining cement, sand, aggregate, and water.
Estimating the Cost for the Concrete Pad
Presentation transcript:

Measuring Concrete Work Chapter 5 Measuring Concrete Work

Objectives Upon completion of this chapter, you will be able to: Explain how concrete work, formwork, and associated items are measured in a takeoff Explain how concrete and formwork are classified in the takeoff process Measure concrete foundations from drawings and specifications

Objectives (cont’d.) Describe how reinforcing steel is measured Complete a manual takeoff of concrete foundations Complete a computer takeoff of concrete foundations using Excel spreadsheets and MC2 ICE software

Measuring Concrete Work Combination of items are measured Shown or inferred Concrete volume Formwork requirements Finishes needed Measure all work associated with one assembly Before moving to the next

Measuring Notes—Concrete In general: Measure in cubic yards net in place Don’t adjust quantity for reinforcing steel and insets Classify concrete and measure separately Measure mixes separately Measurement/pricing of columns, walls, and beams dependent on placement/pouring

Measuring Formwork Formwork operations Involve a number of activities Allowed for in pricing of forms Contact area is measured Establish surfaces of concrete that require forms

Measuring Notes—Formwork Generally: Measured in square feet of contact area Same category classifications as concrete Bulkheads and edge forms are measured separately Forms to slab edges are measured separately From forms to beams and forms to walls

Measuring Notes—Formwork (cont’d.) Openings in form systems No deduction made from total area if size of opening is less than 100 square feet Describe items that are linear in nature Describe forms to circular columns Diameter Measure in feet to column height

Measuring Notes—Finishes and Miscellaneous Work Include: Slab finishes Screeds and curing slabs Welded wire mesh Inserts and waterstops Expansion joints Nonshrink grout Saw cutting concrete Reinforcing steel

FCE Office Foundation Takeoff Using ICE Software Sitework for the FCE Office Takeoff of foundations Followed by slabs Refer to Pages 126 through 135

Figure 5.8 Dimension Entries (Delmar/Cengage Learning)

Figure 5.9 Specification Entries (Delmar/Cengage Learning)

Figure 5.10 Takeoff Entry Answers (Delmar/Cengage Learning)

Figure 5.11 Visual Takeoff Sketch (Delmar/Cengage Learning)

Figure 5.12 Pad Footing Entries (Delmar/Cengage Learning)

Figure 5.13 Perimeter Wall Entries (Delmar/Cengage Learning)

Figure 5.14 Column Pier Entries (Delmar/Cengage Learning)

Figure 5.15 Estimate Window (Delmar/Cengage Learning)

Figure 5.16 Slab-on-Grade Entries (Delmar/Cengage Learning)

Figure 5.17 Second Floor Slab Entries (Delmar/Cengage Learning)

Figure 5.18 Estimate Window (Delmar/Cengage Learning)

Summary Preparing a quantity takeoff of concrete Requires measurement of a combination of items Concrete: measured in cubic yards or cubic meters net in place Formwork: measured in square feet or square meters of contact area Concrete finishes: measured in square feet or square meters